Pronađite savršen natječaj za sebe.

Pretražite tvrtke ili natječaje.

MC

MCP On-Tray ®

Proizvodnja

Island

MCP On-Tray ® posluje u sektoru Proizvodnja.

Natječaji za Proizvodnja

Podudaranja po djelatnosti

Ovi natječaji su usklađeni na temelju djelatnosti i zemlje tvrtke. Korisnici s aktivnim FREE računom mogu preuzeti ovu tvrtku i dodati podatke koji nedostaju za preciznije rezultate. Pogledajte pojedinosti planova

●Landsvirkjun

Design, manufacture, supply, install and commission the rehabilitation and upgrade of six main inlet butterfly valves at Búrfell 1 hydropower plant. Replace the existing valves to ensure reliable, leak-free operation and optimal efficiency.

main inlet valvesbutterfly valveshydropowervalve rehabilitationcommissioning

Lokacija

Búrfell, Iceland

Razdoblje Usluge

10. 06. 2027. - 30. 09. 2031.

Rok

09.12.2026 • 12:00

14

Dana

●Faxaflóahafnir sf.

Manufacture and install 3–5 concrete pontoons and moorings at Reykjavík Harbour, in accordance with the technical specifications.

concrete pontoonsmooringsmarina systeminstallation

Lokacija

Reykjavík, Iceland

Razdoblje Usluge

08. 12. 2026. - 01. 06. 2028.

Rok

03.12.2026 • 14:00

8

Dana

●Isavia ohf

Lieferung von wasserbasierten und lösungsmittelbasierten Farben für Flugplätze sowie retroreflektierenden Perlen im Rahmen eines dynamischen Beschaffungssystems.

Flugplatzfarberetroreflektierende Perlendynamisches BeschaffungssystemFarbenLieferanten

Lokacija

Höfuðborgarsvæði, Ísland

Razdoblje Usluge

bis 31. 01. 2030.

Rok

01.01.2039 • 12:00

4420

Dana

●Isavia ohf

Lieferung von wasserbasierten und lösungsmittelbasierten Farben für Flugplätze sowie retroreflektierenden Perlen.

Flugplatzfarberetroreflektierende Perlendynamisches Beschaffungssystemwasserbasierte Farbelösungsmittelbasierte Farbe

Lokacija

Höfuðborgarsvæði, Ísland

Razdoblje Usluge

Bis 31. 01. 2030.

Rok

01.01.2039 • 12:00

4420

Dana

Povezani Natječaji u Proizvodnja

Otkrijte druge prilike u istom sektoru

Flow sensors in wastewater

Reykjavik, Iceland

flow sensorslevel sensorswastewater

Rok

08.01.2027

44

Dana

Main Inlet Valves at Burfell Power Station

Búrfell, Iceland

main inlet valvesbutterfly valveshydropowervalve rehabilitationcommissioning

Rok

09.12.2026

14

Dana

Steel Tubes and Fittings for ÞG-19

Iceland

steel tubesmanufacturingdeliverysteel fittingstees…

Rok

17.12.2026

22

Dana

12kV Ring Main Unit (RMU) switchgear

Reykjavík, Iceland

Rok

20.01.2027

56

Dana

Steel Tubes and Fittings for ÞG-19

Iceland

steel tubesmanufacturingdeliverysteel fittingstees…

Rok

17.12.2026

22

Dana

Floating Pontoon Marina System - Skarfagarður

Reykjavík, Iceland

concrete pontoonsmooringsmarina systeminstallation

Rok

03.12.2026

8

Dana