Hitta ditt perfekta kontrakt.
Sök upphandlingar via företag direkt
Leo Lynch
Byggverksamhet
Matchande Upphandlingar
DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B
●Dublin City Council
●Dublin City Council
Delivery of a significant programme of housing projects (social and affordable housing) utilising primarily the Design and Build (DB) delivery model. Includes building construction, multi-dwelling buildings, electrical installation, mechanical installations, and development of residential real estate.
Plats
Dublin, Ireland
Tjänsteperiod
48 Months
Maxvärde
1.750.000.000 €
Deadline
26.08.2026 • 10:00
27
Dagar
Connolly Dry Canteen DFTC Curragh Camp
●Irish Defence Forces_1144
●Irish Defence Forces_1144
Bauarbeiten am Connolly Dry Canteen, DFTC, Curragh, Co. Kildare. Bezugnahme auf die mechanischen und elektrischen Zeichnungen gemäß dieser Spezifikation. Hauptklassifikation: Bauarbeiten (CPV 45000000), Gebäudebau (45210000), Fenster, Türen und verwandte Artikel (44221000), Sanierungsarbeiten (45453100), Elektrische Installationen (45310000), Mechanische Installationen (45350000).
Plats
Kildare, Irland
Tjänsteperiod
6 Monate
Maxvärde
600.000 €
Deadline
11.08.2026 • 10:00
12
Dagar
Conference Room Plunkett Mess DFTC Curragh Camp
●Irish Defence Forces_1144
●Irish Defence Forces_1144
Bauarbeiten im Conference Room Plunkett Mess, DFTC Curragh Camp, Co. Kildare. Dazu gehören: 45210000 Baubauarbeiten, 44221000 Fenster, Türen und verwandte Artikel, 45442100 Malerarbeiten, 45453100 Sanierungsarbeiten, 45310000 Elektroinstallationen, 45350000 Mechanische Installationen.
Plats
Ireland
Tjänsteperiod
6 Months
Deadline
10.08.2026 • 10:00
11
Dagar
Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana
●Scoil Mhuire (Buncrana)
●Scoil Mhuire (Buncrana)
Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana. See cover letter for full description of works.
Plats
Buncrana, Irland
Tjänsteperiod
2 Monate
Deadline
31.07.2026 • 10:00
1
Dag
Air Handling Unit and Chiller Installation at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.
Plats
Dublin, Ireland
Tjänsteperiod
24 Months
Deadline
10.08.2026 • 10:00
11
Dagar
Relaterade Upphandlingar inom Byggverksamhet
Upptäck andra möjligheter inom samma bransch