Nájdite svoj dokonalý kontrakt.

Vyhľadajte firmy alebo verejné zákazky.

WR

wrap-it packaging

Výroba

wrap-it packaging pôsobí v odvetví Výroba.

Zákazky pre Výroba

Odvetvové zhody

Tieto zákazky zodpovedajú odvetviu a krajine spoločnosti. Používatelia s aktívnym účtom FREE si môžu túto spoločnosť nárokovať a doplniť chýbajúce údaje pre presnejšie zhody. Zobraziť podrobnosti plánov

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioningBus ServicesQualification Panel

Miesto

Dublin, Ireland

Obdobie Služby

not less than 5 years

Termín

29.08.2027 • 15:00

282

Dní

●Health Service Executive (HSE)

Supply of Enteral Nutrition Products and Related Devices, including pumps, nutritional pumps, special nutritional products, medical consumables, administration sets, and miscellaneous medical devices and products.

Enteral feedsMedical devicesNutritional productsPumpsMedical consumables

Miesto

Dublin, Ireland

Obdobie Služby

02/09/2026 – 02/09/2033

Hodnota zákazky

210 000 000 €

Termín

02.09.2033 • 15:00

2478

Dní

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC worksFSRU integrationPipeline construction…

Miesto

Ireland

Obdobie Služby

28. 07. 2026 - 27. 07. 2036

Termín

25.07.2036 • 12:00

3535

Dní

Anschaffung von emissionsarmen Coaches und Schulbussen sowie, wo möglich, emissionsfreien Coaches mit geringem Umweltausdruck im Einklang mit der neuesten EURO VI-Verordnung. Die Fahrzeuge müssen die Leitlinien der EPA für Straßenverkehrsfahrzeuge und die europäischen Gemeinschaftsbestimmungen über saubere und energieeffiziente Straßenverkehrsfahrzeuge einhalten.

BusCoachEmissionsarmVerkehrsmittelBeschaffung…

Miesto

Dublin, Irland

Obdobie Služby

60 Monate

Hodnota zákazky

720 000 000 €

Termín

31.03.2033 • 12:00

2323

Dní

●Donegal Education and Training Board_368

Dynamic Purchasing System (DPS) for Course Consumables for use in Training Centres and Schools

SteelPipingSuppliesDPSConsumables…

Miesto

Ireland

Obdobie Služby

26. 06. 2026 - 26. 06. 2031

Hodnota zákazky

10 000 000 €

Termín

26.06.2031 • 14:00

1679

Dní

●Gas Networks Ireland

Design, Herstellung, Montage, Lieferung und Inbetriebnahme kompletter Paketkesselanlagen (PBU) mit natürlichen Gas-betriebenen Kesseln, natürlichen Gas-betriebenen Generatoren, zugehörigen LPHW-Systemen, Steuerungs- und Automatisierungssystemen, Instrumentierung, Dokumentation, FAT/SAT sowie Inbetriebnahmesupport. Dazu gehört der Kauf von Wärmeübertragern als Teil eines integrierten natürlichen Gas-Vorwärmesystems. GNI kann alle oder Teile der PBU und Wärmeübertrager beschaffen. Während des Rahmenzeitraums können zusätzliche Dienstleistungen, Arbeiten und Lieferungen erforderlich sein, z. B. die Bereitstellung von Kesseln und allen Nebenanlagen zur sicheren und effizienten Betriebsführung der PBU. GNI behält sich das Recht vor, Prüfungen (einschließlich Lieferantenqualitätsprüfungen) durchzuführen.

KesselanlagenGasnetzQualifikationssystemWärmeerzeugerInfrastruktur

Miesto

Irland

Obdobie Služby

120 Monate

Termín

15.05.2036 • 12:00

3464

Dní

●Iarnród Eireann-Irish Rail

Provision of strategic/expert advisory services, professional services secondments, project management deliverables, planning advice, alternative design options, and other consultancy services across multiple fields including architectural, engineering, environmental, financial, HR, and safety consultancy.

