Sib il-kuntratt perfett tiegħek.
Fittex offerti permezz ta' kumpaniji istantanjament
MG Developments
Kostruzzjoni
MG Developments topera fis-settur Kostruzzjoni.
Sejħiet għal Kostruzzjoni
Tqabbil fil-livell tal-industrija
Dawn is-sejħiet huma mqabbla abbażi mill-industrija u l-pajjiż tal-kumpanija. L-utenti b’kont FREE attiv jistgħu jitolbu din il-kumpanija u jżidu d-dettalji neqsin biex isibu tqabbil aktar preċiż. See plan details
Invitation to Tender for the Painting of Tower Section of Passenger Walkway
●Port of Cork Company
●Port of Cork Company
Remove flaking paint and repaint the entire tower section of the passenger walkway at Port of Cork Ferry Port.
Post
Ringaskiddy, County Cork, Ireland
Perjodu tas-Servizz
3 months
Skadenza
20.11.2026 • 17:00
6
Jiem
Cork City and County
●Respond
●Respond
Develop one residential project in the Cork City or Cork County Council area, providing social housing or a mix of social housing and cost-rental homes. The project must deliver 40–100 homes.
Post
Cork, Ireland
Perjodu tas-Servizz
48 months
Valur tal-kuntratt
€5,000,000
Skadenza
16.11.2026 • 17:00
2
Jiem
Re-development of Ringaskiddy Port at Ringaskiddy West
●Port of Cork Company
●Port of Cork Company
Extend the existing deep-water berth, surface land behind the quay and dredge the seabed to -13.4m Chart Datum. Provide lighting, drainage and associated civil, mechanical and electrical works; the authority may adjust the approximate scope.
Post
Ringaskiddy, County Cork, Ireland
Perjodu tas-Servizz
24 months
Skadenza
27.11.2026 • 17:00
13
Jiem
Greysteel Sports Dome with 3G Playing surface and Associated Works
●GREYSTEEL COMMUNITY ENTERPRISES LTD
●GREYSTEEL COMMUNITY ENTERPRISES LTD
Deliver a sports dome with a 3G playing surface and associated works in Greysteel. Refurbish an existing building in Creeslough, County Donegal, to provide community facilities.
Post
Greysteel, County Derry, Ireland; Creeslough, County Donegal, Ireland
Perjodu tas-Servizz
15/12/2026 - 30/06/2029
Valur tal-kuntratt
GB£275,000
Skadenza
20.11.2026 • 12:00
6
Jiem
●Office of Public Works (OPW)
Supply geogrid and geotextile materials for access haul roads and flood-defence earthen embankments in the Office of Public Works’ South West Region.
Post
South West Region, Ireland
Perjodu tas-Servizz
30 months
Valur tal-kuntratt
€400,000
Skadenza
16.11.2026 • 12:00
2
Jiem
Request for Tenders for the provision of Property Valuation Services and Associated Services for The Alzheimer Society of Ireland
●The Alzheimer Society of Ireland
●The Alzheimer Society of Ireland
Undertake comprehensive valuations of ASI’s 14 properties across Ireland, including rebuilding and reinstatement costs for insurance. Provide valuation advice for financial reporting, identify impairment indicators, and establish a consistent portfolio valuation framework.
Post
Republic of Ireland
Perjodu tas-Servizz
5 years
Valur tal-kuntratt
€35,000
Skadenza
25.11.2026 • 12:00
11
Jiem
0053-Supply and Installation of Solar Panels
●An Post_391
●An Post_391
Supply, installation and commissioning of solar photovoltaic systems at An Post properties throughout the Republic of Ireland, with maintenance during the applicable warranty period. The system may also be used for later call-offs for support, maintenance and/or ongoing enhancements, without guaranteed volume.
Post
Republic of Ireland
Perjodu tas-Servizz
04/11/2026 -; 10 years; An Post reserves the right to extend or close the panel early in line with Operational Requirements; maintenance during the applicable warranty period
Skadenza
30.11.2031 • 23:59
1843
Jiem
9843 Design and Build Capacity Enhancement Works at Connolly Station
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.
Post
Dublin, Ireland
Perjodu tas-Servizz
42 Months
Valur tal-kuntratt
€34,000,000
Skadenza
20.11.2026 • 12:00
6
Jiem
Garden Design for Knockreer Gardens Killarney National Park
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
Tenders are being sought for the preparation of a Conservation Design and Development Plan (CDDP) focused on the long-term practice of conservation horticulture at Knockreer House Gardens. The CDDP will be guided by best international practice in conservation design and interpretation.
Post
Wexford, Ireland
Perjodu tas-Servizz
12 Months
Valur tal-kuntratt
€70,000
Skadenza
27.01.2027 • 15:00
74
Jiem
●Bus Eireann/Irish Bus
Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).
Post
Dublin, Ireland
Perjodu tas-Servizz
not less than 5 years
Skadenza
29.08.2027 • 15:00
288
Jiem
Sejħiet Relatati f{industry}
Iskopri opportunitajiet oħra fl-istess settur