Hitta ditt perfekta kontrakt.
Sök upphandlingar via företag direkt
Ecospec är verksam inom Byggverksamhet. Plats: Dublin, Leinster.
Produkter och tjänster
- Värmeisoleringsarbeten
- Installation av värme, ventilation och luftkonditionering
- VA- och dräneringsarbeten
- Gasinstallationer
- Montering av räcken
- Ornamentering
- Utvändig rengöring av byggnader
- Reparation och renovering
- Byggnadsteknik
- Tekniska konstruktionstjänster för maskintekniska och elektriska installationer i byggnader
Matchande Upphandlingar
●John Larkin
Restore a derelict vernacular cottage and adjoining outhouse as self-catering accommodation with four bedrooms, one bathroom and a living room/kitchen. Install wastewater treatment, storm and foul pipework, connect services and complete basic landscaping.
Plats
Castlerea, County Roscommon, Ireland
Tjänsteperiod
12 months
Deadline
27.10.2026 • 12:00
11
Dagar
Provide an architect-led multidisciplinary team for pyrite remediation and other building and surrounding-area works at Darndale Regional Youth Facility. Lead preliminary design through handover, including certification, employer representation, health and safety coordination, engineering, fire safety and quantity surveying. Design and coordinate temporary decant accommodation required to maintain youth services during construction.
Plats
Dublin 17, Ireland
Tjänsteperiod
42 months
Kontraktsvärde
300 000 €
Deadline
20.10.2026 • 12:00
4
Dagar
Procurement for an Integrated Design Team to deliver a 5 bedroom Community Dwelling at Milepost, Slieverue, Co Kilkenny
●Belmont Park Housing Association
●Belmont Park Housing Association
Provide an integrated design team for a five-bedroom community bungalow on a greenfield site in Milepost, Slieverue. Deliver full services from stage (ii) Design through stage (v) Handover, progressing the project through construction.
Plats
Kilkenny, Ireland
Tjänsteperiod
34 months
Kontraktsvärde
90 000 €
Deadline
13.11.2026 • 12:00
28
Dagar
●Fingal County Council_371
Design and build 21 units, including associated site works at Fortlawn Estate, Blanchardstown, Dublin 15.
Plats
Blanchardstown, Dublin, Ireland
Tjänsteperiod
32 months
Kontraktsvärde
7 500 000 €
Deadline
10.11.2026 • 12:00
25
Dagar
●Office of Public Works (OPW)
Provide works contractor services, including the role of PSCS, for conservation and adaptation of 14–17 Moore Street and construction of a new visitor facility at 8–9 Moore Lane, Dublin 1.
Plats
Dublin, Ireland
Tjänsteperiod
14 months
Kontraktsvärde
14 400 000 €
Deadline
12.11.2026 • 12:00
27
Dagar
●Health Service Executive (HSE)
Provide building services (mechanical and electrical) consultancy for decentralizing the campus central heating system at University Hospital Galway, through the existing Zone B Enabling Works Framework.
Plats
Galway, Ireland
Tjänsteperiod
42 months
Kontraktsvärde
160 000 €
Deadline
02.11.2026 • 12:00
17
Dagar
●Health Service Executive (HSE)
Provide civil and structural engineering consultancy for decentralizing the campus central heating system at University Hospital Galway, under the existing Zone B Enabling Works Framework.
Plats
University Hospital Galway, Galway, Ireland
Tjänsteperiod
42 months
Kontraktsvärde
160 000 €
Deadline
02.11.2026 • 12:00
17
Dagar
●Health Service Executive (HSE)
MULTI-PARTY FRAMEWORK AGREEMENT FOR HSE DESIGN TEAM SERVICES FRAMEWORK 2024 – FRAMEWORK 02: ACUTE HEALTHCARE CAPITAL WORKS – PROJECT VALUE €1M -€15M EXCL. VAT. This framework will include the following design team disciplines (Lots): Lot 1: Architect(AR) as Principal Service Provider with the following Specialists domestic sub-consultants, or in-house specialisms: a. Planner (PL), b. Project Supervisor Design Process (PSDP), c. Fire Safety Consultant (FSC) and d. BIM Information Manager(BIM). The Health Services Executive (HSE) invites expressions of interest, under the Restricted Procedure, from suitably qualified services providers for the provision of design team services (including Specialist Skills Providers) per the above Lot listing for which it is proposed to establish a Multi-Party Framework Agreement for each Lot type to award call-off contracts for Acute Healthcare Capital Works – project value €1M-€15M excl. VAT within HSE North West Area Please note that the INITIAL project forming Framework 02 for this regional / sub¬regional office NW West Area will be: Proposed Microbiology Lab incorporating ancillary site works, plus enabling work to divert existing services at Sligo University Hospital.
Plats
Sligo, Ireland
Tjänsteperiod
48 Months
Kontraktsvärde
4 200 000 000 €
Deadline
30.10.2026 • 12:00
14
Dagar
●Dublin City Council
The Contracting Authority, Dublin City Council, intends to establish a Single Party Framework Agreement with a Integrated Design Team to deliver planning, engineering, environmental, stakeholder engagement and other specialist consultancy services for the Clontarf Flood Defence and Public Realm Project (CFDPRP). The Project is located along the Clontarf waterfront in Dublin and encompasses a highly sensitive coastal environment adjoining designated European sites, including Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The Project has been initiated to address existing and future coastal and surface water flood risks while delivering a coordinated programme of public realm enhancement, active travel improvements and environmental benefits. The scheme shall be developed through an integrated design approach that balances flood resilience, climate adaptation, biodiversity, heritage, placemaking, sustainable mobility, environmental protection and stakeholder aspirations. The initial call-off contract under the Framework will require the successful Applicant to undertake all services necessary to develop the Project from commencement through option identification, scheme development, environmental assessment, statutory consent processes and detailed design. This shall include the preparation of all technical studies, surveys, modelling, assessments, reports, designs and application documentation required to secure the necessary approvals and to progress the Project to a stage suitable for procurement and construction. The Framework Agreement may subsequently be utilised by the Contracting Authority to procure additional related services, including procurement support, construction-stage services, post-consent services and other specialist consultancy services associated with the delivery of the Project. The successful Applicant shall be required to develop a fully integrated and coordinated scheme that delivers flood protection, surface water management, active travel and public realm objectives within a single coherent design solution that is environmentally sensitive, climate resilient and appropriate to the strategic importance of the Clontarf waterfront.
Plats
Dublin, Ireland
Tjänsteperiod
7 Years
Kontraktsvärde
7 500 000 €
Deadline
30.10.2026 • 12:00
14
Dagar
9843 Design and Build Capacity Enhancement Works at Connolly Station
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.
Plats
Dublin, Ireland
Tjänsteperiod
42 Months
Kontraktsvärde
34 000 000 €
Deadline
20.11.2026 • 12:00
35
Dagar
Relaterade Upphandlingar inom Byggverksamhet
Upptäck andra möjligheter inom samma bransch