Hitta ditt perfekta kontrakt.

Sök upphandlingar via företag direkt

Expertsökning
RE

Reynolds Surveying

Byggverksamhet

Navan, Meath, Irland
GP PracticeGeneral PracticeMedical Card

Matchande Upphandlingar

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Plats

Ireland

Tjänsteperiod

39 Months

Maxvärde

300.000 €

Deadline

25.08.202614:00

24

Dagar

LiDAR and orthoimagery services for National Parks and Wildlife Service (NPWS), Department of Housing, Local Government and Heritage NPWS (DHLGH)

Department of Housing Local Government and Heritage

Bereitstellung von LiDAR- und Orthofotodiensten für den National Parks and Wildlife Service (NPWS) der Department of Housing, Local Government and Heritage, für Zwecke der ökologischen und ingenieurtechnischen Kartierung für eine Reihe von Überwachungs- und Managementprojekten und -programmen.

LiDAROrthofotografieKartierung

Plats

Dublin, Irland

Tjänsteperiod

4 Jahre

Maxvärde

4.600.000 €

Deadline

05.08.202613:00

4

Dagar

Asbestos Surveys in PMVT buildings/locations

Peter McVerry Trust_121127

By understanding the volume of asbestos present in properties, PMVT can proactively manage and hold an up to date register of known asbestos within our stock while also giving the ability to put in place appropriate safeguards and plan for future safety works to manage the issue if and when required.

AsbestosSurveyingSafety

Plats

Ireland

Tjänsteperiod

48 Months

Deadline

19.08.202615:30

18

Dagar

Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme

Tipperary County Council

Identification, design and submission for planning consent of a Flood Relief Scheme, completion of detailed design, and procurement, management and oversight of the construction of the Scheme. Tasks include engineering and environmental consultancy services.

EngineeringEnvironmentalFlood Relief

Plats

Ireland

Tjänsteperiod

108 Months

Maxvärde

3.000.000 €

Deadline

02.09.202610:00

32

Dagar

TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council

Cavan County Council

Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).

ZivilingenieurwesenArchitekturStadtplanung

Plats

Cavan, Irland

Tjänsteperiod

18 Monate

Deadline

07.08.202610:00

6

Dagar

Relaterade Upphandlingar inom Byggverksamhet

Upptäck andra möjligheter inom samma bransch

SCOIL CROINE NATIONAL SCHOOL

Donegal, Irland

EntwässerungSportplatzSanierung

Deadline

19.08.2026

18

Dagar

IDA Parkmore Biodiversity Enhancement Proje

Oranmore, County Galway, Irland

LandschaftsgestaltungBiodiversitätPflanzung

Deadline

28.08.2026

27

Dagar

FIN-21 - Architectural and Project Management Services

Dublin, Irland

ArchitekturProjektmanagementBüroumbau

Deadline

28.08.2026

27

Dagar

Fit out of Roanmore unit in Waterford for Corlann

Waterford, Irland

BauausführungInnenausbauTagesservice

Deadline

03.09.2026

34

Dagar

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Deadline

28.08.2026

27

Dagar

Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme

Dublin, Irland

BauarbeitenRadinfrastrukturFußwege

Deadline

27.08.2026

27

Dagar

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Deadline

01.09.2026

32

Dagar

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Deadline

04.09.2026

34

Dagar

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Deadline

25.07.2036

3646

Dagar

Enabling works for new glasshouse at Glenveagh National Park

West, Irland

BauarbeitenNeubauSanierung

Deadline

03.09.2026

33

Dagar

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Deadline

20.08.2026

19

Dagar

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Deadline

26.08.2026

25

Dagar

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Deadline

25.08.2026

24

Dagar

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Deadline

28.08.2026

27

Dagar

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Deadline

28.08.2026

27

Dagar