Hitta ditt perfekta kontrakt.

Sök upphandlingar via företag direkt

Expertsökning
MC

McElroy Associates

Byggverksamhet

Dublin, Dublin, Irland
Mechanical EngineeringHVAC EngineeringCivil Engineering

Matchande Upphandlingar

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.

Mechanical EngineeringElectrical EngineeringDesign Services

Plats

Dublin, Ireland

Tjänsteperiod

84 Months

Maxvärde

1.200.000 €

Deadline

24.08.202610:00

25

Dagar

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Plats

Ireland

Tjänsteperiod

39 Months

Maxvärde

300.000 €

Deadline

25.08.202614:00

26

Dagar

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Plats

Kilkenny, Ireland

Tjänsteperiod

12 Months

Deadline

01.09.202610:00

33

Dagar

TR5679 - Mechanical and Electrical Professional Services

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.

Engineering designMechanical servicesElectrical services

Plats

Dublin, Ireland

Tjänsteperiod

7 Months

Maxvärde

1.200.000 €

Deadline

17.08.202610:00

18

Dagar

Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service

Roscommon County Council_424

Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon

EngineeringCivil EngineeringHighways

Plats

Roscommon, Ireland

Tjänsteperiod

3 Years

Deadline

07.08.202614:00

8

Dagar

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly

Offaly County Council_448

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)

Bridge rehabilitationStructural engineeringDesign consultancy

Plats

Ireland

Tjänsteperiod

60 Months

Maxvärde

2.000.000 €

Deadline

14.08.202614:00

15

Dagar

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Plats

Shannon, Ireland

Tjänsteperiod

28 Months

Deadline

24.08.202611:00

25

Dagar

Galway City Council - Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.

Galway City Council

Inspection of ventilation system, Ventilation equipment, Ventilation ducting, Ventilation installation work, Parts of heat pumps, Heat pumps. Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.

WartungLüftungWärmepumpe

Plats

Galway, Irland

Tjänsteperiod

48 Monate

Maxvärde

500.000 €

Deadline

10.08.202610:00

11

Dagar

Air Handling Unit and Chiller Installation at Beaumont Hospital

Beaumont Hospital_403

Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.

Mechanical EngineeringHVAC InstallationChiller Installation

Plats

Dublin, Ireland

Tjänsteperiod

24 Months

Deadline

10.08.202610:00

11

Dagar

RFT for the Establishment of a Single Party Framework Agreement for Architectural Design Services, including Specialist Skills, for project values of less than €1m for ATU Donegal

Atlantic Technological University

Architectural Design Consultancy Services including Specialist Skills for minor works, maintenance, upgrades and refurbishment projects at its Donegal Campuses.

ArchitekturGebäudeplanungSanierung

Plats

Donegal, Irland

Tjänsteperiod

48 Monate

Maxvärde

350.000 €

Deadline

05.08.202610:00

6

Dagar

1 / 2

Relaterade Upphandlingar inom Byggverksamhet

Upptäck andra möjligheter inom samma bransch

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Deadline

26.08.2026

27

Dagar

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Deadline

25.08.2026

26

Dagar

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Deadline

28.08.2026

29

Dagar

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Deadline

28.08.2026

29

Dagar

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Carrick on Shannon, Irland

ArchitekturLandschaftsplanungStadtentwicklung

Deadline

07.09.2026

39

Dagar

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Deadline

21.08.2026

22

Dagar

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Deadline

23.08.2026

24

Dagar

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Deadline

17.08.2026

18

Dagar

Emergency Works (Co. Kildare Schools)

Ireland

Architectural servicesEmergency worksSchools

Deadline

23.08.2026

25

Dagar

Emergency Works (Co. Wicklow Schools)

Dublin, Irland

ArchitekturNotfallmaßnahmenSchulen

Deadline

23.08.2026

25

Dagar

St. Ciaran's Community School Kells

Kells, Irland

Elektrische InstallationNotbeleuchtungFeueralarm

Deadline

13.08.2026

14

Dagar

Fit-Out, Landscaping and Equipment Supply

Inis Meáin, Irland

KüchengeräteLieferungGastronomie

Deadline

21.08.2026

22

Dagar

Employers representative, technical advisory and assigned certifier services for the Project Barrow Social Housing Design and Build Contract

Dublin, Irland

ArchitekturBauberatungÜberwachung

Deadline

27.08.2026

28

Dagar

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Cape Clear, Ireland

RefurbishmentExtensionConstruction

Deadline

28.08.2026

29

Dagar

TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council

Cavan, Irland

WohnbauMehrfamilienhausBauarbeiten

Deadline

31.08.2026

32

Dagar