Găsește contractul tău perfect.

Caută licitații prin companii instantaneu

Căutare Expertă
RU

Rubycon Developments Limited

Construcții

Irlanda

Rubycon Developments Limited activează în sectorul Construcții.

Licitații pentru Construcții

Potriviri la nivel de industrie

Aceste licitații sunt potrivite pe baza industriei și țării companiei. Utilizatorii Premium pot revendica această companie și adăuga detaliile lipsă pentru a găsi potriviri mai precise. See plan details

Engineering Consultancy Services for the Ardmore Road to N52 IDA Baltrasna Roundabout Link Road, Mullingar, Co. Westmeath.

Civil engineeringConsultancyTransport systems

Locație

Mullingar, Ireland

Perioada de Serviciu

11 Months

Termen Limită

21.10.2026 • 17:00

11

Zile

The project comprises the refurbishment and upgrade of existing educational facilities at ATU Connemara Campus, Letterfrack, Co. Galway. The works include refurbishment of Machine Hall 1, Machine Hall 3, Computer Laboratory, circulation and stairway areas, Design Studio, staff offices and associated teaching accommodation. The contract includes internal alterations, new floor and wall finishes, installation of a platform lift, upgrades to mechanical and electrical services, associated builders works, temporary works, phasing and coordination within a live operational university environment. The campus includes protected structures and the works shall be carried out in accordance with the project drawings, specifications and employer requirements.

constructionrefurbishmentuniversity

Locație

Letterfrack, Ireland

Perioada de Serviciu

12 Months

Valoarea contractului

300.000 EUR

Termen Limită

15.10.2026 • 12:00

5

Zile

●Kildare and Wicklow Education and Training Board

ARCHITECTURAL or BUILDING SURVEYOR Consultancy Services for the work projects consisting of: • The repair of defective render at Athy Community College, Athy, Co. Kildare • The replacement and automation of doors at the main entrance to Ard Scoil Rath Iomghain, Rathangan, Co. Kildare • Roof repair works to two prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain, Rathangan, Co. Kildare

Building surveying servicesArchitectural servicesEmergency Works

Locație

Naas, Ireland

Perioada de Serviciu

18 Months

Valoarea contractului

47.000 EUR

Termen Limită

15.10.2026 • 23:45

5

Zile

●Clare County Council

Main Works SAQ for N67/N85 inner Relief Road Ennistymon (Blakes Corner). Works for complete or part construction and civil engineering work, including site preparation, bridge construction, bridge sections, and structures of bridges.

constructioncivil engineeringbridge

Locație

Ennis, Ireland

Perioada de Serviciu

18 Months

Valoarea contractului

30.000.000 EUR

Termen Limită

23.10.2026 • 17:00

13

Zile

●Clare County Council

Main Works SAQ for N67/N85 Inner Relief Road Ennistymon (Blakes Corner). Main nature of the contract: Works. Includes site preparation work, bridge construction, bridge sections, structures of bridges, and road bridge construction work.

ConstructionBridgeCivil Engineering

Locație

Ennistymon, Ireland

Perioada de Serviciu

18 Months

Valoarea contractului

30.000.000 EUR

Termen Limită

23.10.2026 • 17:00

13

Zile

●Iarnród Eireann-Irish Rail

Supply and delivery of Various Steel Sections and Plates.

SteelSectionsPlates

Locație

Dublin, Ireland

Perioada de Serviciu

96 Months

Valoarea contractului

2.000.000 EUR

Termen Limită

21.10.2026 • 12:00

11

Zile

Provision of Architect Led Design Team Consultancy Services for Design and Construction of Social Housing Scheme at the site known as the Black Cat, Black Mill Street, Kilkenny

