Aimsigh do chonradh foirfe.
Cuardaigh tairiscintí trí chuideachtaί go láithreach
Tá Solearth ag feidhmiú san earnáil Tógáil. Suíomh: Cork.
Táirgí agus seirbhísí
- Architectural services for buildings
- Feasibility study, advisory service, analysis
- Energy and related services
- Engineering design services for mechanical and electrical installations for buildings
- Surveying services
- Construction project management services
- Technical inspection services
- Design support services
Tairiscintí Meaitseáilte
Multi Operator Framework for Project Managers with Design/Technical Consultants for Educational Accommodation
●Department of Education and Youth
●Department of Education and Youth
The Project Management Services that are being procured under this competition are for the organising, overseeing and management, procurement and delivery of SEN refurbishing within existing school buildings and/or the provision of modular accommodation for SEN and/or mainstream classroom and ancillary space with associated site works. The services will include both the management and the delivery of the services. The successful Project Management Firm shall receive a brief from the Department of Education and Youth to refurbish existing spaces within a school for a new purpose or to deliver a new accommodation on the grounds of an existing school or a combination of both. The required Project Management service will comprise of three parts A, B and C. Part A will consist of the successful Project management firm and their Multi-Disciplinary Design Team (MDDT) visiting the school to assess the most economically advantageous location to the deliver the brief while identify the capacity of existing services identify risks and preparing an order of magnitude costing. Part B is only applicable to projects where the brief requires refurbishment of existing school spaces by contractors using the “Framework Agreement for Term Maintenance, Refurbishment and Upgrade Construction Works to Educational Facilities” (PW CF-11) which will be referred to as the “Refurbishing Framework” in the remainder of this document. As an Employer led design project the PM and their MDDT will develop the detailed design drawings and supervise the contractor during construction Part C will only be applicable to projects where the project brief requires additional accommodation to be delivered via the Departments of Education and Youth’s “Multi-Operator Framework Agreement for the Provision of MMC Pre-Manufactured Modular 3D Volumetric Educational Accommodation” (PW CF-02) Which will be referred to as the “Modular Framework” in the remainder of this document. As a design build contract the PM’s Multidisciplinary Design Team will become Technical Designers as they develop the preliminary brief design that the contractors will take to complete the detailed design and construct.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
48 Months
Luach an chonartha
€100,000,000
Spriocdháta
02.11.2026 • 16:00
27
Laethanta
●Health Service Executive (HSE)
MULTI-PARTY FRAMEWORK AGREEMENT FOR HSE DESIGN TEAM SERVICES FRAMEWORK 2024 – FRAMEWORK 02: ACUTE HEALTHCARE CAPITAL WORKS – PROJECT VALUE €1M -€15M EXCL. VAT. This framework will include the following design team disciplines (Lots): Lot 1: Architect(AR) as Principal Service Provider with the following Specialists domestic sub-consultants, or in-house specialisms: a. Planner (PL), b. Project Supervisor Design Process (PSDP), c. Fire Safety Consultant (FSC) and d. BIM Information Manager(BIM). The Health Services Executive (HSE) invites expressions of interest, under the Restricted Procedure, from suitably qualified services providers for the provision of design team services (including Specialist Skills Providers) per the above Lot listing for which it is proposed to establish a Multi-Party Framework Agreement for each Lot type to award call-off contracts for Acute Healthcare Capital Works – project value €1M-€15M excl. VAT within HSE North West Area Please note that the INITIAL project forming Framework 02 for this regional / sub¬regional office NW West Area will be: Proposed Microbiology Lab incorporating ancillary site works, plus enabling work to divert existing services at Sligo University Hospital.
