Raskite savo tobulą sutartį.

Ieškokite konkursų per įmones akimirksniu

MW

MWP

Statyba

Airija

MWP veikia sektoriuje Statyba.

Konkursai sektoriuje Statyba

Pramonės šakos atitiktys

Šie konkursai suderinti pagal įmonės pramonės šaką ir šalį. Premium naudotojai gali perimti šią įmonę ir pridėti trūkstamus duomenis tikslesnėms atitiktims rasti. See plan details

Doctor Mc Garry Housing Milltown Phase 2

●Milltown Housing Association Ltd

Construct a single-storey, one-bedroom dwelling and create an apartment within part of the existing community centre. Include all ancillary site development works.

Vieta

Milltown, County Galway, Ireland

Paslaugos Laikotarpis

15 months

Sutarties vertė

700 000 €

Terminas

06.11.2026 • 16:00

1

Diena

●An Post_391

Supply, installation and commissioning of solar photovoltaic systems at An Post properties throughout the Republic of Ireland, with maintenance during the applicable warranty period. The system may also be used for later call-offs for support, maintenance and/or ongoing enhancements, without guaranteed volume.

Solar PV systemssolar panelsinstallation

Vieta

Republic of Ireland

Paslaugos Laikotarpis

2026-11-04 -; 10 years; An Post reserves the right to extend or close the panel early in line with Operational Requirements; maintenance during the applicable warranty period

Terminas

30.11.2031 • 23:59

1851

Dienos

●Office of the Revenue Commissioners_366

Provide a maritime data analysis system that captures, collects, stores, searches, queries, visualises and updates maritime big data; analyses maritime risks and identifies or categorises high-risk threats; and produces risk alerts or profiles, periodic strategic overviews and maritime area analyses for border, coast guard and law enforcement authorities.

Maritime data analysis systemmaritime big datamaritime risk analysis

Vieta

Ireland

Paslaugos Laikotarpis

84 months

Sutarties vertė

1 800 000 €

Terminas

06.11.2026 • 12:00

21

Valandos

Supply and fit a new gas central heating system at Scoil Úna Naofa Primary School, including mechanical and engineering works. The existing 30-year-old system is at end of life; works are to be completed in the school basement.

gas central heatingmechanical servicesengineering services

Vieta

Crumlin, Dublin 12, Ireland

Paslaugos Laikotarpis

9 months

Sutarties vertė

365 000 €

Terminas

06.11.2026 • 17:00

1

Diena

●Wicklow County Council

Appointment of a main contractor to construct two two-bay fire stations, including office, training and welfare facilities, at Baltinglass and Dunlavin, County Wicklow.

fire stationsconstructionmain contractor

Vieta

Baltinglass and Dunlavin, County Wicklow, Ireland

Paslaugos Laikotarpis

18 months

Sutarties vertė

6 500 000 €

Terminas

12.11.2026 • 12:00

6

Dienos

Maintenance, repair, inspection, testing, certification and associated support services for CRC hoisting and care equipment, including overhead and mobile hoists, changing tables, pool hoists, shower trolleys and weighing devices. Supply spare parts and replacement components where required.

maintenancerepairinspection

Vieta

Dublin, Ireland

Paslaugos Laikotarpis

60 months

Sutarties vertė

96 000 €

Terminas

12.11.2026 • 12:00

6

Dienos

●Electricity Supply Board ( ESB )

Multi-supplier framework for commercial services supporting the delivery of ESB’s capital programmes and providing services across ESB Group, including Engineering and Major Projects, ESB Networks, and ESB Generation and Trading. Services are to be delivered in accordance with the RFT scope, framework agreement and associated schedules.

commercial servicescapital programmesframework agreement

Vieta

Ireland

Paslaugos Laikotarpis

8 years; five (5) years with an option to extend, at the Contracting Entity’s discretion, for a further period or periods of up to three years, in increments of two plus one year basis (i.e. for a further 2+1 years)

Sutarties vertė

50 000 000 €

Terminas

09.11.2026 • 14:00

3

Dienos

●Stewarts Care Ltd.

Provision of fully qualified plumber and fully qualified carpenter for 5 days per week/52 weeks per year

plumbingcarpentrymaintenance

Vieta

Dublin, Ireland

Paslaugos Laikotarpis

36 Months

Sutarties vertė

770 000 €

Terminas

11.11.2026 • 13:00

5

Dienos

●Donegal County Council_1193

The project is required to deliver a Transport Hub capable of meeting the long term needs of Letterkenny. Key interventions include a public building, public realm, bus bays, taxi rank, parking and all associated works.

Landscape architectural servicesTransport HubArchitectural services

Vieta

Letterkenny, Ireland

Paslaugos Laikotarpis

42 Months

Sutarties vertė

700 000 €

Terminas

06.11.2026 • 17:00

1

Diena

Technical services for an Engineering Consultancy led, Multi-Disciplinary Design Team for the Clonmel Link Roads

Engineering ConsultancyMulti-Disciplinary Design TeamClonmel Link Roads

Vieta

Clonmel, Ireland

Paslaugos Laikotarpis

44 Months

Sutarties vertė

900 000 €

Terminas

06.11.2026 • 14:00

23

Valandos

Susiję Konkursai Statyba srityje

Atraskite kitas galimybes tame pačiame sektoriuje

Ardsallagh More Access Road

Roscommon, Ireland

Terminas

02.12.2026

27

Dienos

Mechanical Works to Salesian College Celbridge, Co. Kildare (Heating Upgrade)

Celbridge, County Kildare, Ireland

space heatingheating centerheating upgrade

Terminas

24.11.2026

19

Dienos

1300m of 2.4m Height Palisade fencing at Ard Gaoithe Clonmel

Clonmel, County Tipperary, Ireland

Terminas

07.12.2026

31

Dienos

14 Tullyglass Hill

Shannon, County Clare, Ireland

Terminas

03.12.2026

28

Dienos

EWS 2no. Boiler Plant Replacement

Cork, Ireland

boiler replacementboiler plantpipework

Terminas

24.11.2026

18

Dienos

Lisnamult Access Road

Lisnamult, County Roscommon, Ireland

Terminas

02.12.2026

27

Dienos

Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

New Ross, County Wexford, Ireland

Terminas

03.12.2026

27

Dienos

Request for Expressions of Interest for Purpose-Built Student Accommodation ("PBSA") - Potential On-Campus and Off-Campus Development Opportunities

Ireland

Purpose-Built Student AccommodationOn-Campus DevelopmentsHigher Education Institutions

Terminas

27.11.2026

21

Dienos