Hitta ditt perfekta kontrakt.

Sök upphandlingar via företag direkt

Expertsökning
RU

Rubycon Developments Limited

Byggverksamhet

Irland

Rubycon Developments Limited är verksam inom Byggverksamhet.

Upphandlingar för Byggverksamhet

Branschbaserade träffar

Dessa upphandlingar matchas baserat på företagets bransch och land. Premiumanvändare kan göra anspråk på detta företag och lägga till de saknade uppgifterna för att hitta mer exakta träffar. See plan details

Develop and construct a veterinary teaching hospital at ATU’s Knocknamona campus, including small-animal, large-animal and equine facilities, pathology, animal accommodation, external yards and associated infrastructure. Deliver the development in phases, with the initial hospital able to operate independently as a clinical facility.

Plats

Letterkenny, County Donegal, Ireland

Tjänsteperiod

22 months

Kontraktsvärde

25 000 000 €

Deadline

09.11.2026 • 12:00

29

Dagar

●Tipperary County Council

Carry out painting works at the National Biorrefinery Pilot Plant.

Plats

Tipperary, Ireland

Tjänsteperiod

1 month

Kontraktsvärde

110 000 €

Deadline

19.10.2026 • 14:00

8

Dagar

Doctor Mc Garry Housing Milltown Phase 2

●Milltown Housing Association Ltd

Construct a single-storey, one-bedroom dwelling and create an apartment within part of the existing community centre. Include all ancillary site development works.

Plats

Milltown, County Galway, Ireland

Tjänsteperiod

15 months

Kontraktsvärde

700 000 €

Deadline

06.11.2026 • 16:00

26

Dagar

Provide building services (mechanical and electrical) consultancy for decentralizing the campus central heating system at University Hospital Galway, through the existing Zone B Enabling Works Framework.

Plats

Galway, Ireland

Tjänsteperiod

42 months

Kontraktsvärde

160 000 €

Deadline

02.11.2026 • 12:00

22

Dagar

Provide mechanical and electrical contracting services, inclusive of PSCS, for gas upgrade works at Coláiste Mhuire Co-Ed, Castlemeadows, Thurles, Co. Tipperary.

Mechanical and electrical worksGas upgradePSCS

Plats

Thurles, County Tipperary, Ireland

Tjänsteperiod

15 months

Kontraktsvärde

67 000 €

Deadline

30.10.2026 • 12:00

19

Dagar

Gracefield Road to Vernon Avenue

●Dublin City Council

Construct the Gracefield Road to Vernon Avenue Active Travel Scheme along a 2.6 km route. Works include protected cycle lanes in both directions, footpath and junction upgrades, carriageway reconfiguration, site clearance, pavement and kerb works, traffic islands, public lighting, signs and road markings, drainage, traffic signals and ducting, utilities, landscaping and urban realm works, bike stands, and temporary traffic management. Upgrade seven signal-controlled junctions.

active travel schemeprotected cycle lanespedestrian facilities

Plats

Dublin, Ireland

Tjänsteperiod

18 months

Kontraktsvärde

6 130 000 €

Deadline

27.10.2026 • 16:00

16

Dagar

Provide a multidisciplinary, engineering-led consultancy team for engineering and appraisal services to support the Port Access Northern Cross Route Phase 3 through procurement, construction and closeout. The project involves approximately 1.08 km of new carriageway, a rail underbridge approximately 10.5 m wide and 20 m long, and ancillary works.

Technical consultancyengineering appraisalroad construction

Plats

Louth, Ireland

Tjänsteperiod

30 months

Kontraktsvärde

1 500 000 €

Deadline

02.11.2026 • 12:00

22

Dagar

●An Post_391

Supply, installation and commissioning of solar photovoltaic systems at An Post properties throughout the Republic of Ireland, with maintenance during the applicable warranty period. The system may also be used for later call-offs for support, maintenance and/or ongoing enhancements, without guaranteed volume.

Solar PV systemssolar panelsinstallation

Plats

Republic of Ireland

Tjänsteperiod

2026-11-04 -; 10 years; An Post reserves the right to extend or close the panel early in line with Operational Requirements; maintenance during the applicable warranty period

Deadline

30.11.2031 • 23:59

1876

Dagar

●Office of the Revenue Commissioners_366

Provide a maritime data analysis system that captures, collects, stores, searches, queries, visualises and updates maritime big data; analyses maritime risks and identifies or categorises high-risk threats; and produces risk alerts or profiles, periodic strategic overviews and maritime area analyses for border, coast guard and law enforcement authorities.

Maritime data analysis systemmaritime big datamaritime risk analysis

Plats

Ireland

Tjänsteperiod

84 months

Kontraktsvärde

1 800 000 €

Deadline

06.11.2026 • 12:00

26

Dagar

Supply and fit a new gas central heating system at Scoil Úna Naofa Primary School, including mechanical and engineering works. The existing 30-year-old system is at end of life; works are to be completed in the school basement.

gas central heatingmechanical servicesengineering services

Plats

Crumlin, Dublin 12, Ireland

Tjänsteperiod

9 months

Kontraktsvärde

365 000 €

Deadline

06.11.2026 • 17:00

26

Dagar

Relaterade Upphandlingar inom Byggverksamhet

Upptäck andra möjligheter inom samma bransch

Doctor Mc Garry Housing Milltown Phase 2

Milltown, County Galway, Ireland

Deadline

06.11.2026

26

Dagar

National Biorrefinery Pilot Plant painting works

Tipperary, Ireland

Deadline

19.10.2026

8

Dagar

Grand Canal Greenway Phase 2 For Kildare County Council

Kildare, Ireland

Grand Canal Greenwaytrail wideningtrail resurfacing

Deadline

12.11.2026

32

Dagar

Electrical Infrastructure Upgrade Works and Establishing a Framework Agreement at St James's Hospital

Dublin, Ireland

Electrical infrastructureUpgrade worksFramework agreement

Deadline

05.11.2026

25

Dagar

De La Salle College Dundalk, Co. Louth

Dundalk, County Louth, Ireland

school extensionASD unitsite entrance

Deadline

26.10.2026

15

Dagar

Mechanical and Engineering services to supply and fit new Gas Central Heating System in Scoil Úna Naofa Primary School, Crumlin, Dublin 12.

Crumlin, Dublin 12, Ireland

gas central heatingmechanical servicesengineering services

Deadline

06.11.2026

26

Dagar

Technical Consultancy Services for Port Access Northern Cross Route (PANCR) Phase 3 - (TII Phases 5-7)

Louth, Ireland

Technical consultancyengineering appraisalroad construction

Deadline

02.11.2026

22

Dagar

Gracefield Road to Vernon Avenue

Dublin, Ireland

active travel schemeprotected cycle lanespedestrian facilities

Deadline

27.10.2026

16

Dagar