Sib il-kuntratt perfett tiegħek.

Fittex offerti permezz ta' kumpaniji istantanjament

Tiftix ta' Espert
HE

Head Energy AS

Enerġija, Utilità u Trattament tal-Iskart

Bergen, Vestland, In-Norveġja
energibygg & anleggkonsulenttjenester

Offerti Li Jaqblu

Utgreiing buss eigenregi

Vestland fylkeskommune

The report shall give a verifiable decision basis for whether – and if so how – Vestland county can organize bus operations in-house for one limited contract area. The aim is to look at • Better resource utilization • More diversity in the business segment/better competition • Flexibility in investment and operation. The report should also highlight consequences for the county administration in its governance/administration and financial risk management for a model where in-house bus operations or a hybrid model (with public ownership of the buses and competitive tendering for operators) can run parallel to full contracting out in the other contract areas. The report shall give a verifiable decision basis considering a realistic time frame for political decisions and regime implementation (organization, recruitment and – if relevant – transfer of undertaking), before a conclusion is drawn about which contract area may be suitable and feasible as a pilot for in-house operations. The report is limited to bus operations. Boats, ferries and light rail are not to be considered. Contract areas/route packages in the geographical area of Vestland shall be considered as possible candidates, and the assignment shall be based on realistic timeframes for political decisions and implementation, so that recommended candidates have an operational feasibility within relevant contractual time windows. The assignment is divided into two phases: Phase 0 and Phase 1. Phase 0: Comprises two sub-deliveries (L0A and L0B) and a political steering point (SP0) inside the phase, where the contracting authority can adjust the scope and possibly limit additional work with alternative models to reduce complexity. The administration has estimated Phase 0 to be between 500 and 900 hours depending on data access, chosen case, and scope of organization and material management. Phase 1 is an option for the contracting authority. This phase covers more specifically defined additional deliverables and/or further analysis. The scope of a potential Phase 1 is estimated at just under 1,350 hours.

bussdriftkonsulenttjenesterforretningsanalyse

Post

Vestland, Norge

Perjodu tas-Servizz

1 Year

Valur Massimu

7.000.000 €

Skadenza

19.08.202608:00

17

Jiem

Procurement - Process support and system tool for the prevention and reduction of sick leave, 2026

Ålesund kommune

Process support and system tools for the prevention and reduction of sick leave, including a service framework agreement and SSA-L for system tools.

Sick leave preventionProcess supportSystem tools

Post

Ålesund, Norge

Perjodu tas-Servizz

2 Years

Valur Massimu

10.000.000 €

Skadenza

11.08.202608:00

9

Jiem

Framework agreement for consultancy services

Kvæfjord Kommune

General technical consulting within the disciplines: Construction, Electro, HVAC and sanitation. Assignments include internal technical consulting.

ByggIngeniørHVAC

Post

Harstad, Norge

Perjodu tas-Servizz

48 Months

Skadenza

17.08.202610:00

15

Jiem

Framework agreement for consultancy services

Kvæfjord Kommune

General technical consulting within the disciplines: Construction, Electro, HVAC and sanitation. Includes internal technical consulting.

ByggIngeniørHVAC

Post

Harstad, Norge

Perjodu tas-Servizz

48 Months

Valur Massimu

12.000.000 €

Skadenza

17.08.202610:00

15

Jiem

26-020 Energy Consultant

Aktieselskapet Vinmonopolet

Vinmonopolet seeks assistance from an energy consultant to reduce energy use and emissions across its 354 shops. The goal is to cut 50% of emissions by 2030 compared to 2018 and achieve a 20% reduction in total energy use by 2030. The contract covers project management consultancy services for energy efficiency improvements.

energieeffektivitetprosjektledelserådgivning

Post

Oslo, Norge

Perjodu tas-Servizz

36 Months

Valur Massimu

3.000.000 €

Skadenza

14.08.202608:00

12

Jiem

Sejħiet Relatati f{industry}

Iskopri opportunitajiet oħra fl-istess settur

Framework agreement for pressure testing, disinfection and neutralisation, etc. 2026

Sandvika, Norwegen

DruckprüfungDesinfektionWasserleitungen

Skadenza

21.08.2026

19

Jiem

Residue waste - transport and treatment from RfD ́s loading station.

Drammen, Norge

RestavfallTransportBehandling

Skadenza

08.09.2026

37

Jiem

100609 - Expansion tanks for district heating - Værnes

Værnes, Norge

district heatingexpansion tanksmobile stand-by

Skadenza

25.08.2026

23

Jiem

Procurement of a Framework Agreement for Aeronautical Chemicals

Norge

ChemicalsAeronauticalMaintenance

Skadenza

07.09.2026

36

Jiem

Procurement of a framework agreement for F-35 Turbine fuel

Norway

Aviation keroseneF-35 fuelTank delivery

Skadenza

10.08.2026

8

Jiem

Battery pack with operational services and market optimisation.

Kristiansand S, Norge

BatteriespeicherEnergiesystemMarktoptimierung

Skadenza

01.09.2026

30

Jiem

New competition, Winter maintenance, roads

Hamarøy, Norge

VintervedlikeholdRutevedlikeholdSnørydding

Skadenza

21.08.2026

19

Jiem