Trova il tuo contratto perfetto.

Cerca gare d'appalto tramite aziende istantaneamente

Ricerca Esperta
HO

Horizon Windows and Doors

Edilizia

Dublin, Leinster, Irlanda
uPVC WindowsAluminium WindowsAluclad Windows

Gare d'Appalto Corrispondenti

Daisy Building Enhancement carried out by Donegal County Council

Donegal County Council_1193

Enhancement works to the Daisy building in Barrack Hill Park Carndonagh, including site preparation, erection of fencing, and building construction work.

BauarbeitenSanierungZäune

Sede

Carndonagh, Irland

Periodo di Servizio

6 Monate

Valore Massimo

44.000 €

Scadenza

28.08.202610:00

24

Giorni

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

St. Mary’s Primary School (Dungarvan)

Remedial works to the external building facade to resolve water ingress issues and to restore the integrity of the external facade against further water ingress. Works include external wall treatments, remedial detailing, works to roof overhangs, fascias and soffits, associated internal remedial and repair works. Additionally, installation of attic insulation and pumped cavity wall insulation, and supply and installation of a bike rack.

BauarbeitenSanierungDämmung

Sede

Dungarvan, Ireland

Periodo di Servizio

2 Months

Scadenza

12.08.202613:00

9

Giorni

Fit-Out, Landscaping and Equipment Supply

Seán Ó Domhnaill

Supply and delivery of commercial large kitchen appliances for a new café development. Installation excluded.

KüchengeräteLieferungGastronomie

Sede

Inis Meáin, Irland

Periodo di Servizio

12 Months

Scadenza

21.08.202610:00

17

Giorni

Alterations of an existing building to form new handball alley with associated development works at Lavey GAA grounds

Lavey GAA

Umbau eines bestehenden Gebäudes zu einer modernen Handballbahn und Innenbereich für Spiele, zusammen mit einem Gemeinschaftsbereich zur Unterstützung von Sport, Freizeit, Gesundheit und Wohlbefinden. Dazu gehören die Entwicklung von Gemeinschaftsflächen und zugehörige Bauarbeiten.

HandballbahnUmbauBauarbeiten

Sede

Cavan, Irland

Periodo di Servizio

3 Monate

Valore Massimo

250.000 €

Scadenza

12.08.202610:00

8

Giorni

Connolly Dry Canteen DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten am Connolly Dry Canteen, DFTC, Curragh, Co. Kildare. Bezugnahme auf die mechanischen und elektrischen Zeichnungen gemäß dieser Spezifikation. Hauptklassifikation: Bauarbeiten (CPV 45000000), Gebäudebau (45210000), Fenster, Türen und verwandte Artikel (44221000), Sanierungsarbeiten (45453100), Elektrische Installationen (45310000), Mechanische Installationen (45350000).

BauarbeitenSanierungElektrische Installationen

Sede

Kildare, Irland

Periodo di Servizio

6 Monate

Valore Massimo

600.000 €

Scadenza

11.08.202610:00

7

Giorni

Conference Room Plunkett Mess DFTC Curragh Camp

Irish Defence Forces_1144

Bauarbeiten im Conference Room Plunkett Mess, DFTC Curragh Camp, Co. Kildare. Dazu gehören: 45210000 Baubauarbeiten, 44221000 Fenster, Türen und verwandte Artikel, 45442100 Malerarbeiten, 45453100 Sanierungsarbeiten, 45310000 Elektroinstallationen, 45350000 Mechanische Installationen.

