Hitta ditt perfekta kontrakt.

Sök upphandlingar via företag direkt

Expertsökning
BA

Bawn Developments Ltd

Byggverksamhet

Bawn Developments Ltd är verksam inom Byggverksamhet.

Upphandlingar för Byggverksamhet

Branschbaserade träffar

Dessa upphandlingar matchas baserat på företagets bransch och land. Användare med ett aktivt FREE-konto kan göra anspråk på detta företag och lägga till de saknade uppgifterna för att hitta mer exakta träffar. Se abonnemangsdetaljer

●Port of Cork Company

Extend the existing deep-water berth, surface land behind the quay and dredge the seabed to -13.4m Chart Datum. Provide lighting, drainage and associated civil, mechanical and electrical works; the authority may adjust the approximate scope.

Plats

Ringaskiddy, County Cork, Ireland

Tjänsteperiod

24 months

Deadline

27.11.2026 • 17:00

9

Dagar

●GREYSTEEL COMMUNITY ENTERPRISES LTD

Deliver a sports dome with a 3G playing surface and associated works in Greysteel. Refurbish an existing building in Creeslough, County Donegal, to provide community facilities.

Plats

Greysteel, County Derry, Ireland; Creeslough, County Donegal, Ireland

Tjänsteperiod

2026-12-15 - 2029-06-30

Kontraktsvärde

275 000 GBP

Deadline

20.11.2026 • 12:00

2

Dagar

Undertake comprehensive valuations of ASI’s 14 properties across Ireland, including rebuilding and reinstatement costs for insurance. Provide valuation advice for financial reporting, identify impairment indicators, and establish a consistent portfolio valuation framework.

Plats

Republic of Ireland

Tjänsteperiod

5 years

Kontraktsvärde

35 000 €

Deadline

25.11.2026 • 12:00

7

Dagar

●An Post_391

Supply, installation and commissioning of solar photovoltaic systems at An Post properties throughout the Republic of Ireland, with maintenance during the applicable warranty period. The system may also be used for later call-offs for support, maintenance and/or ongoing enhancements, without guaranteed volume.

Solar PV systemssolar panelsinstallation

Plats

Republic of Ireland

Tjänsteperiod

2026-11-04 -; 10 years; An Post reserves the right to extend or close the panel early in line with Operational Requirements; maintenance during the applicable warranty period

Deadline

30.11.2031 • 23:59

1838

Dagar

●Iarnród Eireann-Irish Rail

Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.

ConstructionRailway StationDesign and Build

Plats

Dublin, Ireland

Tjänsteperiod

42 Months

Kontraktsvärde

34 000 000 €

Deadline

20.11.2026 • 12:00

2

Dagar

Garden Design for Knockreer Gardens Killarney National Park

●Department of Housing Local Government and Heritage

Tenders are being sought for the preparation of a Conservation Design and Development Plan (CDDP) focused on the long-term practice of conservation horticulture at Knockreer House Gardens. The CDDP will be guided by best international practice in conservation design and interpretation.

landscape architectureconservation designhorticulture

Plats

Wexford, Ireland

Tjänsteperiod

12 Months

Kontraktsvärde

70 000 €

Deadline

27.01.2027 • 15:00

70

Dagar

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioning

Plats

Dublin, Ireland

Tjänsteperiod

not less than 5 years

Deadline

29.08.2027 • 15:00

284

Dagar

Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.

LNGProcurementContract Management

Plats

Ireland

Tjänsteperiod

180 Days

Deadline

05.05.2036 • 12:00

3456

Dagar

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC works

Plats

Ireland

Tjänsteperiod

2026-07-28 - 2036-07-27

Deadline

25.07.2036 • 12:00

3537

Dagar

9884 Qualification System for Surveys

●Iarnród Eireann-Irish Rail

Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.

Intrusive SurveysEisenbahninfrastrukturBodenuntersuchung

Plats

Irland

Tjänsteperiod

7 Jahre

Deadline

21.08.2033 • 12:00

2468

Dagar

Relaterade Upphandlingar inom Byggverksamhet

Upptäck andra möjligheter inom samma bransch

The Design and Build of 30 No. Apartment units including all necessary site development works at Mary Street, Limerick City.

Limerick City, Ireland

30 apartmentsMary Streetsite development

Deadline

14.12.2026

26

Dagar

Gas Boiler heating system

County Mayo, Ireland

Deadline

17.12.2026

29

Dagar

Climate Action and Windows Project at St Joseph’s College, Lucan, Co. Dublin

Lucan, County Dublin, Ireland

Deadline

04.12.2026

16

Dagar

Ground Penetrating Radar Survey at Abbey Bridge

Limerick, Ireland

Ground Penetrating RadarAbbey Bridgeduct layout

Deadline

04.12.2026

16

Dagar

Dynamic Purchasing System for Road Markings

Republic of Ireland

road markingsroad maintenancethermoplastic materials

Deadline

26.02.2032

1925

Dagar

Shandon Exchange Project

Cork, Ireland

Deadline

17.12.2026

29

Dagar

Raheen Group Water Scheme Watermain Replacement

Raheen, Tuamgraney, Ireland

Deadline

29.01.2027

72

Dagar