Trouvez votre contrat idéal.

Recherchez des appels d'offres via des entreprises instantanément

Recherche Experte
T

T BOURKE

Construction

Blackrock (Sandyford / Stillorgan area), Dublin, County Dublin, Irlande
Mechanical EngineeringElectrical ContractingHeizung, Lüftung, Klimatechnik

Appels d'offres correspondants

Wayside Celtic Renewable Energy Project

Wayside Celtic Football Club CLG

The works comprise the removal of existing domestic hot water tanks and associated equipment and the installation of a new heat pump domestic hot water system together with a two-pipe VRF air conditioning system. The successful contractor will be responsible for the supply, installation, controls, commissioning, certification and warranty of all systems, as well as the disposal of existing equipment. All works are to be completed in accordance with the attached tender specification, relevant Irish and EU regulations, and the manufacturers' standards and recommendations.

Heat pumpsMechanical installationsAir conditioning

Lieu

Kilternan, Ireland

Période de Service

12 Months

Valeur Maximale

50.000 €

Date Limite

28.08.202616:00

16

Jours

EWS at Mountmellick FET Mountmellick Co Laois

Laois and Offaly Education and Training Board (Offaly)

EWS 2026 - Electrical Upgrade Works to Mountmellick FET Mountmellick Co Laois. The works entail replacement of the existing electrical services throughout the building.

Electrical installationElectrical wiringMechanical engineering

Lieu

Mountmellick, Ireland

Période de Service

2 Months

Valeur Maximale

200.000 €

Date Limite

18.08.202613:00

6

Jours

Dublin City Council

Delivery of a significant programme of housing projects (social and affordable housing) utilising primarily the Design and Build (DB) delivery model. Includes building construction, multi-dwelling buildings, electrical installation, mechanical installations, and development of residential real estate.

Housing ConstructionDesign and BuildSocial Housing

Lieu

Dublin, Ireland

Période de Service

48 Months

Valeur Maximale

1.750.000.000 €

Date Limite

26.08.202610:00

14

Jours

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Lieu

Kilkenny, Ireland

Période de Service

12 Months

Date Limite

01.09.202610:00

20

Jours

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Lieu

Shannon, Ireland

Période de Service

28 Months

Date Limite

24.08.202611:00

12

Jours

Appels d'Offres Connexes dans Construction

Découvrez d'autres opportunités dans le même secteur

Construction of MUGA for Coolaney/Mullinabreena GAA Club at Achonry

Achonry, Tubbercurry, Co Sligo, Ireland

ConstructionSports FacilitiesMUGA

Date Limite

04.09.2026

23

Jours

72 Inpatient Bed Ward Expansion at University Hospital Limerick

Limerick, Ireland

constructionhospitalexpansion

Date Limite

11.09.2026

30

Jours

GLENMORE TEA ROOMS - RENOVATION AND ALTERATIONS

Kilkenny, Ireland

renovationalterationstea room

Date Limite

28.08.2026

16

Jours

Mary Immaculate College - Tailteann T2 Building Gym

Limerick, Ireland

Building construction workGym renovationElectrical works

Date Limite

07.09.2026

26

Jours

Refurbishment works to 2no. Science labs, prep room and existing rooms at Stanhope Secondary School, Manor St, Stoneybatter, Dublin 7.

Dublin 7, Ireland

RefurbishmentScience labsConstruction

Date Limite

04.09.2026

23

Jours

TR5227 Maintenance of Fire Safety Systems in Substations

Dublin, Ireland

fire safetymaintenancesubstations

Date Limite

09.09.2026

28

Jours

Mountmellick Flood Relief Scheme - Site Investigation

Mountmellick, County Laois, Ireland

site investigationflood reliefground investigation

Date Limite

09.09.2026

28

Jours

Westmeath Non-National Bridge Rehabilitation Works 2026

Mullingar, Ireland

Bridge renewalConstruction workRehabilitation

Date Limite

26.08.2026

14

Jours

Thermal Upgrade Works at St. Colmcille’s National School, The Quay, Westport, County Mayo

Westport, Ireland

Thermal UpgradeInsulationConstruction

Date Limite

28.08.2026

16

Jours

Multi-Party Framework Agreement for Suppliers of Concrete for Dublin City Council

Dublin, Ireland

ConcreteFramework AgreementDublin City Council

Date Limite

11.09.2026

30

Jours

CASWS26 Glanmire CC - Upgrade to Science Labs and Insulation throughout the college

Glanmire Community College, Cork, Ireland

school constructionscience labsinsulation

Date Limite

18.08.2026

6

Jours

Single Party Framework for The Execution of Fire Stopping Works

Dublin, Ireland

fire-preventionfire-stoppingconstruction

Date Limite

04.09.2026

23

Jours

Consultancy Services for Main Pier Repair Works at An Daingean Fishery Harbour Centre, Dingle, Co. Kerry, Ireland

Kerry, Ireland

Engineering servicesCivil engineeringStructural repairs

Date Limite

04.09.2026

23

Jours

The supply, Delivery and installation of Water Wall LEV System for Stone Dust

Dublin, Ireland

Extraction ventilatorsWater Wall LEV SystemStone Dust

Date Limite

27.08.2026

15

Jours

Fenor National School (Co. Waterford)

Fenor, Tramore, Co Waterford, Ireland

constructionschool extensionwastewater treatment

Date Limite

28.08.2026

16

Jours