Hitta ditt perfekta kontrakt.
Sök upphandlingar via företag direkt
Ganson Building and Civil Engineering Contractors Ltd/ GansonUK Ltd
Byggverksamhet
Matchande Upphandlingar
Construction of MUGA for Coolaney/Mullinabreena GAA Club at Achonry
●Coolaney/Mullinabreena GAA club
●Coolaney/Mullinabreena GAA club
Turnkey delivery encompassing all aspects of site preparation, civil works, specialist sports surfacing, perimeter infrastructure, and related ancillary installations. The successful contractor will act as the Project Supervisor Construction Stage (PSCS) and will be responsible for delivering the project in full compliance with current building regulations, health and safety legislation, and relevant sports governing body standards. The scope includes: Site Preparation (Excavation, topsoil removal, earthworks, and sub-grade preparation), Installation of a comprehensive sub-base drainage network, Supply and compaction of standard geotextile membranes and graded stone aggregate layers, Supply and installation of a high-durability, all-weather synthetic sports surface (e.g., 3G synthetic turf or polymeric surfacing) complete with multi-sport line markings, Installation of a heavy-duty, rebound-style twin-wire mesh perimeter fence (typically 3m–4m high) including integrated access/maintenance gates and upper-level ball-stop netting, Provision of a perimeter concrete kerb, concrete access pathways, and floodlighting.
Plats
Achonry, Tubbercurry, Co Sligo, Ireland
Tjänsteperiod
6 Months
Maxvärde
220.000 €
Deadline
04.09.2026 • 15:00
24
Dagar
Contractor for Heating Services Upgrade and Gas Conversion Emergency Works Project 2026 at Scariff Community College, Drewsborough, Scariff, Co. Clare
●Limerick and Clare Education and Training Board
●Limerick and Clare Education and Training Board
Contractor for Heating Services Upgrade and Gas Conversion Emergency Works Project 2026 at Scariff Community College, Drewsborough, Scariff, Co. Clare
Plats
Scariff, Co. Clare, Ireland
Tjänsteperiod
12 Months
Maxvärde
560.000 €
Deadline
21.08.2026 • 10:00
9
Dagar
The Provision of Training Services for Local Enterprise Office Longford
●Longford County Council
●Longford County Council
Lieferung von Schulungsprogrammen, Workshops, Seminaren, Mentoring und Business-Entwicklungsunterstützung für kleine Unternehmen und Unternehmer, einschließlich Start-up-Unterstützung, Unternehmenswachstum, Managemententwicklung, Digitalisierung, Nachhaltigkeit, Vertrieb und Marketing, Finanzmanagement, Innovation und andere relevante Themen.
Plats
Longford, Irland
Tjänsteperiod
24 Monate (01.01.2027–31.12.2028)
Maxvärde
210.000 €
Deadline
02.10.2026 • 10:00
51
Dagar
9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.
Plats
Dublin, Ireland
Tjänsteperiod
5 Years
Maxvärde
200.000.000 €
Deadline
25.08.2026 • 10:00
13
Dagar
Piltown Town Centre Regeneration, Co. Kilkenny
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.
Plats
Kilkenny, Ireland
Tjänsteperiod
12 Months
Deadline
01.09.2026 • 10:00
20
Dagar
Assigned Certifier Services for the Department of Education and Youth Lot 09 Design and Build projects
●Department of Education and Youth
●Department of Education and Youth
Zertifizierungsdienstleistungen für das Ministerium für Bildung und Jugend für Projekte im Rahmen des Design-and-Build-Schulen-Mehrpartei-Auftragsrahmens Nummer 1 2020-2021 gemäß den Vorschriften zur Baugenehmigung (Änderung).
Plats
Dublin, Irland
Tjänsteperiod
24 Monate
Deadline
20.08.2026 • 10:00
8
Dagar
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Plats
Shannon, Ireland
Tjänsteperiod
28 Months
Deadline
24.08.2026 • 11:00
12
Dagar
Relaterade Upphandlingar inom Byggverksamhet
Upptäck andra möjligheter inom samma bransch