Găsește contractul tău perfect.
Caută licitații prin companii instantaneu
Galetech Group
Energie, Utilități și Tratarea Deșeurilor
Licitații potrivite
2026 NMBI RFT for Solar Power Panels Installation
●Bord Altranais agus Cnáimhseachais na hÉireann Nursing and Midwifery Board of Ireland
●Bord Altranais agus Cnáimhseachais na hÉireann Nursing and Midwifery Board of Ireland
Conception, fourniture, installation, mise en service et maintenance d'un système photovoltaïque (PV) de 37 kW (environ) à installer sur le toit des bureaux corporatifs à Blackrock, Co. Dublin. Le système doit respecter toutes les normes irlandaises et européennes pertinentes.
Locație
Blackrock, Dublin, Irlande
Perioada de Serviciu
24 Months
Valoare Maximă
50.000 €
Termen Limită
11.09.2026 • 13:00
44
Zile
Galway City Council - Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.
●Galway City Council
●Galway City Council
Inspection of ventilation system, Ventilation equipment, Ventilation ducting, Ventilation installation work, Parts of heat pumps, Heat pumps. Single Party Framework for the provision of Heat Pump and Ventilation servicing and maintenance of social housing.
Locație
Galway, Irland
Perioada de Serviciu
48 Monate
Valoare Maximă
500.000 €
Termen Limită
10.08.2026 • 10:00
12
Zile
Air Handling Unit and Chiller Installation at Beaumont Hospital
●Beaumont Hospital_403
●Beaumont Hospital_403
Installation and commissioning of a new air handling unit and chiller within the Hospital's existing V6b plantroom and chiller compound. The appointed contractor will act as PSCS for the project.
Locație
Dublin, Ireland
Perioada de Serviciu
24 Months
Termen Limită
10.08.2026 • 10:00
12
Zile
Licitații Conexe în Energie, Utilități și Tratarea Deșeurilor
Descoperiți alte oportunități în același sector