Trova il tuo contratto perfetto.
Cerca gare d'appalto tramite aziende istantaneamente
NetZero Engineering
Energia, Servizi Pubblici e Trattamento Rifiuti
Gare d'Appalto Corrispondenti
Invitation to Tender for Building (Mechanical and Electrical) Consultancy Services for an Emergency Works Project for Upgrading the Heating System in Brannoxtown Community National School, Brannoxto
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Mechanical and Electrical Consultancy Services (including buying in of additional services for other disciplines as required) for the upgrading of the heating system in Brannoxtown Community National School, Brannoxto, Co. Kildare.
Sede
Ireland
Periodo di Servizio
18 Months
Valore Massimo
76.000 €
Scadenza
23.08.2026 • 09:45
25
Giorni
"Invitation to Tender for Building (Mechanical and Electrical) Consultancy Services for an Emergency Works Project for replacing the gas operated water generator system in Coláiste Chraobh Abhann, C
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Mechanical and Electrical Consultancy Services (including buying in of additional services for other disciplines as required) for replacing the gas operated water generator system in Coláiste Chraobh Abhann, Creowen, Kilcoole, Co. Wicklow.
Sede
Wicklow, Ireland
Periodo di Servizio
18 Months
Scadenza
23.08.2026 • 21:45
26
Giorni
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.
Sede
Dublin, Ireland
Periodo di Servizio
84 Months
Valore Massimo
1.200.000 €
Scadenza
24.08.2026 • 10:00
26
Giorni
HSE Estates SW: Regional Design Team Major Framework (€50M - €400M) 2025 for HSE South West Region
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Regionales Rahmenabkommen für HSE Design Team Services 2025 für Hauptkapitalmaßnahmen mit Projektwerten zwischen 50 Mio. und 400 Mio. EUR (exkl. MwSt.). Rahmen für Architektenleistungen (einschließlich Planer und BIM-Information Manager), Mengenverwalter, Gebäudeingenieur, Bauingenieur für zivil- und strukturelle Arbeiten, Brandschutzberater, Projektüberwachungs-Design-Prozess (PSDP), Auftraggebervertreter, energieeffizientes Design-Facilitator und Zuweisender Zertifikatgeber.
Sede
Irland
Periodo di Servizio
48 Monate
Valore Massimo
800.000.000 €
Scadenza
31.08.2026 • 10:00
33
Giorni
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Sede
Ireland
Periodo di Servizio
39 Months
Valore Massimo
300.000 €
Scadenza
25.08.2026 • 14:00
27
Giorni
Piltown Town Centre Regeneration, Co. Kilkenny
●Kilkenny County Council_1185
●Kilkenny County Council_1185
Provision of EV charging and Parking bays and urban renewal enhancement over c.340m of road corridor and 2 no. minor arm approaches. Includes drainage, paving, footpath construction, installation of street furniture, and electrical installation work for EV chargers.
Sede
Kilkenny, Ireland
Periodo di Servizio
12 Months
Scadenza
01.09.2026 • 10:00
34
Giorni
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.
Sede
Dublin, Ireland
Periodo di Servizio
7 Months
Valore Massimo
1.200.000 €
Scadenza
17.08.2026 • 10:00
19
Giorni
Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service
●Roscommon County Council_424
●Roscommon County Council_424
Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon
Sede
Roscommon, Ireland
Periodo di Servizio
3 Years
Scadenza
07.08.2026 • 14:00
9
Giorni
Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works
●Tipperary County Council
●Tipperary County Council
The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.
Sede
Mid-West, Ireland
Periodo di Servizio
18 Months
Scadenza
20.08.2026 • 10:00
22
Giorni
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Sede
Ireland
Periodo di Servizio
60 Months
Valore Massimo
2.000.000 €
Scadenza
14.08.2026 • 14:00
16
Giorni
Gare Correlate in Energia, Servizi Pubblici e Trattamento Rifiuti
Scopri altre opportunità nello stesso settore