Pronađite svoj savršeni ugovor.
Pretražujte natječaje putem tvrtki trenutno
Mann Engineering
Proizvodnja
Mann Engineering posluje u sektoru Proizvodnja.
Natječaji za Proizvodnja
Podudaranja po djelatnosti
Ovi natječaji su usklađeni na temelju djelatnosti i zemlje tvrtke. Premium korisnici mogu preuzeti ovu tvrtku i dodati podatke koji nedostaju za preciznije rezultate. See plan details
ATV Vehicle
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
Glenveagh National Park require a 8x8 wheeled amphibious vehicle to allow a means of access to remote areas that are difficult to access, and providing a safe means of travel for staff working in those areas. The vehicles must have a reasonable payload and provide low ground pressure to reduce impact on ground flora. Depending on funding available two vehicles may be required
Lokacija
Border, Ireland
Razdoblje Usluge
6 Months
Vrijednost ugovora
50.000 €
Rok
06.11.2026 • 12:00
8
Dana
●Bus Eireann/Irish Bus
Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).
Lokacija
Dublin, Ireland
Razdoblje Usluge
not less than 5 years
Rok
29.08.2027 • 15:00
304
Dana
HSE 21101 Dynamic Purchasing System (DPS) Invitation for Enteral Nutrition Products and Related Devices
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Supply of Enteral Nutrition Products and Related Devices, including pumps, nutritional pumps, special nutritional products, medical consumables, administration sets, and miscellaneous medical devices and products.
Lokacija
Dublin, Ireland
Razdoblje Usluge
02/09/2026 – 02/09/2033
Vrijednost ugovora
210.000.000 €
Rok
02.09.2033 • 15:00
2500
Dana
●Gas Networks Ireland
Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).
Lokacija
Ireland
Razdoblje Usluge
28. 07. 2026. - 27. 07. 2036.
Rok
25.07.2036 • 12:00
3557
Dana
●Bus Eireann/Irish Bus
Anschaffung von emissionsarmen Coaches und Schulbussen sowie, wo möglich, emissionsfreien Coaches mit geringem Umweltausdruck im Einklang mit der neuesten EURO VI-Verordnung. Die Fahrzeuge müssen die Leitlinien der EPA für Straßenverkehrsfahrzeuge und die europäischen Gemeinschaftsbestimmungen über saubere und energieeffiziente Straßenverkehrsfahrzeuge einhalten.
Lokacija
Dublin, Irland
Razdoblje Usluge
60 Monate
Vrijednost ugovora
720.000.000 €
Rok
31.03.2033 • 12:00
2345
Dana
Dynamic Purchasing System (DPS) for Course Consumables for use in Donegal Education and Training Board Training Centres and Schools
●Donegal Education and Training Board_368
●Donegal Education and Training Board_368
Dynamic Purchasing System (DPS) for Course Consumables for use in Training Centres and Schools
Lokacija
Ireland
Razdoblje Usluge
26. 06. 2026. - 26. 06. 2031.
Vrijednost ugovora
10.000.000 €
Rok
26.06.2031 • 14:00
1701
Dana
25/061 - Qualification System for Boiler Package Units
●Gas Networks Ireland
●Gas Networks Ireland
Design, Herstellung, Montage, Lieferung und Inbetriebnahme kompletter Paketkesselanlagen (PBU) mit natürlichen Gas-betriebenen Kesseln, natürlichen Gas-betriebenen Generatoren, zugehörigen LPHW-Systemen, Steuerungs- und Automatisierungssystemen, Instrumentierung, Dokumentation, FAT/SAT sowie Inbetriebnahmesupport. Dazu gehört der Kauf von Wärmeübertragern als Teil eines integrierten natürlichen Gas-Vorwärmesystems. GNI kann alle oder Teile der PBU und Wärmeübertrager beschaffen. Während des Rahmenzeitraums können zusätzliche Dienstleistungen, Arbeiten und Lieferungen erforderlich sein, z. B. die Bereitstellung von Kesseln und allen Nebenanlagen zur sicheren und effizienten Betriebsführung der PBU. GNI behält sich das Recht vor, Prüfungen (einschließlich Lieferantenqualitätsprüfungen) durchzuführen.
Lokacija
Irland
Razdoblje Usluge
120 Monate
Rok
15.05.2036 • 12:00
3486
Dana
9301 Qualification System for Professional Services
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Provision of strategic/expert advisory services, professional services secondments, project management deliverables, planning advice, alternative design options, and other consultancy services across multiple fields including architectural, engineering, environmental, financial, HR, and safety consultancy.
Lokacija
Irland
Razdoblje Usluge
02. 03. 2026. - 03. 03. 2031.
Rok
01.03.2031 • 12:00
1584
Dana
●Bus Eireann/Irish Bus
Supply of, Repair and Maintenance for Body Parts; Supply of Parts, Repair and Maintenance of Chassis; Supply of Parts, Repair and Maintenance of Body Panels and Structure; Supply of Parts, Repair and Maintenance of Glazing; Supply of Parts, Repair and Maintenance of Heating, Ventilation and Air Conditioning Systems; Supply of, Repair and Maintenance of Hoses and Pipes; Supply of, Repair and Maintenance of Exterior and Interior Fittings; Supply of, Repair and Maintenance of Ancillary Onboard equipment; Supply of Wheel Rims; Supply of Parts, Repairs and Maintenance of Braking Systems; Supply of Suspension and Steering Systems; Supply of, Repair and Maintenance for General Driveline Systems; Supply of Filters; Supply of, Repair and Maintenance of Electrical and Electronic Components.
Lokacija
Dublin, Ireland
Razdoblje Usluge
60 Months
Rok
30.04.2033 • 12:00
2375
Dana
●Bus Eireann/Irish Bus
Bus Éireann beabsichtigt, emissionsarme Reisebusse und Schulbusse sowie, wo möglich, null-Emissions-Reisebusse mit geringem Umweltausstoß gemäß der neuesten EURO VI-Verordnung zu beschaffen. Die Fahrzeuge werden den Leitlinien der EPA für Straßenverkehrsfahrzeuge und den Europäischen Gemeinschafts-Verordnungen über saubere und energieeffiziente Straßenverkehrsfahrzeuge (Änderungs-)Verordnung 2021 entsprechen.
Lokacija
Dublin, Irland
Razdoblje Usluge
60 Monate
Vrijednost ugovora
480.000.000 €
Rok
31.05.2033 • 12:00
2406
Dana
Povezani Natječaji u Proizvodnja
Otkrijte druge prilike u istom sektoru