Hitta ditt perfekta kontrakt.

Sök upphandlingar via företag direkt

Expertsökning
EM

EMCO

Byggverksamhet

Clane, Kildare, Irland
insulated panelsdoorsfirewalls

Matchande Upphandlingar

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

St. Mary’s Primary School (Dungarvan)

Remedial works to the external building facade to resolve water ingress issues and to restore the integrity of the external facade against further water ingress. Works include external wall treatments, remedial detailing, works to roof overhangs, fascias and soffits, associated internal remedial and repair works. Additionally, installation of attic insulation and pumped cavity wall insulation, and supply and installation of a bike rack.

BauarbeitenSanierungDämmung

Plats

Dungarvan, Ireland

Tjänsteperiod

2 Months

Deadline

12.08.202613:00

13

Dagar

Fit-Out, Landscaping and Equipment Supply

Seán Ó Domhnaill

Supply and delivery of commercial large kitchen appliances for a new café development. Installation excluded.

KüchengeräteLieferungGastronomie

Plats

Inis Meáin, Irland

Tjänsteperiod

12 Months

Deadline

21.08.202610:00

22

Dagar

Alterations of an existing building to form new handball alley with associated development works at Lavey GAA grounds

Lavey GAA

Umbau eines bestehenden Gebäudes zu einer modernen Handballbahn und Innenbereich für Spiele, zusammen mit einem Gemeinschaftsbereich zur Unterstützung von Sport, Freizeit, Gesundheit und Wohlbefinden. Dazu gehören die Entwicklung von Gemeinschaftsflächen und zugehörige Bauarbeiten.

HandballbahnUmbauBauarbeiten

Plats

Cavan, Irland

Tjänsteperiod

3 Monate

Maxvärde

250.000 €

Deadline

12.08.202610:00

13

Dagar

Connolly Dry Canteen DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten am Connolly Dry Canteen, DFTC, Curragh, Co. Kildare. Bezugnahme auf die mechanischen und elektrischen Zeichnungen gemäß dieser Spezifikation. Hauptklassifikation: Bauarbeiten (CPV 45000000), Gebäudebau (45210000), Fenster, Türen und verwandte Artikel (44221000), Sanierungsarbeiten (45453100), Elektrische Installationen (45310000), Mechanische Installationen (45350000).

BauarbeitenSanierungElektrische Installationen

Plats

Kildare, Irland

Tjänsteperiod

6 Monate

Maxvärde

600.000 €

Deadline

11.08.202610:00

12

Dagar

Conference Room Plunkett Mess DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten im Conference Room Plunkett Mess, DFTC Curragh Camp, Co. Kildare. Dazu gehören: 45210000 Baubauarbeiten, 44221000 Fenster, Türen und verwandte Artikel, 45442100 Malerarbeiten, 45453100 Sanierungsarbeiten, 45310000 Elektroinstallationen, 45350000 Mechanische Installationen.

BauarbeitenSanierungElektroinstallation

Plats

Ireland

Tjänsteperiod

6 Months

Deadline

10.08.202610:00

11

Dagar

Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana

Scoil Mhuire (Buncrana)

Refurbishment of Science Classrooms and Preparation Room, Including Works to an Existing Classroom to Accommodate the New Science Classroom on the 2nd Floor at Scoil Mhuire, Buncrana. See cover letter for full description of works.

SchulbauSanierungWasserinstallation

Plats

Buncrana, Irland

Tjänsteperiod

2 Monate

Deadline

31.07.202610:00

1

Dag

Internal alterations, cabin lift, landing, internal fire doors, glazed screen, mechanical and electrical at Ballyconnell Community Centre, Ballyconnell, Co.Cavan Eircode H14 AY24

Ballyconnell Community Centre

Internal alterations, form new youth hub on first floor, cabin lift, landing, internal fire doors, glazed screen, sliding partition wall, floor finishes, fire alarm upgrade, mechanical and electrical installation at Ballyconnell Community Centre

RefurbishmentBauarbeitenMechanical

Plats

Ballyconnell, Irland

Tjänsteperiod

2 Months

Deadline

05.08.202615:30

6

Dagar

Integrated Maintenance Services Framework for the LDA Residential Portfolio

The Land Development Agency

Integrated maintenance service, including Planned Preventative Maintenance (PPM), Reactive Maintenance, Emergency Works, Mechanical and Electrical Maintenance, Minor Building Works, statutory compliance activities and associated maintenance services required to support occupied residential developments and common areas.

MaintenanceBuilding InstallationsResidential Portfolio

Plats

Dublin, Ireland

Tjänsteperiod

48 Months

Maxvärde

30.000.000 €

Deadline

10.08.202610:00

11

Dagar

Air Handling Unit and Chiller Installation at Beaumont Hospital

Beaumont Hospital_403

Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.

Mechanical EngineeringHVAC InstallationChiller Installation

Plats

Dublin, Ireland

Tjänsteperiod

24 Months

Deadline

10.08.202610:00

11

Dagar

Refurbishment of Cottage No.16 (Mulligan’s Cottage) in Killarney National Park

Department of Housing Local Government and Heritage

Full architectural/mechanical/electrical refurbishment of Cottage No.16 at Muckross, on the N71, Killarney Kenmare route. Competent building contractors with experience in restoration of old buildings of historical and architectural merit are invited.

RefurbishmentBuilding ConstructionRestoration

Plats

Killarney, Irland

Tjänsteperiod

12 Months

Deadline

12.08.202610:00

13

Dagar