Hitta ditt perfekta kontrakt.
Sök upphandlingar via företag direkt
Interior Elements
Byggverksamhet
Interior Elements är verksam inom Byggverksamhet.
Upphandlingar för Byggverksamhet
Branschbaserade träffar
Dessa upphandlingar matchas baserat på företagets bransch och land. Premiumanvändare kan göra anspråk på detta företag och lägga till de saknade uppgifterna för att hitta mer exakta träffar. See plan details
Schools Energy Pathfinder 2025 - Biomass Programme - Biomass Package - Bundle 6 (DDLETB)
●Dublin and Dun Laoghaire Education and Training Board
●Dublin and Dun Laoghaire Education and Training Board
Supply, deliver, install and commission containerised biomass cabins and associated plant and equipment at six school sites in County Dublin. Supply and deliver wood pellets, sell heat, and operate, maintain, repair and replace the equipment under a separate energy supply contract.
Plats
County Dublin, Ireland
Tjänsteperiod
15 years
Kontraktsvärde
5 450 000 €
Deadline
17.11.2026 • 12:00
31
Dagar
●Health Service Executive (HSE)
Provide assigned certifier services for renovation, refurbishment and fit-out of a light industrial unit to decant non-acute services from the University Hospital Galway campus.
Plats
Ireland
Tjänsteperiod
41 months
Kontraktsvärde
25 000 000 €
Deadline
11.11.2026 • 12:00
25
Dagar
Provision of Equipment Installation Support Works
●National Transport Authority_1149
●National Transport Authority_1149
Provide expert installation, operation and commissioning support for bus ticketing and related equipment, including power and communications cables and mounting poles. Commission buses and conduct acceptance tests, advise third-party providers, manage and implement proofs of concept, and quality-check third-party deliverables.
Plats
Ireland
Tjänsteperiod
60 months
Kontraktsvärde
3 650 000 €
Deadline
12.11.2026 • 12:00
26
Dagar
ET2607 - Provision of an Interactive and Connected Breathalyser Terminal Service
●Road Safety Authority (RSA)
●Road Safety Authority (RSA)
Provide an interactive, connected breathalyser terminal service for the Road Safety Authority, as detailed in the tender requirements.
Plats
Ireland
Tjänsteperiod
84 months
Kontraktsvärde
1 500 000 €
Deadline
04.12.2026 • 10:00
48
Dagar
N80 Leagh Bends Scheme Archaeological Consultancy Services Stages (i) to (iv)
●Carlow County Council
●Carlow County Council
Provide archaeological consultancy for the N80 Leagh Bends Scheme: test excavations and surveys; pre-excavation services; excavations and preliminary reporting; analysis, reporting, public dissemination and archiving; and, if instructed, archaeological monitoring during construction. Each stage requires written instruction by the contracting authority.
Plats
Carlow, Ireland
Tjänsteperiod
18 months
Kontraktsvärde
830 000 €
Deadline
20.11.2026 • 14:00
34
Dagar
●Good Shepherd Cork
Renovate and extend the existing convent into a domestic violence refuge with 20 accommodation units and associated services. Build two four-storey residential blocks with 32 apartments, parking, roads and ancillary services; submit options for phased delivery and refuge-only.
Plats
Cork, Ireland
Tjänsteperiod
30 months
Kontraktsvärde
22 000 000 €
Deadline
25.11.2026 • 17:00
39
Dagar
ICT Managed Services
●Bord na Móna PLC
●Bord na Móna PLC
Provide ICT managed services through a reliable, secure and compliant service model, combining on-site and remote support to operate the contracting entity’s information and technology environment.
Plats
Ireland
Tjänsteperiod
8 years
Kontraktsvärde
40 000 000 €
Deadline
19.11.2026 • 12:00
33
Dagar
Invitation to Tender for the Painting of Tower Section of Passenger Walkway
●Port of Cork Company
●Port of Cork Company
Remove flaking paint and repaint the entire tower section of the passenger walkway at Port of Cork Ferry Port.
Plats
Ringaskiddy, County Cork, Ireland
Tjänsteperiod
3 months
Deadline
20.11.2026 • 17:00
34
Dagar
Provide mechanical and electrical engineering consultancy for the CAT 1 electrical retrofit of life-saving systems throughout Scoil Ursula.
Plats
Sligo, Ireland
Tjänsteperiod
14 months
Deadline
10.11.2026 • 13:00
24
Dagar
●Cork City Council
Assess the feasibility of district heating in Cork City to meet heat demand and contribute to decarbonising Ireland’s energy sector.
Plats
Cork City, Ireland
Tjänsteperiod
12 months
Kontraktsvärde
250 000 €
Deadline
27.10.2026 • 12:00
10
Dagar
Relaterade Upphandlingar inom Byggverksamhet
Upptäck andra möjligheter inom samma bransch