Trouvez votre contrat idéal.
Recherchez des appels d'offres via des entreprises instantanément
Sorensen Civil Engineering Ltd
Construction
Appels d'offres correspondants
9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.
Lieu
Dublin, Ireland
Période de Service
5 Years
Valeur Maximale
200.000.000 €
Date Limite
25.08.2026 • 10:00
18
Jours
Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh
●Údarás Na Gaeltachta_289
●Údarás Na Gaeltachta_289
Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí
Lieu
Cape Clear, Ireland
Période de Service
18 Months
Valeur Maximale
300.000 €
Date Limite
28.08.2026 • 11:00
21
Jours
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Lieu
Ireland
Période de Service
39 Months
Valeur Maximale
300.000 €
Date Limite
25.08.2026 • 14:00
18
Jours
Piltown Town Centre Regeneration, Co. Kilkenny
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.
Lieu
Kilkenny, Ireland
Période de Service
12 Months
Date Limite
01.09.2026 • 10:00
25
Jours
●Office of Public Works (OPW)
To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. Monaghan.
Lieu
Border, Ireland
Période de Service
18 Months
Valeur Maximale
145.000 €
Date Limite
17.08.2026 • 13:00
10
Jours
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Lieu
Shannon, Ireland
Période de Service
28 Months
Date Limite
24.08.2026 • 11:00
17
Jours
Appels d'Offres Connexes dans Construction
Découvrez d'autres opportunités dans le même secteur