Nájdite svoj dokonalý kontrakt.
Vyhľadajte zákazky cez spoločnosti okamžite
Skanstec Engineering
Obchodné služby
Zodpovedajúce zákazky
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Miesto
Ireland
Obdobie Služby
39 Months
Maximálna Hodnota
300.000 €
Termín
25.08.2026 • 14:00
27
Dní
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Miesto
Ireland
Obdobie Služby
60 Months
Maximálna Hodnota
2.000.000 €
Termín
14.08.2026 • 14:00
16
Dní
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Miesto
Shannon, Ireland
Obdobie Služby
28 Months
Termín
24.08.2026 • 11:00
26
Dní
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
●Tipperary County Council
●Tipperary County Council
Identification, design and submission for planning consent of a Flood Relief Scheme, completion of detailed design, and procurement, management and oversight of the construction of the Scheme. Tasks include engineering and environmental consultancy services.
Miesto
Ireland
Obdobie Služby
108 Months
Maximálna Hodnota
3.000.000 €
Termín
02.09.2026 • 10:00
35
Dní
Procurement of an Integrated Design Team for New DV Refuge at Tailteann Drive, Navan, Co Meath for Meath Women's Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
Beschaffung eines integrierten Design-Teams bestehend aus Projektmanager, Architekt mit Landschaftsdesign-Dienstleistungen, Vertretung des Auftraggebers, Projektüberwacher für den Designprozess, Brandschutz- und DAC-Ingenieur, Design- und Zertifizierungsbeauftragte, Bauingenieur für Zivil- und Tragwerksbau, Gebäudeanlagentechniker und Kostenplaner für ein neues DV-Refugium an der Tailteann Drive, Navan, Co Meath.
Miesto
Navan, Irland
Obdobie Služby
42 Monate
Maximálna Hodnota
750.000 €
Termín
14.08.2026 • 10:00
16
Dní
TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council
●Cavan County Council
●Cavan County Council
Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).
Miesto
Cavan, Irland
Obdobie Služby
18 Monate
Termín
07.08.2026 • 10:00
9
Dní
The provision of Technical and Regulatory Consultancy Support for Gas Energy Safety
●Commission for Regulation of Utilities
●Commission for Regulation of Utilities
Die Bereitstellung von technischer und regulatorischer Beratung für die Gasenergiesicherheit, einschließlich technischer Unterstützung für die Teams GSF, SSB Operations und P and P zur effizienten und effektiven Funktionsweise des Gas-Sicherheitsrahmens und der Überwachung der GSSB.
Miesto
Dublin, Irland
Obdobie Služby
48 Monate
Maximálna Hodnota
2.400.000 €
Termín
31.07.2026 • 10:00
2
Dní
Súvisiace Zákazky v Obchodné služby
Objavte ďalšie príležitosti v rovnakom odvetví