Găsește contractul tău perfect.
Caută licitații prin companii instantaneu
CroCon Engineers Ltd.
Construcții
Licitații potrivite
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Locație
Ireland
Perioada de Serviciu
39 Months
Valoare Maximă
300.000 €
Termen Limită
25.08.2026 • 14:00
27
Zile
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Locație
Ireland
Perioada de Serviciu
60 Months
Valoare Maximă
2.000.000 €
Termen Limită
14.08.2026 • 14:00
16
Zile
Asbestos Surveys in PMVT buildings/locations
●Peter McVerry Trust_121127
●Peter McVerry Trust_121127
By understanding the volume of asbestos present in properties, PMVT can proactively manage and hold an up to date register of known asbestos within our stock while also giving the ability to put in place appropriate safeguards and plan for future safety works to manage the issue if and when required.
Locație
Ireland
Perioada de Serviciu
48 Months
Termen Limită
19.08.2026 • 15:30
21
Zile
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Locație
Shannon, Ireland
Perioada de Serviciu
28 Months
Termen Limită
24.08.2026 • 11:00
26
Zile
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
●Tipperary County Council
●Tipperary County Council
Identification, design and submission for planning consent of a Flood Relief Scheme, completion of detailed design, and procurement, management and oversight of the construction of the Scheme. Tasks include engineering and environmental consultancy services.
Locație
Ireland
Perioada de Serviciu
108 Months
Valoare Maximă
3.000.000 €
Termen Limită
02.09.2026 • 10:00
35
Zile
Procurement of an Integrated Design Team for New DV Refuge at Tailteann Drive, Navan, Co Meath for Meath Women's Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
Beschaffung eines integrierten Design-Teams bestehend aus Projektmanager, Architekt mit Landschaftsdesign-Dienstleistungen, Vertretung des Auftraggebers, Projektüberwacher für den Designprozess, Brandschutz- und DAC-Ingenieur, Design- und Zertifizierungsbeauftragte, Bauingenieur für Zivil- und Tragwerksbau, Gebäudeanlagentechniker und Kostenplaner für ein neues DV-Refugium an der Tailteann Drive, Navan, Co Meath.
Locație
Navan, Irland
Perioada de Serviciu
42 Monate
Valoare Maximă
750.000 €
Termen Limită
14.08.2026 • 10:00
16
Zile
Provision of Programme Oversight and Assurance Services in relation to the MetroLink Programme
●National Transport Authority_1149
●National Transport Authority_1149
Provision of Programme Oversight and Assurance Services in relation to the MetroLink Programme. The Successful Tenderer shall provide project support and day-to-day management of the oversight and assurance of MetroLink from the Approving Authority perspective.
Locație
Dublin, Ireland
Perioada de Serviciu
10 Years
Valoare Maximă
43.588.000 €
Termen Limită
05.08.2026 • 10:00
7
Zile
TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council
●Cavan County Council
●Cavan County Council
Zivilingenieurberatungsleistungen und architektonische Dienstleistungen für die Entwicklung des Regenerierungsschemas für das Bailieborough Town Centre (Stufen i und ii).
Locație
Cavan, Irland
Perioada de Serviciu
18 Monate
Termen Limită
07.08.2026 • 10:00
9
Zile
The provision of Technical and Regulatory Consultancy Support for Gas Energy Safety
●Commission for Regulation of Utilities
●Commission for Regulation of Utilities
Die Bereitstellung von technischer und regulatorischer Beratung für die Gasenergiesicherheit, einschließlich technischer Unterstützung für die Teams GSF, SSB Operations und P and P zur effizienten und effektiven Funktionsweise des Gas-Sicherheitsrahmens und der Überwachung der GSSB.
Locație
Dublin, Irland
Perioada de Serviciu
48 Monate
Valoare Maximă
2.400.000 €
Termen Limită
31.07.2026 • 10:00
2
Zile
Licitații Conexe în Construcții
Descoperiți alte oportunități în același sector