Hitta ditt perfekta kontrakt.
Sök upphandlingar via företag direkt
Rubycon Developments Limited
Byggverksamhet
Rubycon Developments Limited är verksam inom Byggverksamhet.
Upphandlingar för Byggverksamhet
Branschbaserade träffar
Dessa upphandlingar matchas baserat på företagets bransch och land. Premiumanvändare kan göra anspråk på detta företag och lägga till de saknade uppgifterna för att hitta mer exakta träffar. See plan details
●Cavan County Enterprise Fund
Upgrade works to the existing Cootehill Enterprise Centre, comprising thermal performance improvements and environmental upgrades to the external building envelope and façade systems. The works are divided into five separate options: Option 1 – Non-Insulated Façade Upgrade; Option 2 – Insulated Façade Upgrade; Option 3 – Window and Door Replacement; Option 4 – Photovoltaic Panels; Option 5 – Internal Wall Insulation. Tenderers shall allow for all labour, materials, plant, access, temporary works, coordination and ancillary works necessary to provide a complete installation for each option.
Plats
Cavan, Ireland
Tjänsteperiod
6 Months
Kontraktsvärde
250 000 €
Deadline
16.10.2026 • 12:00
2
Dagar
Garden Design for Knockreer Gardens Killarney National Park
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
Tenders are being sought for the preparation of a Conservation Design and Development Plan (CDDP) focused on the long-term practice of conservation horticulture at Knockreer House Gardens. The CDDP will be guided by best international practice in conservation design and interpretation.
Plats
Wexford, Ireland
Tjänsteperiod
12 Months
Kontraktsvärde
70 000 €
Deadline
27.01.2027 • 15:00
105
Dagar
Establishment of a multi-party Integrated Design Team Framework
●Trinity College Dublin the University of Dublin_336
●Trinity College Dublin the University of Dublin_336
Provision of a multi-party Integrated Design Team Framework Trinity College Dublin (Trinity / TCD) Capital Programmes Office has a need to establish an Integrated Design Team (IDT) Framework Panel (the Framework / Panel) to support the organisation's capital works programme. The Framework adopts a multi-disciplinary model in which one Principal Service Provider (PSP) shall be nominated as Lead Consultant for each Call-Off, assuming responsibility for coordination and delivery of the Integrated Design Team. The Framework will provide a compliant, efficient, and high quality mechanism for appointing multi-disciplinary design teams across multiple projects over a defined period. It will ensure consistency of design quality, value for money, and adherence to procurement regulations. The Framework shall operate within the scope of the Capital Works Management Frameworks (CWMF) and National and EU procurement regulations.
Plats
Dublin, Ireland
Tjänsteperiod
48 Months
Kontraktsvärde
12 500 000 €
Deadline
19.10.2026 • 16:30
6
Dagar
Main Street and Barrack Street, Belmullet, Co. Mayo
●Erris Chamber of commerce
●Erris Chamber of commerce
Supply, delivery and installation of a permanent, programmable LED street lighting system on Main Street and Barrack Street, Belmullet, Co. Mayo, including a catenary support system, LED fittings, control system, associated electrical works and two road crossings.
Plats
Belmullet, Ireland
Tjänsteperiod
3 Months
Kontraktsvärde
100 000 €
Deadline
28.10.2026 • 12:00
14
Dagar
Shesknan Bridge Works
●Leitrim County Council_2136
●Leitrim County Council_2136
The project involves the replacement/rehabilitation of a single-span road bridge in poor structural condition and has partially collapsed. Works will focus on the replacement of bridge deck and parapet walls, abutment and wingwall re-pointing, vegetation clearance, and associated ancillary works. Shesknan Bridge is a single-span masonry arch bridge of approximately 6m span, supporting a local road crossing over a natural watercourse. The bridge consists of a masonry arch barrel, stone sidewalls and parapets, with a relatively shallow depth of fill material supporting the road surface above. The recommended solution for the bridge is full replacement. This addresses advanced deterioration including reinforcement corrosion, section loss and spalling, which render repair-only strategies uneconomical and short-lived. Additional works are anticipated to include the following: Site mobilisation and establishment, Temporary works and access provision, Demolition of defective components, Parapet, abutment and wingwall works, Vegetation clearance and habitat measures, Road reinstatement, surfacing and safety barrier installation, Final inspection and handover.
Plats
Leitrim, Ireland
Tjänsteperiod
12 Months
Kontraktsvärde
500 000 €
Deadline
20.10.2026 • 12:00
6
Dagar
●Dublin City Council
Architect led Integrated design team services for Dublin City Council to deliver the fire Safety remediation of buildings of a variety of uses under Dublin City Council ownership or partial ownership. The single party framework agreement will be established on foot of an initial contract for whole stages (Stage (i) Preliminary – Stage (v) Handover of Works) delivery of professional services in relation to the fire remediation works at a 7 storey mixed use development in Dublin City Centre, consisting of 62 residential apartments, retail units, podium car-park and approximately 3,000sqm of community facilities.
Plats
Dublin, Ireland
Tjänsteperiod
4 Years
Kontraktsvärde
7 000 000 €
Deadline
19.10.2026 • 12:00
5
Dagar
Coole Park Water Supply Upgrade
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
Installation of a new watermain, water storage tank, treatment shed and service ducting in Coole Park Nature reserve
Plats
Coole Park Nature reserve, Ireland
Tjänsteperiod
3 Months
Kontraktsvärde
500 000 €
Deadline
16.10.2026 • 12:00
2
Dagar
Supply of Driving Simulators for HGV Rigid and Articulated Trucks, Buses, Forklifts and Vans and also Tractor Driving Simulators to Waterford and Wexford Education and Training Board
●Waterford and Wexford Education and Training Board_110494
●Waterford and Wexford Education and Training Board_110494
Supply of Driving Simulators for HGV Rigid and Articulated Trucks, Buses, Forklifts and Vans
Plats
Dublin, Ireland
Tjänsteperiod
4 Years
Kontraktsvärde
1 450 000 €
Deadline
21.10.2026 • 12:00
7
Dagar
Framework Agreement for Cost Consultancy, Quantity Surveying and Advisory Services for the Croí Cónaithe (Cities) Scheme
●Housing and Sustainable Communities Agency
●Housing and Sustainable Communities Agency
Cost Consultancy and Advisory Services for the Croí Cónaithe (Cities) Scheme
Plats
Dublin, Ireland
Tjänsteperiod
2 Years
Kontraktsvärde
450 000 €
Deadline
16.10.2026 • 17:00
3
Dagar
Scragh Bog Wooden Boardwalk Removal and Replacement
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
Removal and rebuild by hand a wooden boardwalk of approximately 250 metres in length using FSC Douglas Fir. Removal includes embedded wooden support posts. Rebuild includes 2 No. boardwalk crossings, 3 No. passing points and 4 No. wooden benches
Plats
Ballynagall, Co. Westmeath, Ireland
Tjänsteperiod
3 Months
Kontraktsvärde
250 000 €
Deadline
19.10.2026 • 12:00
5
Dagar
Relaterade Upphandlingar inom Byggverksamhet
Upptäck andra möjligheter inom samma bransch