Appointment of a main contractor to construct two two-bay fire stations, including office, training and welfare facilities, at Baltinglass and Dunlavin, County Wicklow.

fire stationsconstructionmain contractor

Plats

Baltinglass and Dunlavin, County Wicklow, Ireland

Tjänsteperiod

18 months

Kontraktsvärde

6 500 000 €

Deadline

12.11.2026 • 12:00

18

Dagar

Design and install a solar photovoltaic system, battery energy storage system and two electric vehicle charging points at the National Bioeconomy Pilot Plant in Lisheen.

Solar PVBattery energy storageEV charging points

Plats

Lisheen, County Tipperary, Ireland

Tjänsteperiod

8 months

Kontraktsvärde

400 000 €

Deadline

30.10.2026 • 14:00

5

Dagar

7No. Bed Residential Units at Tierney Street

●St. John of God Housing Association CLG

Construction of seven new residential units at Tierney Street, Ardee, County Louth, for St. John of God Community Services.

residential unitsconstructionbed units

Plats

Ardee, County Louth, Ireland

Tjänsteperiod

15 months

Kontraktsvärde

1 700 000 €

Deadline

30.10.2026 • 15:00

5

Dagar

Construct a new pedestrian and cyclist gateway connection to the Sport Ireland Campus via the Tolka Gateway route, including pathway upgrades, underground utilities, drainage, public lighting, CCTV, retaining structures, site access and associated civil and electrical engineering works.

pedestrian gatewaycyclist connectiondrainage infrastructure

Plats

Dublin, Ireland

Tjänsteperiod

4 months

Kontraktsvärde

1 500 000 €

Deadline

28.10.2026 • 12:00

3

Dagar

Establish a single-supplier framework for the phased supply, delivery, installation and support of an enterprise-grade campus sensing solution. The initial call-off covers anonymous occupancy and space-utilisation sensing in timetabled teaching spaces. The solution must integrate with Trinity College Dublin’s existing enterprise network and information systems. At the authority’s discretion and subject to budget, later call-offs may cover building occupancy, environmental and energy/sub-metering sensing.

campus occupancy sensingspace utilisationsensor installation

Plats

Dublin, Ireland

Tjänsteperiod

48 months

Kontraktsvärde

1 000 000 €

Deadline

03.11.2026 • 14:00

9

Dagar

Establish and operate a single-party framework for a GIS mapping solution, providing support, development, maintenance and associated services for current and future requirements. Scope includes GIS infrastructure, ArcGIS platform support, data management, accessibility, integration, analytics, governance and ongoing operational support.

GIS mappingArcGIS supportdata management

Plats

Ireland

Tjänsteperiod

4 years

Kontraktsvärde

750 000 €

Deadline

02.11.2026 • 11:00

8

Dagar

Maintenance, repair, inspection, testing, certification and associated support services for CRC hoisting and care equipment, including overhead and mobile hoists, changing tables, pool hoists, shower trolleys and weighing devices. Supply spare parts and replacement components where required.

maintenancerepairinspection

Plats

Dublin, Ireland

Tjänsteperiod

60 months

Kontraktsvärde

96 000 €

Deadline

12.11.2026 • 12:00

18

Dagar

●Transport Infrastructure Ireland (TII)

Design and construction of the 4 km Luas Green Line extension infrastructure, including track, four stops, Broombridge stabling works, a 350-space Park and Ride, bridges, utilities, road and active-travel works, overhead catenary, power and rail systems, and associated urban realm and ancillary works. Includes systems integration, coordination with other works packages and stakeholders, testing and commissioning.

Luas Finglaslight railtrack

Plats

Dublin, Ireland

Tjänsteperiod

54 months

Kontraktsvärde

250 000 000 €

Deadline

14.12.2026 • 11:00

50

Dagar

Specialist design, supply, installation, testing, commissioning, establishment and aftercare of a hybrid stitched natural grass pitch and complete irrigation system at Dalymount Park. The appointed specialist is intended to be novated to the Works Contractor appointed under PW-CF1.

hybrid natural grass pitchpitch installationirrigation system

Plats

Dublin, Ireland

Tjänsteperiod

12 months

Kontraktsvärde

4 400 000 €

Deadline

04.11.2026 • 12:00

10

Dagar

New Plumbing Training Workshop at Banagher Further education and Training Centre

●Laois and Offaly Education and Training Board (Offaly)

Construct a single-storey training workshop with work spaces, an office, ancillary accommodation and all associated site works at Banagher Further Education and Training Centre.

constructiontraining workshopplumbing

Plats

Banagher, County Offaly, Ireland

Tjänsteperiod

7 months

Kontraktsvärde

600 000 €

Deadline

27.10.2026 • 17:30

2

Dagar

Relaterade Upphandlingar inom Byggverksamhet

Upptäck andra möjligheter inom samma bransch

Maintenance Dredging Contract

Southeast Ireland, Ireland

maintenance dredgingnavigational channelturning circle

Deadline

23.11.2026

29

Dagar

Proposed Community Development, Kildimo, Co. Limerick

Kildimo, County Limerick, Ireland

Deadline

13.11.2026

19

Dagar

Sallins Park and Amenity Lands Development

Sallins, County Kildare, Ireland

Deadline

25.11.2026

31

Dagar

Circle Heating Tender 2026

Ireland

Deadline

02.12.2026

38

Dagar

Ballyhaunis Library and Community Hub Project

Ballyhaunis, County Mayo, Ireland

Deadline

11.12.2026

47

Dagar

WCCC26 543 Refurbishment of 3 and 4 Georges Street Waterford

Waterford City, Ireland

Deadline

23.11.2026

29

Dagar

Prior Information Notice Electrical Installation upgrade at Booterstown NS

Booterstown, Dublin, Ireland

Deadline

02.11.2026

8

Dagar

R232 Glenmore Bridge Widening and Road Realignment Scheme

Glenmore, County Donegal, Ireland

Deadline

20.11.2026

26

Dagar