Nájdite svoj dokonalý kontrakt.

Vyhľadajte zákazky cez spoločnosti okamžite

SM

Smart-Builder

Stavebníctvo

Smart-Builder pôsobí v odvetví Stavebníctvo.

Zákazky pre Stavebníctvo

Odvetvové zhody

Tieto zákazky zodpovedajú odvetviu a krajine spoločnosti. Používatelia Premium si môžu túto spoločnosť nárokovať a doplniť chýbajúce údaje pre presnejšie zhody. See plan details

High Throughput Transient Antibody Production and Characterisation Services

●National Institute for Bioprocessing Research and Training (NIBRT)

Provide high-throughput transient antibody production and characterisation services for an active discovery programme. Research-use only; GMP manufacture is not required. Demonstrate data integrity practices aligned with 21 CFR Part 11 principles where reasonably achievable.

antibody productionantibody characterisationhigh-throughput services

Miesto

Ireland

Obdobie Služby

36 months

Hodnota zákazky

375 000 €

Termín

04.11.2026 • 12:00

28

Dní

●Wicklow County Council

Appointment of a main contractor to construct two two-bay fire stations, including office, training and welfare facilities, at Baltinglass and Dunlavin, County Wicklow.

fire stationsconstructionmain contractor

Miesto

Baltinglass and Dunlavin, County Wicklow, Ireland

Obdobie Služby

18 months

Hodnota zákazky

6 500 000 €

Termín

12.11.2026 • 12:00

36

Dní

Extend and alter Fahy National School to provide additional mainstream and special needs accommodation, complete ancillary siteworks and services, provide a temporary construction access onto the public road, and upgrade the existing proprietary effluent treatment system.

school accommodationextensionsalterations

Miesto

Fahy, Westport, Ireland

Obdobie Služby

04. 01. 2027 -; 20 months

Hodnota zákazky

2 750 000 €

Termín

22.10.2026 • 17:00

15

Dní

Design and install a solar photovoltaic system, battery energy storage system and two electric vehicle charging points at the National Bioeconomy Pilot Plant in Lisheen.

Solar PVBattery energy storageEV charging points

Miesto

Lisheen, County Tipperary, Ireland

Obdobie Služby

8 months

Hodnota zákazky

400 000 €

Termín

30.10.2026 • 14:00

23

Dní

●Electricity Supply Board ( ESB )

Multi-supplier framework for commercial services supporting the delivery of ESB’s capital programmes and providing services across ESB Group, including Engineering and Major Projects, ESB Networks, and ESB Generation and Trading. Services are to be delivered in accordance with the RFT scope, framework agreement and associated schedules.

commercial servicescapital programmesframework agreement

Miesto

Ireland

Obdobie Služby

8 years; Up to 2 extensions; The duration of this framework is five (5) years with an option to extend, at the Contracting Entity’s discretion, for a further period or periods of up to three years, in increments of two plus one year basis (i.e. for a further 2+1 years)

Hodnota zákazky

50 000 000 €

Termín

09.11.2026 • 14:00

33

Dní

7No. Bed Residential Units at Tierney Street

●St. John of God Housing Association CLG

Construction of seven new residential units at Tierney Street, Ardee, County Louth, for St. John of God Community Services.

residential unitsconstructionbed units

Miesto

Ardee, County Louth, Ireland

Obdobie Služby

15 months

Hodnota zákazky

1 700 000 €

Termín

30.10.2026 • 15:00

23

Dní

Construct a new pedestrian and cyclist gateway connection to the Sport Ireland Campus via the Tolka Gateway route, including pathway upgrades, underground utilities, drainage, public lighting, CCTV, retaining structures, site access and associated civil and electrical engineering works.

pedestrian gatewaycyclist connectiondrainage infrastructure

Miesto

Dublin, Ireland

Obdobie Služby

4 months

Hodnota zákazky

1 500 000 €

Termín

28.10.2026 • 12:00

21

Dní

Establish a single-supplier framework for the phased supply, delivery, installation and support of an enterprise-grade campus sensing solution. The initial call-off covers anonymous occupancy and space-utilisation sensing in timetabled teaching spaces. The solution must integrate with Trinity College Dublin’s existing enterprise network and information systems. At the authority’s discretion and subject to budget, later call-offs may cover building occupancy, environmental and energy/sub-metering sensing.

