Trova il tuo contratto perfetto.

Cerca gare d'appalto tramite aziende istantaneamente

Ricerca Esperta
NO

Noel Lawler Consulting Engineers

Edilizia

Dublin, Leinster, Irlanda
Building Services EngineeringEnergy ReductionSustainability

Gare d'Appalto Corrispondenti

Roscommon County Council_424

Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon

EngineeringConsultancyCivil Engineering

Sede

Roscommon, Ireland

Periodo di Servizio

3 Years

Valore Massimo

300.000 €

Scadenza

14.08.202614:00

6

Giorni

Inland Fisheries Ireland

Engineering Consultancy and Design Services for Civil/Structural/Hydraulic Engineering

Civil EngineeringStructural EngineeringHydraulic Engineering

Sede

Dublin, Ireland

Periodo di Servizio

4 Years

Scadenza

11.09.202613:00

34

Giorni

Donegal County Council_1193

Donegal County Council wishes to appoint an Engineering Services Provider (ESP) for the design of interconnector watermains for households and private Group Water Schemes (GWSs) located in Letterbrick to the closest point on the Public Water Supply, or other suitable location as determined by UÉ. The service is to include for all Civil and Hydraulic Design services as required; any environmental / ecological evaluations required; preparation and submission of any planning applications required; preparation of construction tender docs, administration of tender process (publication, clarifications, evaluation, etc.); award and management of construction contract. The ESP will also be required to act as PSDP for the Project.

Engineering designWater supplyCivil engineering

Sede

Lifford, Ireland

Periodo di Servizio

48 Months

Scadenza

09.09.202610:30

32

Giorni

South East Technological University (SETU)

Ad-hoc, maintenance, refurbishment, and emergency electrical installation works for SETU campuses in Waterford and Kilkenny. Response time of 1 hour required. Individual project values up to €30,000.

Electrical installationMaintenanceRefurbishment

Sede

Waterford, Ireland

Periodo di Servizio

36 Months

Scadenza

28.08.202615:00

20

Giorni

Multi-Party Framework agreement for Energy Efficient Design (EED) on an established design team framework for services awarded on a cascade or mini competitions at sole discretion of the Client for Enabling Works projects an indicative value of typically €1.5m to €20m at University Hospital Galway and off campus.

EnergieeffizienzDesignArchitektur

Sede

Galway, Irland

Periodo di Servizio

4 Monate

Valore Massimo

15.000.000 €

Scadenza

21.08.202615:00

13

Giorni

Ballycoolin Bus Depot Design and Build

National Transport Authority_1149

Design and build of a bus depot facility for electric buses, including administrative offices, vehicle washing and cleaning building, maintenance bays, workshops, security facilities, vehicle inspection bays, electrical substation compound, transformer buildings, car parking facilities, cycle parking facilities, and all associated ancillary works.

Bus DepotConstructionDesign and Build

Sede

Dublin, Ireland

Periodo di Servizio

36 Months

Valore Massimo

80.000.000 €

Scadenza

28.08.202610:00

20

Giorni

Electricity Supply Board ( ESB )

Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.

Mechanical EngineeringElectrical EngineeringDesign Services

Sede

Dublin, Ireland

Periodo di Servizio

84 Months

Valore Massimo

1.200.000 €

Scadenza

24.08.202610:00

16

Giorni

Health Service Executive (HSE)

Regionales Rahmenabkommen für HSE Design Team Services 2025 für Hauptkapitalmaßnahmen mit Projektwerten zwischen 50 Mio. und 400 Mio. EUR (exkl. MwSt.). Rahmen für Architektenleistungen (einschließlich Planer und BIM-Information Manager), Mengenverwalter, Gebäudeingenieur, Bauingenieur für zivil- und strukturelle Arbeiten, Brandschutzberater, Projektüberwachungs-Design-Prozess (PSDP), Auftraggebervertreter, energieeffizientes Design-Facilitator und Zuweisender Zertifikatgeber.

