Trouvez votre contrat idéal.
Recherchez des appels d'offres via des entreprises instantanément
Service Master Ireland | Service Gas Boilers & Heat Pumps
Gestion d'Installations
Appels d'offres correspondants
Wayside Celtic Renewable Energy Project
●Wayside Celtic Football Club CLG
●Wayside Celtic Football Club CLG
The works comprise the removal of existing domestic hot water tanks and associated equipment and the installation of a new heat pump domestic hot water system together with a two-pipe VRF air conditioning system. The successful contractor will be responsible for the supply, installation, controls, commissioning, certification and warranty of all systems, as well as the disposal of existing equipment. All works are to be completed in accordance with the attached tender specification, relevant Irish and EU regulations, and the manufacturers' standards and recommendations.
Lieu
Kilternan, Ireland
Période de Service
12 Months
Valeur Maximale
50.000 €
Date Limite
28.08.2026 • 16:00
16
Jours
Appels d'Offres Connexes dans Gestion d'Installations
Découvrez d'autres opportunités dans le même secteur