Najdite svojo popolno pogodbo.

Iščite razpise prek podjetij takoj

MO

MODULE

Gradbeništvo

MODULE deluje v panogi Gradbeništvo.

Razpisi za Gradbeništvo

Ujemanja po panogi

Ti razpisi so usklajeni na podlagi panoge in države podjetja. Uporabniki Premium lahko prevzamejo to podjetje in dodajo manjkajoče podatke za natančnejše zadetke. See plan details

●CEIST (Catholic Education an Irish Schools Trust

Demolish the vacated 3,257 m² single-storey school buildings, including ancillary structures, footings and hardstanding. Remove trees and disused drainage and utility systems, including underground attenuation tanks, clearing the site ahead of construction of a new multi-storey school.

Lokacija

Limerick, Ireland

Obdobje Storitve

4 months

Vrednost naročila

1.000.000 €

Rok

06.11.2026 • 15:00

3

Dni

●Kildare County Council_385

Deliver Package 1 of the Grand Canal Greenway Phase 2: widen and resurface a 7 km trail between Lock 20 and Shee Bridge Boardwalk, and construct the ST02 pedestrian bridge at Lock 18. Improve public and private road junctions, underbridge crossings and the Ticknevin road junction, with associated ancillary works.

Grand Canal Greenwaytrail wideningtrail resurfacing

Lokacija

Kildare, Ireland

Obdobje Storitve

12 months

Vrednost naročila

5.500.000 €

Rok

12.11.2026 • 13:00

9

Dni

Develop and construct a veterinary teaching hospital at ATU’s Knocknamona campus, including small-animal, large-animal and equine facilities, pathology, animal accommodation, external yards and associated infrastructure. Deliver the development in phases, with the initial hospital able to operate independently as a clinical facility.

Lokacija

Letterkenny, County Donegal, Ireland

Obdobje Storitve

22 months

Vrednost naročila

25.000.000 €

Rok

09.11.2026 • 12:00

6

Dni

Doctor Mc Garry Housing Milltown Phase 2

●Milltown Housing Association Ltd

Construct a single-storey, one-bedroom dwelling and create an apartment within part of the existing community centre. Include all ancillary site development works.

Lokacija

Milltown, County Galway, Ireland

Obdobje Storitve

15 months

Vrednost naročila

700.000 €

Rok

06.11.2026 • 16:00

3

Dni

●An Post_391

Supply, installation and commissioning of solar photovoltaic systems at An Post properties throughout the Republic of Ireland, with maintenance during the applicable warranty period. The system may also be used for later call-offs for support, maintenance and/or ongoing enhancements, without guaranteed volume.

Solar PV systemssolar panelsinstallation

Lokacija

Republic of Ireland

Obdobje Storitve

04. 11. 2026 -; 10 years; An Post reserves the right to extend or close the panel early in line with Operational Requirements; maintenance during the applicable warranty period

Rok

30.11.2031 • 23:59

1853

Dni

●Office of the Revenue Commissioners_366

Provide a maritime data analysis system that captures, collects, stores, searches, queries, visualises and updates maritime big data; analyses maritime risks and identifies or categorises high-risk threats; and produces risk alerts or profiles, periodic strategic overviews and maritime area analyses for border, coast guard and law enforcement authorities.

Maritime data analysis systemmaritime big datamaritime risk analysis

Lokacija

Ireland

Obdobje Storitve

84 months

Vrednost naročila

1.800.000 €

Rok

06.11.2026 • 12:00

3

Dni

Supply and fit a new gas central heating system at Scoil Úna Naofa Primary School, including mechanical and engineering works. The existing 30-year-old system is at end of life; works are to be completed in the school basement.

gas central heatingmechanical servicesengineering services

Lokacija

Crumlin, Dublin 12, Ireland

Obdobje Storitve

9 months

Vrednost naročila

365.000 €

Rok

06.11.2026 • 17:00

3

Dni

Electrical infrastructure upgrade works at St James's Hospital under a framework agreement, including electrical installation, engineering and maintenance-related works.

Electrical infrastructureUpgrade worksFramework agreement

Lokacija

Dublin, Ireland

Obdobje Storitve

4 years

Vrednost naročila

6.000.000 €

Rok

05.11.2026 • 13:00

2

Dni

High Throughput Transient Antibody Production and Characterisation Services

●National Institute for Bioprocessing Research and Training (NIBRT)

Provide high-throughput transient antibody production and characterisation services for an active discovery programme. Research-use only; GMP manufacture is not required. Demonstrate data integrity practices aligned with 21 CFR Part 11 principles where reasonably achievable.

antibody productionantibody characterisationhigh-throughput services

Lokacija

Ireland

Obdobje Storitve

36 months

Vrednost naročila

375.000 €

Rok

04.11.2026 • 12:00

1

Dan

Appointment of a main contractor to construct two two-bay fire stations, including office, training and welfare facilities, at Baltinglass and Dunlavin, County Wicklow.

fire stationsconstructionmain contractor

Lokacija

Baltinglass and Dunlavin, County Wicklow, Ireland

Obdobje Storitve

18 months

Vrednost naročila

6.500.000 €

Rok

12.11.2026 • 12:00

9

Dni

Povezani Razpisi v Gradbeništvo

Odkrijte druge priložnosti v isti panogi

Upgrade Works to Wicklow Town Swimming Facility

Wicklow Town, Ireland

Rok

14.12.2026

41

Dni

Newbridge Southern Ring Road and Bridge for Kildare County Council

Newbridge, County Kildare, Ireland

Southern Ring Roadfive-span bridgeRiver Liffey

Rok

30.11.2026

27

Dni

Lighting and Road Upgrades Works, IDA Business Park, Finisklin Co. Sligo

Finisklin, County Sligo, Ireland

Rok

01.12.2026

28

Dni

10066 - CME Exhaust Ventilation

Ireland

Rok

25.11.2026

22

Dni

Cherry Orchard Hospital - Blackthorn unit, Community Day Care Refurbishment

Dublin, Ireland

refurbishmentcommunity day caremechanical and electrical services

Rok

13.11.2026

10

Dni

TII499 Luas Finglas Main Infrastructure Design and Construction Works

Dublin, Ireland

Luas Finglaslight railtrack

Rok

14.12.2026

41

Dni