campus occupancy sensingspace utilisationsensor installation

Miesto

Dublin, Ireland

Obdobie Služby

48 months

Hodnota zákazky

1 000 000 €

Termín

03.11.2026 • 14:00

27

Dní

Provide integrated planning, engineering, environmental, stakeholder-engagement and specialist consultancy services for the Clontarf Flood Defence and Public Realm Project. Initial call-off services cover option identification, scheme development, environmental assessment, statutory consent processes and detailed design, including technical studies, surveys, modelling, assessments, reports, designs and application documentation. The framework may also be used for procurement support, construction-stage, post-consent and other related specialist consultancy services.

integrated design teamflood defenceenvironmental assessment

Miesto

Clontarf, Dublin, Ireland

Obdobie Služby

7 years

Hodnota zákazky

7 500 000 €

Termín

15.10.2026 • 12:30

8

Dní

●Pobal

Establish and operate a single-party framework for a GIS mapping solution, providing support, development, maintenance and associated services for current and future requirements. Scope includes GIS infrastructure, ArcGIS platform support, data management, accessibility, integration, analytics, governance and ongoing operational support.

GIS mappingArcGIS supportdata management

Miesto

Ireland

Obdobie Služby

4 years

Hodnota zákazky

750 000 €

Termín

02.11.2026 • 11:00

26

Dní

Súvisiace Zákazky v Stavebníctvo

Objavte ďalšie príležitosti v rovnakom odvetví

7No. Bed Residential Units at Tierney Street

Ardee, County Louth, Ireland

residential unitsconstructionbed units

Termín

30.10.2026

23

Dní

Design and Installation of Solar PV Battery Energy Storage System and Two EV Charging Points at the National Bioeconomy Pilot Plant Lisheen

Lisheen, County Tipperary, Ireland

Solar PVBattery energy storageEV charging points

Termín

30.10.2026

23

Dní

TII499 Luas Finglas Main Infrastructure Design and Construction Works

Dublin, Ireland

Luas Finglaslight railtrack

Termín

14.12.2026

68

Dní

New Plumbing Training Workshop at Banagher Further education and Training Centre

Banagher, County Offaly, Ireland

constructiontraining workshopplumbing

Termín

27.10.2026

20

Dní

Dublin City Council Contract for a Reserved Specialist to carry out Pitch Installation for Dalymount Park Redevelopment

Dublin, Ireland

hybrid natural grass pitchpitch installationirrigation system

Termín

04.11.2026

28

Dní

Baltinglass Town Centre Refurbishment Project Phase 1A

Baltinglass, County Wicklow, Ireland

cobble stone footpathssustainable urban drainageunderground utilities

Termín

19.11.2026

43

Dní

WCC472026 Tender for the construction of two new fire stations at Baltinglass and Dunlavin Co. Wicklow

Baltinglass and Dunlavin, County Wicklow, Ireland

fire stationsconstructionmain contractor

Termín

12.11.2026

36

Dní

Sport Ireland Minor Capital Works Multiparty Framework - Call off Competition for Lot 2 Lot 2 Civil Engineering Works

Dublin, Ireland

pedestrian gatewaycyclist connectiondrainage infrastructure

Termín

28.10.2026

21

Dní

Schools Energy Pathfinder 2025 - Biomass Programme - Heating Upgrade and Building Enabling Works Package - Bundle 4 (CMETB)

Border, Ireland

ConstructionHeating UpgradeBiomass Installation

Termín

22.10.2026

15

Dní

Multi Operator Framework for Project Managers with Design/Technical Consultants for Educational Accommodation

Dublin, Ireland

Project ManagementEducational AccommodationSEN Refurbishing

Termín

02.11.2026

26

Dní

Mechanical and Carpentry Services Contract

Dublin, Ireland

plumbingcarpentrymaintenance

Termín

11.11.2026

35

Dní

Term Maintenance Contract for Mechanical Services to Westmeath County Council Houses

Mullingar, Ireland

mechanical servicesmaintenancerefurbishment

Termín

02.11.2026

26

Dní

Residential Units at Tierney Street

Ardee, Ireland

ConstructionResidential UnitsHousing

Termín

30.10.2026

23

Dní