Hitta ditt perfekta kontrakt.

Sök upphandlingar via företag direkt

Expertsökning
FR

Frequency

Transport

Frequency är verksam inom Transport.

Upphandlingar för Transport

Branschbaserade träffar

Dessa upphandlingar matchas baserat på företagets bransch och land. Premiumanvändare kan göra anspråk på detta företag och lägga till de saknade uppgifterna för att hitta mer exakta träffar. See plan details

●Department of Housing Local Government and Heritage

Provide professional airlifting services to transport materials at Connemara National Park, Wild Nephin National Park and Burren National Park under a single-party framework agreement.

Plats

Connemara National Park, Wild Nephin National Park and Burren National Park, Ireland

Tjänsteperiod

48 months

Kontraktsvärde

1 500 000 €

Deadline

10.11.2026 • 17:00

3

Dagar

●Trinity College Dublin the University of Dublin_336

Provide logistics and transport services for Trinity College Dublin through a multi-party framework agreement. Up to eight contractors may be appointed.

Plats

Dublin, Ireland

Tjänsteperiod

48 months

Kontraktsvärde

3 000 000 €

Deadline

12.11.2026 • 13:00

5

Dagar

TII533 Enforcement Service Provider

●Transport Infrastructure Ireland (TII)

TII are seeking to procure an Enforcement Service Provider (the "ESP") to provide a range of services relating to the recovery of unpaid tolls, fines and fees charged for the use of tolled facilities within Ireland. The main service performance requirements are expected to be, but are not limited to, the following: • Establishing and implementing accurate and reconcilable business processes to accredited quality management standards; • Have available and reliable service provision delivered to specified performance levels; • Have secure business processes including having all systems and communications protected against internal and external security threats, fraud and cybercrime; • Have integrated systems with eFlow Operator to enable 2-way interface on all customer transactions; • Comprehensive and flexible reporting procedures; and • Compliance with all relevant legislation (e.g. including Data Protection/GDPR) and relevant standards (e.g. PCI-DSS, relevant ISO Standards)

Toll-collectionEnforcementLegal Services

Plats

Dublin, Ireland

Tjänsteperiod

132 Months

Kontraktsvärde

40 000 000 €

Deadline

09.11.2026 • 12:00

2

Dagar

Purchase of a new Welfare Van

●Department of Housing Local Government and Heritage

The National Parks and Wildlife Service at Glenveagh National Park have a requirement for a Welfare Van a specialized commercial vehicle equipped to transport a small team typically up to 7 people while providing self contained rest and sanitation facilities on mobile or remote work sites

Welfare VanCommercial VehicleRest Facilities

Plats

Wexford, Ireland

Tjänsteperiod

3 Months

Kontraktsvärde

95 000 €

Deadline

11.11.2026 • 12:00

4

Dagar

Second Hand 12 ton Tipper Lorry

●Department of Housing Local Government and Heritage

The department has a requirement for a second-hand 12 ton lorry.

Tipper trucksSecond HandSupplies

Plats

Wexford, Ireland

Tjänsteperiod

3 Months

Kontraktsvärde

60 000 €

Deadline

10.11.2026 • 12:00

3

Dagar

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioning

Plats

Dublin, Ireland

Tjänsteperiod

not less than 5 years

Deadline

29.08.2027 • 15:00

295

Dagar

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC works

Plats

Ireland

Tjänsteperiod

2026-07-28 - 2036-07-27

Deadline

25.07.2036 • 12:00

3548

Dagar

Anschaffung von emissionsarmen Coaches und Schulbussen sowie, wo möglich, emissionsfreien Coaches mit geringem Umweltausdruck im Einklang mit der neuesten EURO VI-Verordnung. Die Fahrzeuge müssen die Leitlinien der EPA für Straßenverkehrsfahrzeuge und die europäischen Gemeinschaftsbestimmungen über saubere und energieeffiziente Straßenverkehrsfahrzeuge einhalten.

BusCoachEmissionsarm

Plats

Dublin, Irland

Tjänsteperiod

60 Monate

Kontraktsvärde

720 000 000 €

Deadline

31.03.2033 • 12:00

2336

Dagar

●Donegal Education and Training Board_368

Dynamic Purchasing System (DPS) for Course Consumables for use in Training Centres and Schools

SteelPipingSupplies

Plats

Ireland

Tjänsteperiod

2026-06-26 - 2031-06-26

Kontraktsvärde

10 000 000 €

Deadline

26.06.2031 • 14:00

1692

Dagar

●Iarnród Eireann-Irish Rail

Provision of strategic/expert advisory services, professional services secondments, project management deliverables, planning advice, alternative design options, and other consultancy services across multiple fields including architectural, engineering, environmental, financial, HR, and safety consultancy.

ArchitekturIngenieurwesenBeratung

Plats

Irland

Tjänsteperiod

2026-03-02 - 2031-03-03

Deadline

01.03.2031 • 12:00

1575

Dagar