Suíomh
Sligo, Ireland
Tréimhse Seirbhíse
48 Months
Luach an chonartha
€4,200,000,000
Spriocdháta
30.10.2026 • 12:00
24
Laethanta
●Dublin City Council
The Contracting Authority, Dublin City Council, intends to establish a Single Party Framework Agreement with a Integrated Design Team to deliver planning, engineering, environmental, stakeholder engagement and other specialist consultancy services for the Clontarf Flood Defence and Public Realm Project (CFDPRP). The Project is located along the Clontarf waterfront in Dublin and encompasses a highly sensitive coastal environment adjoining designated European sites, including Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The Project has been initiated to address existing and future coastal and surface water flood risks while delivering a coordinated programme of public realm enhancement, active travel improvements and environmental benefits. The scheme shall be developed through an integrated design approach that balances flood resilience, climate adaptation, biodiversity, heritage, placemaking, sustainable mobility, environmental protection and stakeholder aspirations. The initial call-off contract under the Framework will require the successful Applicant to undertake all services necessary to develop the Project from commencement through option identification, scheme development, environmental assessment, statutory consent processes and detailed design. This shall include the preparation of all technical studies, surveys, modelling, assessments, reports, designs and application documentation required to secure the necessary approvals and to progress the Project to a stage suitable for procurement and construction. The Framework Agreement may subsequently be utilised by the Contracting Authority to procure additional related services, including procurement support, construction-stage services, post-consent services and other specialist consultancy services associated with the delivery of the Project. The successful Applicant shall be required to develop a fully integrated and coordinated scheme that delivers flood protection, surface water management, active travel and public realm objectives within a single coherent design solution that is environmentally sensitive, climate resilient and appropriate to the strategic importance of the Clontarf waterfront.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
7 Years
Luach an chonartha
€7,500,000
Spriocdháta
30.10.2026 • 12:00
24
Laethanta
Killeen and Feenune Bridge Barrier Mitigation Project
●Inland Fisheries Ireland
●Inland Fisheries Ireland
Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of two Barrier Mitigation Projects: Killeen Bridge and Feenune Bridge near Louisburgh in Co. Mayo, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environmental and planning services required to progress the project through feasibility, option selection, and statutory consent stages in accordance with the Planning and Development Acts 2000–2023, the Capital Works Management Framework, and Infrastructure Guidelines 2023. The Barrier Mitigation Projects aim to mitigate the impacts of the identified barriers on fish passage and restore more natural river processes along the associated rivers. The commission forms a specific action under Ireland’s Water Action Plan 2024 and supports implementation of the National Barrier Mitigation Programme to deliver improved ecological status under the EU Water Framework Directive. The Consultant will act as the Designer, Project Supervisor Design Process during Phases 1 to 3 of the project and carry out all related necessary duties.
Suíomh
Galway, Mayo, Ireland
Tréimhse Seirbhíse
10 Months
Luach an chonartha
€75,000
Spriocdháta
21.10.2026 • 12:00
15
Laethanta
Architectural and PSDP Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Architectural and PSDP professional services to support appointed design teams in delivering various construction projects across ESB's Dublin region in the Republic of Ireland.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
7 Years
Luach an chonartha
€19,965,000
Spriocdháta
29.10.2026 • 12:00
23
Laethanta
HSE ESTATES SW - Ballyseedy Refurbishment and New Build Disability Respite Housing
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Architect Lead Integrated Design Team
Suíomh
Kildare, Ireland
Tréimhse Seirbhíse
36 Months
Spriocdháta
23.10.2026 • 12:00
17
Laethanta
Multidisciplinary Services for Castletroy Link Road, Limerick Scheme - NTA Stages 5-7
●Limerick City and County Council_103432
●Limerick City and County Council_103432
Construct a new distributor road of approximately 680m in length with a cross-section consisting of 9.7m wide carriageway (consisting of 2 x 3.1m traffic lanes) including a 3.5m wide bus lane, footpaths, segregated cycletrack, planted verges with 1 in 2 road embankment side slopes. Upgrading of both the Schoolhouse Road/Golf Links Road junction and the Kilbane roundabout to a signalised protected junction arrangement.
Suíomh
Limerick, Ireland
Tréimhse Seirbhíse
40 Months
Luach an chonartha
€1,500,000
Spriocdháta
23.10.2026 • 12:00
17
Laethanta
WCCC26 295 Tender For Colligan Flood Study
●Waterford City and County Council_103683
●Waterford City and County Council_103683
Tender for Consultants for Flood Study and associated works for Colligan
Suíomh
Colligan, Co Waterford, Ireland
Tréimhse Seirbhíse
9 Months
Luach an chonartha
€80,000
Spriocdháta
30.10.2026 • 15:00
24
Laethanta
●Dublin City Council
Architect led Integrated design team services for Dublin City Council to deliver the fire Safety remediation of buildings of a variety of uses under Dublin City Council ownership or partial ownership. The single party framework agreement will be established on foot of an initial contract for whole stages (Stage (i) Preliminary – Stage (v) Handover of Works) delivery of professional services in relation to the fire remediation works at a 7 storey mixed use development in Dublin City Centre, consisting of 62 residential apartments, retail units, podium car-park and approximately 3,000sqm of community facilities.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
4 Years
Luach an chonartha
€7,000,000
Spriocdháta
19.10.2026 • 12:00
13
Laethanta
Emergency Works AVC Roof Repair Wicklow
●Kildare and Wicklow Education and Training Board
●Kildare and Wicklow Education and Training Board
Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.
Suíomh
Rathdrum, Co. Wicklow, Ireland
Tréimhse Seirbhíse
18 Months
Luach an chonartha
€57,000
Spriocdháta
15.10.2026 • 23:45
9
Laethanta
Tairiscintí Gaolmhara in Tógáil
Aimsigh deiseanna eile san earnáil chéanna