Aimsigh do chonradh foirfe.

Cuardaigh cuideachtaí nó tairiscintí.

ST

Structure Electrical Services Ltd

Tógáil

Tá Structure Electrical Services Ltd ag feidhmiú san earnáil Tógáil.

Tairiscintí do Tógáil

Meaitseálacha ar leibhéal tionscail

Tá na tairiscintí seo meaitseáilte bunaithe ar thionscal agus tír na cuideachta. Is féidir le húsáideoirí a bhfuil cuntas gníomhach FREE acu an chuideachta seo a éileamh agus na sonraí atá in easnamh a chur leis chun meaitseálacha níos cruinne a aimsiú. Féach sonraí na bpleananna

●Transport Infrastructure Ireland (TII)

Design and build the 4 km Luas Green Line extension from Finglas to Dublin city centre, including track, four stops, stabling works, a 350-space Park and Ride, bridges, roads, utilities, power, signalling and other rail systems. Coordinate interfaces and stakeholders, integrate systems, and complete testing and commissioning.

Luas Finglaslight railtracksystems integrationPark and Ride

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

54 months

Luach an chonartha

€250,000,000

Spriocdháta

14.12.2026 • 11:00

23

Laethanta

Provide multidisciplinary design and consulting services for Claureen Enabling Road Phase 2, including civil, structural, mechanical and electrical engineering, urban design, quantity surveying and PSDP. The road will enable an initial development of more than 200 homes and support potential further housing development.

Suíomh

Ennis, County Clare, Ireland

Tréimhse Seirbhíse

43 months

Luach an chonartha

€225,000

Spriocdháta

30.11.2026 • 17:00

10

Laethanta

●Horse Racing Ireland (HRI)

Supply and deliver new starting stalls for HRI racecourses and eligible affiliated or associated bodies. The initial anticipated requirement is two 16-bay starting stalls for Tipperary Racecourse; the framework may cover requirements at up to 20 racecourses in the Republic of Ireland.

Suíomh

The Curragh, County Kildare, Ireland

Tréimhse Seirbhíse

4 years

Luach an chonartha

€1,500,000

Spriocdháta

27.11.2026 • 15:00

7

Laethanta

Construction of Single Storey Extension to St. Edwards NS, Clarion Rd, Sligo

●St Edward's National School (Ballytivnan), Sligo

Build a single-storey extension to the north side of St Edward’s National School, including one classroom and four S.E.T. rooms. Connect to existing site services, carry out works to the Irish Water drop manhole and complete associated site works.

Suíomh

Ballytivnan, Sligo, Ireland

Tréimhse Seirbhíse

12 months

Luach an chonartha

€775,000

Spriocdháta

23.11.2026 • 16:00

3

Laethanta

●Health Service Executive (HSE)

Conduct a geothermal feasibility study and Thermal Response Test at University Hospital Galway to assess supplying heating and cooling to a proposed new building. Evaluate shallow horizontal loops, deep vertical loops and aquifer-based water-to-water systems.

Suíomh

Galway, Ireland

Luach an chonartha

€60,000

Spriocdháta

27.11.2026 • 12:00

7

Laethanta

●Kilkenny County Council_1185

Provide a multidisciplinary consultancy team to progress preliminary and detailed design, statutory planning, enabling works and procurement, construction, and handover for the scheme. Fulfil the PSDP role and procure specialist services needed to complete the project.

Suíomh

Kilkenny, Ireland

Tréimhse Seirbhíse

44 months

Luach an chonartha

€5,000,000

Spriocdháta

24.11.2026 • 12:00

4

Laethanta

●Office of Public Works (OPW)

Retrofit an automatic high-pressure water mist system across both basement car parking levels at Walter Scott House, Military Road, Dublin 8.

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

6 months

Spriocdháta

23.11.2026 • 12:00

3

Laethanta

●National Oil Reserves Agency DAC

Provide engineering consultancy for NORA’s additional loading rack and dual-purpose kerosene storage tank.

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

24 months

Luach an chonartha

€300,000

Spriocdháta

16.12.2026 • 23:45

26

Laethanta

Provide multidisciplinary, landscape-architect-led consultancy for a circa 18-acre public open space at Lakeside–Highfield, Dara Park, Newbridge. Prepare the masterplan, secure Part 8 planning approval, develop detailed design and tender documentation, and provide construction-stage services for phased development.

Suíomh

Newbridge, County Kildare, Ireland

Tréimhse Seirbhíse

48 months

Luach an chonartha

€1,000,000

Spriocdháta

02.12.2026 • 16:00

12

Laethanta

●Mayo County Council_1127

Restore and adapt the former two-storey St Joseph’s Convent school as a public library operating the My Open Library model and a community hub. Works include internal alterations, a new two-storey glazed entrance extension with lobby and lift, outdoor play and amphitheatre facilities, and associated site development.

Suíomh

Ballyhaunis, County Mayo, Ireland

Tréimhse Seirbhíse

13 months

Luach an chonartha

€12,345

Spriocdháta

11.12.2026 • 17:00

21

Laethanta

Tairiscintí Gaolmhara in Tógáil

Aimsigh deiseanna eile san earnáil chéanna

WCCC26 651 Social Housing Apartment Development at The Glen, Waterford

Waterford, Ireland

social housingapartment developmentrefurbishmentdemolitionsite works

Spriocdháta

16.12.2026

26

Laethanta

Architect-Led Design Team Services for the Little Seeds Crèche Extension and Masterplan Strategy in Moyross, Co. Limerick

Moyross, County Limerick, Ireland

architect-led design teamfeasibility masterplancrèche extensionstatutory approvalsconstruction-stage delivery

Spriocdháta

14.01.2027

55

Laethanta

National Centre for Research and Remembrance | Phase 3-B Main Works | Main Contractor and Project Supervisor Construction Stage (PSCS)

Dublin, Ireland

main worksarchival repositoryconservationeducational facilityPSCS

Spriocdháta

17.12.2026

27

Laethanta

9843 Design and Build Capacity Enhancement Works at Connolly Station

Dublin, Ireland

Connolly Stationcapacity enhancementdesign and buildrailway worksstation refurbishment

Spriocdháta

26.11.2026

6

Laethanta

Renovation and conversion of a commercial unit at No.62 Barrack Street, Castlecomer

Castlecomer, County Kilkenny, Ireland

renovationconversionhousing unitdemolitionsite works

Spriocdháta

11.12.2026

21

Laethanta

Clúid Development Agreement with Stage Payments - Residential Developments in Co. Dublin

County Dublin, Ireland

residential developmentfull planning permissionstage payments

Spriocdháta

14.12.2026

24

Laethanta

The Design and Build of 30 No. Apartment units including all necessary site development works at Mary Street, Limerick City.

Limerick City, Ireland

30 apartmentsMary Streetsite developmentarchaeological works

Spriocdháta

14.12.2026

24

Laethanta

Gas Boiler heating system

County Mayo, Ireland

Spriocdháta

17.12.2026

27

Laethanta

Climate Action and Windows Project at St Joseph’s College, Lucan, Co. Dublin

Lucan, County Dublin, Ireland

Spriocdháta

04.12.2026

14

Laethanta

Ground Penetrating Radar Survey at Abbey Bridge

Limerick, Ireland

Ground Penetrating RadarAbbey Bridgeduct layoutpost-tensioned main spanbridge deck

Spriocdháta

04.12.2026

14

Laethanta