Sib is-sejħa għall-offerti ideali għalik.

Fittex kumpaniji jew sejħiet għall-offerti.

Tiftix ta' Espert
HA

Hampiðjan Group

Manifattura

L-Iżlanda

Hampiðjan Group topera fis-settur Manifattura.

Sejħiet għal Manifattura

Tqabbil fil-livell tal-industrija

Dawn is-sejħiet huma mqabbla abbażi mill-industrija u l-pajjiż tal-kumpanija. L-utenti b’kont FREE attiv jistgħu jitolbu din il-kumpanija u jżidu d-dettalji neqsin biex isibu tqabbil aktar preċiż. Ara d-dettalji tal-pjanijiet

●Landsvirkjun

Design, manufacture, supply, install and commission the rehabilitation and upgrade of six main inlet butterfly valves at Búrfell 1 hydropower plant. Replace the existing valves to ensure reliable, leak-free operation and optimal efficiency.

main inlet valvesbutterfly valveshydropowervalve rehabilitationcommissioning

Post

Búrfell, Iceland

Perjodu tas-Servizz

10/06/2027 - 30/09/2031

Skadenza

09.12.2026 • 12:00

10

Jiem

●Faxaflóahafnir sf.

Manufacture and install 3–5 concrete pontoons and moorings at Reykjavík Harbour, in accordance with the technical specifications.

concrete pontoonsmooringsmarina systeminstallation

Post

Reykjavík, Iceland

Perjodu tas-Servizz

08/12/2026 - 01/06/2028

Skadenza

03.12.2026 • 14:00

4

Jiem

●Isavia ohf

Lieferung von wasserbasierten und lösungsmittelbasierten Farben für Flugplätze sowie retroreflektierenden Perlen im Rahmen eines dynamischen Beschaffungssystems.

Flugplatzfarberetroreflektierende Perlendynamisches BeschaffungssystemFarbenLieferanten

Post

Höfuðborgarsvæði, Ísland

Perjodu tas-Servizz

bis 31/01/2030

Skadenza

01.01.2039 • 12:00

4416

Jiem

●Isavia ohf

Lieferung von wasserbasierten und lösungsmittelbasierten Farben für Flugplätze sowie retroreflektierenden Perlen.

Flugplatzfarberetroreflektierende Perlendynamisches Beschaffungssystemwasserbasierte Farbelösungsmittelbasierte Farbe

Post

Höfuðborgarsvæði, Ísland

Perjodu tas-Servizz

Bis 31/01/2030

Skadenza

01.01.2039 • 12:00

4416

Jiem

Sejħiet Relatati f’Manifattura

Iskopri opportunitajiet oħra fl-istess settur

Flow sensors in wastewater

Reykjavik, Iceland

flow sensorslevel sensorswastewater

Skadenza

08.01.2027

40

Jiem

Main Inlet Valves at Burfell Power Station

Búrfell, Iceland

main inlet valvesbutterfly valveshydropowervalve rehabilitationcommissioning

Skadenza

09.12.2026

10

Jiem

Steel Tubes and Fittings for ÞG-19

Iceland

steel tubesmanufacturingdeliverysteel fittingstees…

Skadenza

17.12.2026

18

Jiem

12kV Ring Main Unit (RMU) switchgear

Reykjavík, Iceland

Skadenza

20.01.2027

52

Jiem

Steel Tubes and Fittings for ÞG-19

Iceland

steel tubesmanufacturingdeliverysteel fittingstees…

Skadenza

17.12.2026

18

Jiem

Floating Pontoon Marina System - Skarfagarður

Reykjavík, Iceland

concrete pontoonsmooringsmarina systeminstallation

Skadenza

03.12.2026

4

Jiem