Aimsigh do chonradh foirfe.

Cuardaigh tairiscintí trí chuideachtaί go láithreach

VA

Valid8 Engineering

Tógáil

Éire

Tá Valid8 Engineering ag feidhmiú san earnáil Tógáil.

Tairiscintí do Tógáil

Meaitseálacha ar leibhéal tionscail

Tá na tairiscintí seo meaitseáilte bunaithe ar thionscal agus tír na cuideachta. Is féidir le húsáideoirí Premium an chuideachta seo a éileamh agus na sonraí atá in easnamh a chur leis chun meaitseálacha níos cruinne a aimsiú. See plan details

●Clare County Council

Main Works SAQ for N67/N85 Inner Relief Road Ennistymon (Blakes Corner). Main nature of the contract: Works. Includes site preparation work, bridge construction, bridge sections, structures of bridges, and road bridge construction work.

ConstructionBridgeCivil Engineering

Suíomh

Ennistymon, Ireland

Tréimhse Seirbhíse

18 Months

Luach an chonartha

€30,000,000

Spriocdháta

23.10.2026 • 17:00

3

Laethanta

●Iarnród Eireann-Irish Rail

Supply and delivery of Various Steel Sections and Plates.

SteelSectionsPlates

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

96 Months

Luach an chonartha

€2,000,000

Spriocdháta

21.10.2026 • 12:00

20

Uaireanta

Apprentice Expansion Project

●Munster Technological University.

The construction of a new two storey extension to Block A, with links back to the existing building. Upgrade of the existing Plastering Workshop to facilitate new Pipefitting Workshop, phased delivery required to maintain curriculum, Upgrade Works to internal Shared specialistspace Associated M and E Works.

Building installation workElectrical installation workHeating

Suíomh

Tralee, Ireland

Tréimhse Seirbhíse

14 Months

Spriocdháta

23.10.2026 • 12:00

2

Laethanta

Construction Works/Services for the upgrade of Finner Camp Dining Hall to include Water Services Upgrade at Finner Camp, Ballyshannon, Co. Donegal. This includes engineering works and construction works, overhaul and refurbishment work, construction work for military buildings and installations, and installation of fire hydrants.

ConstructionEngineering worksWater Services

Suíomh

Ballyshannon, Co. Donegal, Ireland

Tréimhse Seirbhíse

12 Months

Spriocdháta

21.10.2026 • 12:00

20

Uaireanta

●The Irish Air Navigation Service

Design and build of portable/modular accommodation for server equipment at Cork Airport control Tower

prefabricated buildingsmodular accommodationserver equipment

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

12 Months

Luach an chonartha

€200,000

Spriocdháta

23.10.2026 • 12:00

2

Laethanta

Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).

Electric Vehicle ChargersInstallationCommissioning

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

not less than 5 years

Spriocdháta

29.08.2027 • 15:00

312

Laethanta

●Wexford County Council

Compliance (and occasional investigative) sampling and analysis of drinking water for both 'check' and 'audit' parameters as set down by S.I. No. 99/2023 - European Union (Drinking Water) Regulations 2023. Occasional investigative sampling including duplicate samples (coliforms, e.coli free, total chlorine). Reporting of results to Wexford County Council. Accredited analysis required for compliance samples (except free and total chlorine, odour, taste, and Dalapon).

water samplingdrinking water analysiscompliance monitoring

Suíomh

Wexford, Ireland

Tréimhse Seirbhíse

2 Years

Spriocdháta

21.10.2026 • 16:00

1

Lá

●Gas Networks Ireland

Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities.

LNGProcurementContract Management

Suíomh

Ireland

Tréimhse Seirbhíse

180 Days

Spriocdháta

05.05.2036 • 12:00

3484

Laethanta

Engineering, procurement, and construction works and services to complete infrastructure assets, including but not limited to: marine jetty structure, marine piling, floating pontoon, mooring & breasting dolphins, fender, trestle, HP gas unloading systems, on-shore gas receiving facility, utility systems, metering, odourisation, venting, pipeline and pig traps, high pressure gas grid connection, connection to existing natural gas network, utility connections for power, water and telecom, integration with FSRU, onshore terminal systems, pre commissioning and commissioning services, and management of nominated subcontractor(s).

Marine constructionGas infrastructureEPC works

Suíomh

Ireland

Tréimhse Seirbhíse

28/07/2026 - 27/07/2036

Spriocdháta

25.07.2036 • 12:00

3565

Laethanta

9884 Qualification System for Surveys

●Iarnród Eireann-Irish Rail

Vergabe eines Qualifikationssystems (QS) für intrusive Untersuchungsleistungen zur Überwachung der Eisenbahninfrastruktur, Küstengebiete und Gebäudeanlagen von Iarnród Éireann.

Intrusive SurveysEisenbahninfrastrukturBodenuntersuchung

Suíomh

Irland

Tréimhse Seirbhíse

7 Jahre

Spriocdháta

21.08.2033 • 12:00

2496

Laethanta

Tairiscintí Gaolmhara in Tógáil

Aimsigh deiseanna eile san earnáil chéanna

CfT for fitout and renovations of Day Services Hub - Tallaght Cross

Tallaght Cross, Tallaght, Dublin, Ireland

Spriocdháta

24.11.2026

35

Laethanta

MCC Panel Upgrade for Carick on Suir Flood Relief Scheme

Tipperary, Ireland

Spriocdháta

05.11.2026

16

Laethanta

Baltinglass Town Centre Refurbishment Project Phase 1A

Baltinglass, County Wicklow, Ireland

Spriocdháta

19.11.2026

29

Laethanta

New tender for an extension to Causeway Comprehensive School Kerry

County Kerry, Ireland

Spriocdháta

16.11.2026

26

Laethanta

The Design and Construction of Stapolin Square Phase 2 Housing Development (Pro421)

Baldoyle, Dublin 13, Ireland

Spriocdháta

16.11.2026

27

Laethanta

Multi-Party Framework Agreement for Civil Engineering Works at Dublin Port

Dublin, Ireland

Civil engineeringQuay wallsDredging

Spriocdháta

12.11.2026

22

Laethanta