Architectural servicesDesign TeamSocial Housing

Locație

Kilkenny, Ireland

Perioada de Serviciu

3 Years

Valoarea contractului

350.000 EUR

Termen Limită

16.10.2026 • 12:00

6

Zile

Dublin City Council (DCC) is leading the development of the Dublin District Heating Project (DDHP) which aims to capture waste heat from industrial facilities on the Poolbeg Peninsula, and pipe it into homes, businesses and civic buildings in the Poolbeg, Ringsend and Docklands areas of Dublin city via a pipeline network. The primary heat source for the project will be the Dublin Waste to Energy (DWtE) facility at Poolbeg. The DDHP requires the installation of underground, highly insulated District Heating pipes. Site investigations are required to assess ground conditions along the proposed route which will inform detailed design. The total extent of the project as described in the site location map provided, has an approximate length of 6.6km. This site investigation works will be divided into the following Phases. Phase 1: Phase 1 is located in in the Poolbeg area and starts from the DWtE Facility and extends to the eastern boundary of the Irish Glass Bottle (IGB) Development. The length of the DDHP in this area is approximately 1 km. The specific works covered under Phase 1 include the following: • 15 Boreholes • 4 Slit Trenches • 4 Trial Pits Phase 2: Phase 2 extends from Seán Moore Road at the western boundary of the IGB site to the North Docklands area via Bremen Road, Ringsend Park, York Road to the North Docklands as far as Spencer Dock. The length of the DDHP in this area is approximately 5.6km. The specific works covered under Phase 2 include the following: • 12 Boreholes • 22 Slit Trenches • 4 Trial Pits

Ground investigationSite investigationBoreholes

Locație

Dublin, Ireland

Perioada de Serviciu

6 Months

Valoarea contractului

960.000 EUR

Termen Limită

14.10.2026 • 17:00

4

Zile

Apprentice Expansion Project

●Munster Technological University.

The construction of a new two storey extension to Block A, with links back to the existing building. Upgrade of the existing Plastering Workshop to facilitate new Pipefitting Workshop, phased delivery required to maintain curriculum, Upgrade Works to internal Shared specialistspace Associated M and E Works.

Building installation workElectrical installation workHeating

Locație

Tralee, Ireland

Perioada de Serviciu

14 Months

Termen Limită

23.10.2026 • 12:00

13

Zile

The programme will develop for delivery up to 138 schools energy efficiency and decarbonisation measures of heat pumps and biomass boilers in 20 separate bundles.

Project managementQuantity surveyingEnergy efficiency

Locație

Dublin, Ireland

Perioada de Serviciu

4 Years

Valoarea contractului

4.800.000 EUR

Termen Limită

14.10.2026 • 17:00

4

Zile

Licitații Conexe în Construcții

Descoperiți alte oportunități în același sector

Doctor Mc Garry Housing Milltown Phase 2

Milltown, County Galway, Ireland

Termen Limită

06.11.2026

27

Zile

National Biorrefinery Pilot Plant painting works

Tipperary, Ireland

Termen Limită

19.10.2026

9

Zile

Grand Canal Greenway Phase 2 For Kildare County Council

Kildare, Ireland

Grand Canal Greenwaytrail wideningtrail resurfacing

Termen Limită

12.11.2026

33

Zile

Electrical Infrastructure Upgrade Works and Establishing a Framework Agreement at St James's Hospital

Dublin, Ireland

Electrical infrastructureUpgrade worksFramework agreement

Termen Limită

05.11.2026

26

Zile

De La Salle College Dundalk, Co. Louth

Dundalk, County Louth, Ireland

school extensionASD unitsite entrance

Termen Limită

26.10.2026

16

Zile

Mechanical and Engineering services to supply and fit new Gas Central Heating System in Scoil Úna Naofa Primary School, Crumlin, Dublin 12.

Crumlin, Dublin 12, Ireland

gas central heatingmechanical servicesengineering services

Termen Limită

06.11.2026

27

Zile

Technical Consultancy Services for Port Access Northern Cross Route (PANCR) Phase 3 - (TII Phases 5-7)

Louth, Ireland

Technical consultancyengineering appraisalroad construction

Termen Limită

02.11.2026

23

Zile

Gracefield Road to Vernon Avenue

Dublin, Ireland

active travel schemeprotected cycle lanespedestrian facilities

Termen Limită

27.10.2026

17

Zile

7No. Bed Residential Units at Tierney Street

Ardee, County Louth, Ireland

residential unitsconstructionbed units

Termen Limită

30.10.2026

20

Zile