Poiščite popolno javno naročilo zase.

Poiščite podjetja ali javna naročila.

BA

Bawn Developments Ltd

Gradbeništvo

Bawn Developments Ltd deluje v panogi Gradbeništvo.

Razpisi za Gradbeništvo

Ujemanja po panogi

Ti razpisi so usklajeni na podlagi panoge in države podjetja. Uporabniki z aktivnim računom FREE lahko prevzamejo to podjetje in dodajo manjkajoče podatke za natančnejše zadetke. Oglejte si podrobnosti paketov

●Kilkenny County Council_1185

Provide a multidisciplinary team to deliver preliminary and detailed design, statutory planning, enabling and procurement, construction and handover for the Vibrant Streets East scheme. The scope includes the PSDP role and procurement of specialist services.

preliminary designdetailed designstatutory planningPSDPconstruction supervision

Lokacija

Kilkenny, Ireland

Obdobje Storitve

44 months

Vrednost naročila

250.000 €

Rok

10.12.2026 • 12:00

15

Dni

CASWS at Enniscorthy Community College

●Waterford and Wexford Education and Training Board_110494

Provide consultancy services for SWS at Enniscorthy Community College in County Wexford.

Lokacija

County Wexford, Ireland

Obdobje Storitve

18 months

Vrednost naročila

80.000 €

Rok

27.11.2026 • 16:00

2

Dni

●Donegal County Council_1193

Review the tidal access restriction on the approach to Machaire Rabhartaigh Harbour and assess whether it can be removed without adverse effects on coastal morphology, to create a channel 3–4 m deep below Chart Datum. The consultant must have environmental and marine engineering expertise and a strong coastal morphology background.

Lokacija

Donegal, Ireland

Obdobje Storitve

9 months

Rok

11.12.2026 • 18:00

16

Dni

Tender re Multi Party Framework for Art Class Materials/Consumable for WWETB

●Waterford and Wexford Education and Training Board_110494

Supply general art-class materials and consumables to WWETB under a multi-supplier framework. Up to four suppliers may be appointed.

Lokacija

Waterford and Wexford, Ireland

Obdobje Storitve

48 months

Vrednost naročila

1.500.000 €

Rok

09.12.2026 • 13:00

14

Dni

10105 - FUEL TANK INSPECTIONS

●Iarnród Eireann-Irish Rail

Inspect and assess four operational bulk diesel storage tanks at Irish Rail’s Inchicore Works and Alexandra Road Depot facilities. Clean, refurbish and recommission the tanks.

Lokacija

Dublin, Ireland

Obdobje Storitve

60 months

Vrednost naročila

200.000 €

Rok

04.12.2026 • 12:00

9

Dni

Provide workplace substance misuse assessment services for An Garda Síochána.

Lokacija

Ireland

Obdobje Storitve

60 months

Vrednost naročila

1.500.000 €

Rok

09.12.2026 • 15:00

14

Dni

Bealach Seanadh Mhach- Phase 2

●Údarás Na Gaeltachta_289

Construct Phase 2 of the Bealach Seanadh Mhach Trails Project, including approximately 325 m of recycled-plastic boardwalk, 140 m of geogrid walkway and three bridge crossings, with associated civil engineering, structural and ancillary works.

boardwalkgeogrid walkwaybridge crossingscivil engineering

Lokacija

County Donegal, Ireland

Obdobje Storitve

12 months

Vrednost naročila

450.000 €

Rok

09.12.2026 • 12:00

14

Dni

Provide an integrated consultancy design team for a new domestic violence refuge, covering stages (i) to (v) as a full service. Disciplines include design leadership, architecture, structural and civil engineering, building services, quantity surveying, fire safety, disability access, design process supervision, design and assigned certification, employer representation and BIM information management; the lead consultant coordinates and manages the team.

Lokacija

Mallow, County Cork, Ireland

Obdobje Storitve

45 months

Vrednost naročila

400.000 €

Rok

30.11.2026 • 17:00

5

Dni

Provision of Site Assessment Services to the Abbey Theatre

●Abbey Theatre Amharclann na Mainistreach

Carry out a Building Condition Survey documenting the building before changes and providing an independent assessment of its condition. Recommend the interventions needed to meet the operational, accessibility, sustainability and technical requirements of a modern National Theatre in the short, medium and long term.

