Najdite svojo popolno pogodbo.
Iščite razpise prek podjetij takoj
McElroy Associates
Gradbeništvo
Ujemajoči razpisi
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.
Lokacija
Dublin, Ireland
Obdobje Storitve
84 Months
Maksimalna Vrednost
1.200.000 €
Rok
24.08.2026 • 10:00
25
Dni
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Lokacija
Ireland
Obdobje Storitve
39 Months
Maksimalna Vrednost
300.000 €
Rok
25.08.2026 • 14:00
26
Dni
Piltown Town Centre Regeneration, Co. Kilkenny
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.
Lokacija
Kilkenny, Ireland
Obdobje Storitve
12 Months
Rok
01.09.2026 • 10:00
33
Dni
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.
Lokacija
Dublin, Ireland
Obdobje Storitve
7 Months
Maksimalna Vrednost
1.200.000 €
Rok
17.08.2026 • 10:00
18
Dni
Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service
●Roscommon County Council_424
●Roscommon County Council_424
Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon
Lokacija
Roscommon, Ireland
Obdobje Storitve
3 Years
Rok
07.08.2026 • 14:00
8
Dni
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Lokacija
Ireland
Obdobje Storitve
60 Months
Maksimalna Vrednost
2.000.000 €
Rok
14.08.2026 • 14:00
15
Dni
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Lokacija
Shannon, Ireland
Obdobje Storitve
28 Months
Rok
24.08.2026 • 11:00
25
Dni
Galway City Council - Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.
●Galway City Council
●Galway City Council
Inspection of ventilation system, Ventilation equipment, Ventilation ducting, Ventilation installation work, Parts of heat pumps, Heat pumps. Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.
Lokacija
Galway, Irland
Obdobje Storitve
48 Monate
Maksimalna Vrednost
500.000 €
Rok
10.08.2026 • 10:00
11
Dni
Air Handling Unit and Chiller Installation at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.
Lokacija
Dublin, Ireland
Obdobje Storitve
24 Months
Rok
10.08.2026 • 10:00
11
Dni
RFT for the Establishment of a Single Party Framework Agreement for Architectural Design Services, including Specialist Skills, for project values of less than €1m for ATU Donegal
●Atlantic Technological University
●Atlantic Technological University
Architectural Design Consultancy Services including Specialist Skills for minor works, maintenance, upgrades and refurbishment projects at its Donegal Campuses.
Lokacija
Donegal, Irland
Obdobje Storitve
48 Monate
Maksimalna Vrednost
350.000 €
Rok
05.08.2026 • 10:00
6
Dni
Povezani Razpisi v Gradbeništvo
Odkrijte druge priložnosti v isti panogi