Trouvez votre contrat idéal.

Recherchez des appels d'offres via des entreprises instantanément

Recherche Experte
RY

Ryan & Associates

Construction

Galway, Galway, Irlande
fire safetyaccessibilityassigned certification

Appels d'offres correspondants

FIN-21 - Architectural and Project Management Services

Health Information and Quality Authority (HIQA)

Architectural and Project Management Services. As a result of modern and changing work practices as well as significant growth of the organisation, the Health Information and Quality Authority (HIQA) has a requirement to explore and scope the redesign of its offices in Cork and in Dublin.

ArchitekturProjektmanagementBüroumbau

Lieu

Dublin, Irland

Période de Service

5 Years

Date Limite

28.08.202613:00

27

Jours

Bremore Ireland Port

Bremore Ireland Port DAC

Strategische Master-Planungsberatung während der Planungs- und Genehmigungsphase des Bremore Ireland Port-Projekts, County Meath. Das Projekt umfasst einen neuen Hafen am Strand sowie ergänzende landside-Infrastruktur für Hafenspeicherung, Logistik, saubere industrielle Entwicklung, Innovation/Forschung und Gemeinschaftsanlagen, die über mehrere Phasen hinweg umgesetzt werden.

Master PlanningUrban PlanningArchitektur

Lieu

Bremore, Irland

Période de Service

3 Jahre

Date Limite

06.08.202615:00

5

Jours

Emergency Works (Co. Wicklow Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services projects comprising of * Improving Disability Access to the Main Entrance in Glenart College, Arklow, Co. Wicklow. * Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.

ArchitekturNotfallmaßnahmenSchulen

Lieu

Dublin, Irland

Période de Service

18 Monate

Valeur Maximale

85.000 €

Date Limite

23.08.202621:45

23

Jours

Emergency Works (Co. Kildare Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services for emergency works including: repair of defective render at Athy Community College, replacement and automation of doors at Ard Scoil Rath Iomghain, and roof repair works to prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain.

Architectural servicesEmergency worksSchools

Lieu

Ireland

Période de Service

18 Months

Valeur Maximale

47.000 €

Date Limite

23.08.202621:45

23

Jours

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Lieu

Ireland

Période de Service

39 Months

Valeur Maximale

300.000 €

Date Limite

25.08.202614:00

24

Jours

Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works

Tipperary County Council

The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.

Architectural DesignEngineering ConsultancyConstruction Supervision

Lieu

Mid-West, Ireland

Période de Service

18 Months

Date Limite

20.08.202610:00

19

Jours

Professional Services for the preparation of a Masterplan for Castletown Estate and Donaghcumper Estate and their historic landscapes

Office of Public Works (OPW)

Professionelle Dienstleistungen zur Erstellung eines Masterplans für Castletown House und Donaghcumper House sowie ihre historischen Landschaften durch ein interdisziplinäres Design-Team.

MasterplanLandschaftsarchitekturDesignberatung

Lieu

Dublin, Irland

Période de Service

6 Monate

Date Limite

03.09.202610:00

33

Jours

Development of a New NPWS Visitor Park Centre for The Burren National Park

Department of Housing Local Government and Heritage

Provision of Architect or Engineer led Design Team Consultancy Services for development at 1-2 Riverview, Church Street, Newtown, Corofin, Co Clare V95 ANP8. The development will consist of: The demolition of 1-2 Riverview buildings and associated outbuildings and boundary wall and the development of a single storey NPWS Visitor Centre for The Burren National Park, 3 storey NPWS office building, car parking facilities with associated vehicle access points and ramp and all associated site development, boundary and landscaping works.

ArchitekturBauentwurfPlanung

Lieu

Corofin, Irland

Période de Service

50 Monate

Date Limite

21.08.202610:00

20

Jours

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly

Offaly County Council_448

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)

Bridge rehabilitationStructural engineeringDesign consultancy

Lieu

Ireland

Période de Service

60 Months

Valeur Maximale

2.000.000 €

Date Limite

14.08.202614:00

13

Jours

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Lieu

Shannon, Ireland

Période de Service

28 Months

Date Limite

24.08.202611:00

23

Jours

1 / 2