Building Condition Surveysite assessmentaccessibilitysustainability

Lokacija

Dublin, Ireland

Obdobje Storitve

3 months

Vrednost naročila

139.000 €

Rok

09.12.2026 • 17:00

14

Dni

Lisnamult Access Road N63

●Roscommon County Council_424

Provide engineering services for a new access road from the N63 to Lisnamult, enabling access to land with potential for housing development. The project is intended to include active travel facilities.

Lokacija

Roscommon, Ireland

Obdobje Storitve

3 years

Vrednost naročila

865.000 €

Rok

03.12.2026 • 16:00

8

Dni

Povezani Razpisi v Gradbeništvo

Odkrijte druge priložnosti v isti panogi

Conservation, refurbishment and adaptive reuse works at the former Tipperary Town Courthouse and Bridewell

Tipperary Town, County Tipperary, Ireland

courthouse restorationrefurbishmentadaptive reuseBridewelladult education centre

Rok

18.12.2026

23

Dni

Claureen Link Road Phase 1

County Clare, Ireland

Claureen Link Roadroad constructiondrainagecycle trackutility diversions

Rok

11.12.2026

16

Dni

Meath Co Co - MH-TRA-26-21 - Single-Party Framework for Architect-led Multi Disciplinary Design Services for the initial project of the Laytown - Bettystown Community Building and Park

Bettystown, County Meath, Ireland

architect-led designmultidisciplinary designcommunity buildingpublic parkframework

Rok

07.01.2027

43

Dni

2026 Architectural Design Consultant for ASA project at Scoil Naomh Cualan Pallas Street Borrisoleigh, Thurles, Co. Tipperary

Borrisoleigh, County Tipperary, Ireland

architectural designschool extensionclassroomssensory gardendemolition

Rok

18.12.2026

23

Dni

Appointment of Integrated Design Team for Cork University Business School New Building

Cork, Ireland

integrated design teamarchitectural servicescivil and structural engineeringMEP engineeringenergy-efficient design

Rok

21.12.2026

26

Dni

Refurbishment and Adaptive Re-use of West Gate House and Drogheda Youth Development Building

Drogheda, County Louth, Ireland

refurbishmentadaptive re-useconservationaccessibilitynew extension

Rok

07.12.2026

12

Dni

22 Heatherview Close, Dublin D24 WKD0.

Dublin, Ireland

alterationsextensionupgradesite worksconstruction

Rok

07.12.2026

12

Dni

Erris Looped Walks, Corclough Village, Mullet Peninsula, Co. Mayo

County Mayo, Ireland

walking trail constructionboardwalkaccessible public toiletdrainagetrail signage

Rok

04.01.2027

40

Dni

FIRE REMEDIAL AND REINSTATEMENT WORKS AT MARYMOUNT UNIVERSITY HOSPITAL AND HOSPICE

Cork, Ireland

fire remedial worksreinstatement workshospitalhospice

Rok

21.12.2026

26

Dni

National Centre for Research and Remembrance | Phase 2 | Provision of Civil and Structural Resident Engineering Services (Chartered)

Dublin, Ireland

resident engineercivil engineeringstructural engineeringconstruction

Rok

18.12.2026

23

Dni

Consultancy Services (Integrated Design Team) Enabling the Potential of Ballaghaderreen Plots (Re-Tender)

Ballaghaderreen, County Roscommon, Ireland

integrated design teamtown regenerationplanning consentdetailed designemployer’s representative

Rok

21.12.2026

26

Dni

Invitation to Tender for Building Services Engineering (Mechanical and Electrical) Consultancy Services for CASWS Project at Magh Ene College, Bundoran

Bundoran, County Donegal, Ireland

building services engineeringmechanical consultancyelectrical consultancyclimate actionsummer works

Rok

11.12.2026

16

Dni

Ratoath Junior National School

Ratoath, County Meath, Ireland

electrical installationelectrical upgradeemergency lightingfire alarmESB supply

Rok

16.12.2026

21

Dni

WCCC26 651 Social Housing Apartment Development at The Glen, Waterford

Waterford, Ireland

social housingapartment developmentrefurbishmentdemolitionsite works

Rok

16.12.2026

21

Dni

Architect-Led Design Team Services for the Little Seeds Crèche Extension and Masterplan Strategy in Moyross, Co. Limerick

Moyross, County Limerick, Ireland

architect-led design teamfeasibility masterplancrèche extensionstatutory approvalsconstruction-stage delivery

Rok

14.01.2027

50

Dni