BauarbeitenSanierungElektroinstallation

Sede

Ireland

Periodo di Servizio

6 Months

Scadenza

10.08.202610:00

6

Giorni

Internal alterations, cabin lift, landing, internal fire doors, glazed screen, mechanical and electrical at Ballyconnell Community Centre, Ballyconnell, Co.Cavan Eircode H14 AY24

Ballyconnell Community Centre

Internal alterations, form new youth hub on first floor, cabin lift, landing, internal fire doors, glazed screen, sliding partition wall, floor finishes, fire alarm upgrade, mechanical and electrical installation at Ballyconnell Community Centre

RefurbishmentBauarbeitenMechanical

Sede

Ballyconnell, Irland

Periodo di Servizio

2 Months

Scadenza

05.08.202615:30

2

Giorni

Refurbishment of Cottage No.16 (Mulligan’s Cottage) in Killarney National Park

Department of Housing Local Government and Heritage

Full architectural/mechanical/electrical refurbishment of Cottage No.16 at Muckross, on the N71, Killarney Kenmare route. Competent building contractors with experience in restoration of old buildings of historical and architectural merit are invited.

RefurbishmentBuilding ConstructionRestoration

Sede

Killarney, Irland

Periodo di Servizio

12 Months

Scadenza

12.08.202610:00

8

Giorni

Fire Remediation Works at Belarmine, Dublin 18

Clúid Housing Association

Installation of fire-stopping systems at service penetrations and wall/floor junctions. Replacement or upgrade of fire-rated doors, closers, and seals to comply with TGD-B. Retrofitting of cavity barriers around gas flues and at every floor level. Building a bin store in the basement with a ventilation system. Fire alarm cable rerouting and improvements to service risers and shafts. Sealing of socket/switch boxes within fire-rated partitions. General improvement of compartmentation and passive fire protection measures.

Fire safetyBuilding installationFireproofing

Sede

Dublin, Ireland

Periodo di Servizio

5 Months

Valore Massimo

1.600.000 €

Scadenza

07.08.202615:00

4

Giorni

Gare Correlate in Edilizia

Scopri altre opportunità nello stesso settore

Construction of a new Hospital Entrance at the National Orthopaedic Hospital Cappagh

Dublin, Ireland

ConstructionHospitalEntrance

Scadenza

28.08.2026

24

Giorni

The Supply of Building Materials, Fixing and Components

Dublin, Irland

BaumaterialienBefestigungselementeKomponenten

Scadenza

04.09.2026

31

Giorni

National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Lift (Vertical Transport)

Dublin, Irland

AufzuginstallationSozialwohnungRollstuhlzugänglich

Scadenza

10.09.2026

37

Giorni

National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Electrical

Dublin, Irland

ElektrikBauarbeitenInstallation

Scadenza

10.09.2026

37

Giorni

Engineering Technical Consultancy Services for the Thurles Inner Relief Road

Clonmel, Irland

BauingenieurwesenBeratungInfrastruktur

Scadenza

27.08.2026

24

Giorni

Extension, Refurbishment, Heating System Upgrade and Associated Site Works

Ennis, Irland

BauarbeitenSanierungHeizung

Scadenza

02.09.2026

30

Giorni

Call For Tender for Electrical Services Works Term Contract for South East Technological University - Waterford (Ref. TERELE202607)

Waterford, Ireland

Electrical installationMaintenanceRefurbishment

Scadenza

28.08.2026

25

Giorni

National Centre for Research and Remembrance | Phase 3-A Social Housing Works | Reserved Specialist | Mechanical

Dublin, Irland

Mechanische InstallationenGebäudetechnikHeizung

Scadenza

10.09.2026

37

Giorni

FIN-21 - Architectural and Project Management Services

Dublin, Irland

ArchitekturProjektmanagementBüroumbau

Scadenza

28.08.2026

25

Giorni

SCOIL CROINE NATIONAL SCHOOL

Donegal, Irland

EntwässerungSportplatzSanierung

Scadenza

19.08.2026

16

Giorni

Fit out of Roanmore unit in Waterford for Corlann

Waterford, Irland

BauausführungInnenausbauTagesservice

Scadenza

03.09.2026

31

Giorni

IDA Parkmore Biodiversity Enhancement Proje

Oranmore, County Galway, Irland

LandschaftsgestaltungBiodiversitätPflanzung

Scadenza

28.08.2026

25

Giorni

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Scadenza

25.07.2036

3643

Giorni

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Scadenza

04.09.2026

31

Giorni

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Scadenza

20.08.2026

17

Giorni