Trouvez votre contrat idéal.
Recherchez des appels d'offres via des entreprises instantanément
John Paul Construction
Construction
Appels d'offres correspondants
9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build of Enabling Works at the DART+ and MetroLink Interface at Glasnevin, Dublin, to facilitate the construction of MetroLink. Includes detailed design and construction of key enabling works such as site preparation, demolition, excavation, earthmoving, drainage, railway construction works, and associated civil engineering tasks.
Lieu
Dublin, Ireland
Période de Service
5 Years
Valeur Maximale
200.000.000 €
Date Limite
25.08.2026 • 10:00
25
Jours
Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh
●Údarás Na Gaeltachta_289
●Údarás Na Gaeltachta_289
Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh, Athchóirithe agus Síneadh ar Ionad Oidhreachta Oileán Chléire, Oileán Chléire, Co. Chorcaí
Lieu
Cape Clear, Ireland
Période de Service
18 Months
Valeur Maximale
300.000 €
Date Limite
28.08.2026 • 11:00
28
Jours
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Lieu
Ireland
Période de Service
39 Months
Valeur Maximale
300.000 €
Date Limite
25.08.2026 • 14:00
26
Jours
Works Contract for Proposed Modular Expansions and Internal Refurbishment Works to Emergency Department at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Modulare Erweiterungsarbeiten und interne Sanierungsarbeiten am Notaufnahmeprogramm (Emergency Department) des Beaumont Hospital.
Lieu
Dublin, Irland
Période de Service
1 Jahr
Valeur Maximale
7.000.000 €
Date Limite
24.08.2026 • 10:00
24
Jours
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Lieu
Ireland
Période de Service
60 Months
Valeur Maximale
2.000.000 €
Date Limite
14.08.2026 • 14:00
15
Jours
Assigned Certifier Services for the Department of Education and Youth Lot 09 Design and Build projects
●Department of Education and Youth
●Department of Education and Youth
Zertifizierungsdienstleistungen für das Ministerium für Bildung und Jugend für Projekte im Rahmen des Design-and-Build-Schulen-Mehrpartei-Auftragsrahmens Nummer 1 2020-2021 gemäß den Vorschriften zur Baugenehmigung (Änderung).
Lieu
Dublin, Irland
Période de Service
24 Monate
Date Limite
20.08.2026 • 10:00
20
Jours
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Lieu
Shannon, Ireland
Période de Service
28 Months
Date Limite
24.08.2026 • 11:00
24
Jours
Air Handling Unit and Chiller Installation at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.
Lieu
Dublin, Ireland
Période de Service
24 Months
Date Limite
10.08.2026 • 10:00
10
Jours
Procurement of an Integrated Design Team for New DV Refuge at Tailteann Drive, Navan, Co Meath for Meath Women's Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
Beschaffung eines integrierten Design-Teams bestehend aus Projektmanager, Architekt mit Landschaftsdesign-Dienstleistungen, Vertretung des Auftraggebers, Projektüberwacher für den Designprozess, Brandschutz- und DAC-Ingenieur, Design- und Zertifizierungsbeauftragte, Bauingenieur für Zivil- und Tragwerksbau, Gebäudeanlagentechniker und Kostenplaner für ein neues DV-Refugium an der Tailteann Drive, Navan, Co Meath.
Lieu
Navan, Irland
Période de Service
42 Monate
Valeur Maximale
750.000 €
Date Limite
14.08.2026 • 10:00
14
Jours
TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council
●Cavan County Council
●Cavan County Council
Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).
Lieu
Cavan, Irland
Période de Service
18 Monate
Date Limite
07.08.2026 • 10:00
7
Jours
Appels d'Offres Connexes dans Construction
Découvrez d'autres opportunités dans le même secteur