ArchitekturIngenieurwesenBeratungProjektmanagementUmwelt

Miesto

Irland

Obdobie Služby

02. 03. 2026 - 03. 03. 2031

Termín

01.03.2031 • 12:00

1562

Dní

Supply of, Repair and Maintenance for Body Parts; Supply of Parts, Repair and Maintenance of Chassis; Supply of Parts, Repair and Maintenance of Body Panels and Structure; Supply of Parts, Repair and Maintenance of Glazing; Supply of Parts, Repair and Maintenance of Heating, Ventilation and Air Conditioning Systems; Supply of, Repair and Maintenance of Hoses and Pipes; Supply of, Repair and Maintenance of Exterior and Interior Fittings; Supply of, Repair and Maintenance of Ancillary Onboard equipment; Supply of Wheel Rims; Supply of Parts, Repairs and Maintenance of Braking Systems; Supply of Suspension and Steering Systems; Supply of, Repair and Maintenance for General Driveline Systems; Supply of Filters; Supply of, Repair and Maintenance of Electrical and Electronic Components.

Spare PartsBus FleetQualification PanelVehicle MaintenanceTransport Equipment

Miesto

Dublin, Ireland

Obdobie Služby

60 Months

Termín

30.04.2033 • 12:00

2353

Dní

Bus Éireann beabsichtigt, emissionsarme Reisebusse und Schulbusse sowie, wo möglich, null-Emissions-Reisebusse mit geringem Umweltausstoß gemäß der neuesten EURO VI-Verordnung zu beschaffen. Die Fahrzeuge werden den Leitlinien der EPA für Straßenverkehrsfahrzeuge und den Europäischen Gemeinschafts-Verordnungen über saubere und energieeffiziente Straßenverkehrsfahrzeuge (Änderungs-)Verordnung 2021 entsprechen.

ReisebusseSchulbusseEmissionsarmLeasingKauf

Miesto

Dublin, Irland

Obdobie Služby

60 Monate

Hodnota zákazky

480 000 000 €

Termín

31.05.2033 • 12:00

2384

Dní

●Waterford and Wexford Education and Training Board_110494

Panel of Service Providers for the provision of BUS HIRE SERVICES to St. Paul's Community College in Waterford. The requirement will be based on the school's need for bus services. The purpose will be to facilitate students/participants and staff travelling from and to Schools and Centres for various individual trips which may include day trips, sporting events, competitions, careers fairs, science outing, debates and award ceremonies etc.

Bus HireTransport ServicesSchool TravelPassenger TransportDriver Services

Miesto

Dublin, Ireland

Obdobie Služby

48 Months

Hodnota zákazky

210 000 €

Termín

15.04.2027 • 13:00

146

Dní

Súvisiace Zákazky v Výroba

Objavte ďalšie príležitosti v rovnakom odvetví

Call for Tenders for the Supply and Delivery of Dress Design Equipment to Scoil Phobail Sliabh Luachra, Rathmore,Co Kerry

Rathmore, County Kerry, Ireland

dress design equipmentsewing machinesscissorsgoods deliveryinstallation

Termín

01.12.2026

11

Dní

SPU CO87-2026 Provision of Carbon Flux Monitoring System

Wexford, Ireland

carbon fluxmonitoring systemcarbon monitoringmeasurement instruments

Termín

25.11.2026

5

Dní

Supply and delivery of replacement GRC Decking boards for use on the North Shannon Navigation

Roosky, County Roscommon, Ireland

GRC decking boardsmarine construction materialsNorth Shannon Navigationdelivery

Termín

20.11.2026

19

Hodiny

The provision of a new Pattern Matching Machine for Midland Furniture Ltd.

Laois, Ireland

pattern matching machinemachinerywaste reductiontime efficiency

Termín

14.12.2026

24

Dní

Supply and Delivery of 30 Barometric Pressure Sensors for Met Éireann

Glasnevin, Dublin, Ireland

barometric pressure sensorsautomatic weather stationsaviation observation networkscalibration

Termín

04.01.2027

45

Dní

Supply of Engines and Sundry Engine Components

Dublin, Ireland

enginesengine componentsreplacement enginesmaintenance spare partsmulti-provider framework

Termín

21.12.2026

31

Dní

Supply and Delivery of Planer Thicknesser Woodworking Saw (2 Units).

Ireland

planer thicknesserwoodworking saw

Termín

30.11.2026

10

Dní

Supply of Wipers and Wiper Equipment

Dublin, Ireland

Termín

14.12.2026

24

Dní

A11 Lifejackets for the Irish Naval Service

Ireland

Termín

17.12.2026

27

Dní