Találja meg tökéletes szerződését.

Keressen pályázatokat vállalatokon keresztül azonnal

Szakértői Keresés
RE

Reynolds Surveying

Építőipar

Navan, Meath, Írország
GP PracticeGeneral PracticeMedical Card

Egyező pályázatok

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Helyszín

Ireland

Szolgáltatási Időszak

39 Months

Maximális Érték

300.000 €

Határidő

25.08.202614:00

24

Nap

LiDAR and orthoimagery services for National Parks and Wildlife Service (NPWS), Department of Housing, Local Government and Heritage NPWS (DHLGH)

Department of Housing Local Government and Heritage

Bereitstellung von LiDAR- und Orthofotodiensten für den National Parks and Wildlife Service (NPWS) der Department of Housing, Local Government and Heritage, für Zwecke der ökologischen und ingenieurtechnischen Kartierung für eine Reihe von Überwachungs- und Managementprojekten und -programmen.

LiDAROrthofotografieKartierung

Helyszín

Dublin, Irland

Szolgáltatási Időszak

4 Jahre

Maximális Érték

4.600.000 €

Határidő

05.08.202613:00

4

Nap

Asbestos Surveys in PMVT buildings/locations

Peter McVerry Trust_121127

By understanding the volume of asbestos present in properties, PMVT can proactively manage and hold an up to date register of known asbestos within our stock while also giving the ability to put in place appropriate safeguards and plan for future safety works to manage the issue if and when required.

AsbestosSurveyingSafety

Helyszín

Ireland

Szolgáltatási Időszak

48 Months

Határidő

19.08.202615:30

18

Nap

Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme

Tipperary County Council

Identification, design and submission for planning consent of a Flood Relief Scheme, completion of detailed design, and procurement, management and oversight of the construction of the Scheme. Tasks include engineering and environmental consultancy services.

EngineeringEnvironmentalFlood Relief

Helyszín

Ireland

Szolgáltatási Időszak

108 Months

Maximális Érték

3.000.000 €

Határidő

02.09.202610:00

32

Nap

Kapcsolódó Pályázatok a(z) Építőipar ágazatban

Fedezzen fel más lehetőségeket ugyanabban az ágazatban

SCOIL CROINE NATIONAL SCHOOL

Donegal, Irland

EntwässerungSportplatzSanierung

Határidő

19.08.2026

18

Nap

Fit out of Roanmore unit in Waterford for Corlann

Waterford, Irland

BauausführungInnenausbauTagesservice

Határidő

03.09.2026

33

Nap

FIN-21 - Architectural and Project Management Services

Dublin, Irland

ArchitekturProjektmanagementBüroumbau

Határidő

28.08.2026

27

Nap

IDA Parkmore Biodiversity Enhancement Proje

Oranmore, County Galway, Irland

LandschaftsgestaltungBiodiversitätPflanzung

Határidő

28.08.2026

27

Nap

Fire Compliance Works to 82 number apartments over two phases at Rochdale, Claremount Avenue, Honey Park, Dun Laoghaire, Dublin.

Dublin, Irland

FeuerwehrBauarbeitenMehrfamilienhaus

Határidő

01.09.2026

31

Nap

Works Contractor PSCS and PSDP - Contractor Design and Build (PWCF2) - Development of 36no. homes and community centre at Mill Lane, Leixlip, Co. Kildare

Leixlip, Irland

BauarbeitenWohnungsbauGemeinschaftszentrum

Határidő

04.09.2026

34

Nap

Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme

Dublin, Irland

BauarbeitenRadinfrastrukturFußwege

Határidő

27.08.2026

26

Nap

Enabling works for new glasshouse at Glenveagh National Park

West, Irland

BauarbeitenNeubauSanierung

Határidő

03.09.2026

33

Nap

26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

Ireland

Marine constructionGas infrastructureEPC works

Határidő

25.07.2036

3646

Nap

Arranmore/Árainn Mhór Slipway Repairs 2026 - Donegal County Council

Arranmore Island, Ireland

Pier constructionSlipway repairsMarine works

Határidő

20.08.2026

19

Nap

Daisy Building Enhancement carried out by Donegal County Council

Carndonagh, Irland

BauarbeitenSanierungZäune

Határidő

28.08.2026

27

Nap

DCC - Home Building Programme Contractor Multi Party Framework Agreement in 2 Lots A and B

Dublin, Ireland

Housing ConstructionDesign and BuildSocial Housing

Határidő

26.08.2026

25

Nap

Design, Construction and Delivery of Cherry Orchard (Affordable for Sale) Housing Development (Pro405)

Dublin, Irland

BauWohnungsbauNeubau

Határidő

25.08.2026

24

Nap

Construction of SEN Extension to Clarecastle National School

Clarecastle, Irland

SchulbauSEN-ErweiterungNeubau

Határidő

28.08.2026

27

Nap

Ballycoolin Bus Depot Design and Build

Dublin, Ireland

Bus DepotConstructionDesign and Build

Határidő

28.08.2026

27

Nap