ArchitekturBauingenieurwesenRahmenabkommen

Sede

Irland

Periodo di Servizio

48 Monate

Valore Massimo

800.000.000 €

Scadenza

31.08.202610:00

23

Giorni

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Sede

Ireland

Periodo di Servizio

39 Months

Valore Massimo

300.000 €

Scadenza

25.08.202614:00

17

Giorni

Piltown Town Centre Regeneration, Co. Kilkenny

Kilkenny County Council_1185

Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.

ConstructionEV ChargingRoad Works

Sede

Kilkenny, Ireland

Periodo di Servizio

12 Months

Scadenza

01.09.202610:00

24

Giorni

1 / 2

Gare Correlate in Edilizia

Scopri altre opportunità nello stesso settore

Westmeath Non-National Bridge Rehabilitation Works 2026

Mullingar, Ireland

Bridge renewalConstruction workRehabilitation

Scadenza

26.08.2026

18

Giorni

Multi-Party Framework Agreement for Suppliers of Concrete for Dublin City Council

Dublin, Ireland

ConcreteFramework AgreementDublin City Council

Scadenza

11.09.2026

34

Giorni

Mountmellick Flood Relief Scheme - Site Investigation

Mountmellick, County Laois, Ireland

site investigationflood reliefground investigation

Scadenza

09.09.2026

32

Giorni

Thermal Upgrade Works at St. Colmcille’s National School, The Quay, Westport, County Mayo

Westport, Ireland

Thermal UpgradeInsulationConstruction

Scadenza

28.08.2026

20

Giorni

Single Party Framework for The Execution of Fire Stopping Works

Dublin, Ireland

fire-preventionfire-stoppingconstruction

Scadenza

04.09.2026

27

Giorni

CASWS26 Glanmire CC - Upgrade to Science Labs and Insulation throughout the college

Glanmire Community College, Cork, Ireland

school constructionscience labsinsulation

Scadenza

18.08.2026

10

Giorni

The supply, Delivery and installation of Water Wall LEV System for Stone Dust

Dublin, Ireland

Extraction ventilatorsWater Wall LEV SystemStone Dust

Scadenza

27.08.2026

19

Giorni

Consultancy Services for Main Pier Repair Works at An Daingean Fishery Harbour Centre, Dingle, Co. Kerry, Ireland

Kerry, Ireland

Engineering servicesCivil engineeringStructural repairs

Scadenza

04.09.2026

27

Giorni

Fenor National School (Co. Waterford)

Fenor, Tramore, Co Waterford, Ireland

constructionschool extensionwastewater treatment

Scadenza

28.08.2026

20

Giorni

Provision of CCTV and Alarm Maintenance

Dublin, Ireland

CCTVAlarm MaintenancePreventative Maintenance

Scadenza

18.08.2026

10

Giorni

Term Maintenance and Refurbishment Contract ( Building)

Dundalk, Ireland

constructionmaintenancerefurbishment

Scadenza

04.09.2026

27

Giorni

TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council

Cootehill, County Cavan, Ireland

constructionhousesmulti-dwelling

Scadenza

31.08.2026

23

Giorni

Extension to St. Clare's National School Ballyjamesduff

Ballyjamesduff, Ireland

ConstructionPrimary SchoolExtension

Scadenza

21.08.2026

13

Giorni

Contractor for Heating Services Upgrade and Gas Conversion Emergency Works Project 2026 at Scariff Community College, Drewsborough, Scariff, Co. Clare

Scariff, Co. Clare, Ireland

Heating ServicesGas ConversionEmergency Works

Scadenza

21.08.2026

13

Giorni

EWS at Mountmellick FET Mountmellick Co Laois

Mountmellick, Ireland

Electrical installationElectrical wiringMechanical engineering

Scadenza

18.08.2026

10

Giorni