Aimsigh do chonradh foirfe.
Cuardaigh tairiscintí trí chuideachtaί go láithreach
Seabren Developments
Tógáil
Tá Seabren Developments ag feidhmiú san earnáil Tógáil.
Tairiscintí do Tógáil
Meaitseálacha ar leibhéal tionscail
Tá na tairiscintí seo meaitseáilte bunaithe ar thionscal agus tír na cuideachta. Is féidir le húsáideoirí Premium an chuideachta seo a éileamh agus na sonraí atá in easnamh a chur leis chun meaitseálacha níos cruinne a aimsiú. See plan details
Works Contractors Notice
●Department of Education and Youth
●Department of Education and Youth
Call for Tender for the procurement of Works Contractors for mechanical and electrical plantroom works including all associated builder's works and site works to facilitate heat pump installation to 17 school buildings located in five counties namely Kildare, Offaly, Laois, Waterford and Wexford.
Suíomh
Kildare, Ireland
Tréimhse Seirbhíse
9 Months
Luach an chonartha
€43,600,000
Spriocdháta
02.11.2026 • 12:00
2
Laethanta
●Tipperary County Council
Technical services for an Engineering Consultancy led, Multi-Disciplinary Design Team for the Clonmel Link Roads
Suíomh
Clonmel, Ireland
Tréimhse Seirbhíse
44 Months
Luach an chonartha
€900,000
Spriocdháta
06.11.2026 • 14:00
6
Laethanta
●St John of God Community Services clg
The Services comprise Security Services (excluding Static Guarding) and Maintenance Services for Fire Alarm, Emergency Lighting and/or Electronic Security Systems for Saint John of God Community Services regions in Leinster.
Suíomh
Leinster, Ireland
Tréimhse Seirbhíse
6 Years
Luach an chonartha
€3,230,000
Spriocdháta
02.11.2026 • 15:00
2
Laethanta
●St John of God Community Services clg
The Services comprise Security Services (excluding Static Guarding) and Maintenance Services for Fire Alarm, Emergency Lighting and/or Electronic Security Systems for Saint John of God Community Services region in Kerry.
Suíomh
Kerry, Ireland
Tréimhse Seirbhíse
6 Years
Luach an chonartha
€450,000
Spriocdháta
02.11.2026 • 15:00
2
Laethanta
9843 Design and Build Capacity Enhancement Works at Connolly Station
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
42 Months
Luach an chonartha
€34,000,000
Spriocdháta
20.11.2026 • 12:00
20
Laethanta
Masts and Towers - Ballydavid
●Raidió Teilifís Éireann ( RTÉ )
●Raidió Teilifís Éireann ( RTÉ )
Design, supply, construction of a new 54m self-supporting tower at Ballydavid, Co. Kerry
Suíomh
Ballydavid, Ireland
Tréimhse Seirbhíse
12 Months
Luach an chonartha
€200,000
Spriocdháta
02.11.2026 • 13:00
2
Laethanta
Raheen Group Water Scheme Watermain Replacement
●Raheen Group Water Scheme
●Raheen Group Water Scheme
The project involves the replacement of circa 2.3km of existing watermain, together with installation of new booster pump station and ancillary works
Suíomh
Tuamgraney, Ireland
Tréimhse Seirbhíse
4 Months
Luach an chonartha
€900,000
Spriocdháta
17.11.2026 • 12:00
17
Laethanta
Garden Design for Knockreer Gardens Killarney National Park
●Department of Housing Local Government and Heritage
●Department of Housing Local Government and Heritage
Tenders are being sought for the preparation of a Conservation Design and Development Plan (CDDP) focused on the long-term practice of conservation horticulture at Knockreer House Gardens. The CDDP will be guided by best international practice in conservation design and interpretation.
Suíomh
Wexford, Ireland
Tréimhse Seirbhíse
12 Months
Luach an chonartha
€70,000
Spriocdháta
27.01.2027 • 15:00
88
Laethanta
●Tipperary County Council
Architectural Services – Public Realm, Conservation Architectural Services, Landscape Architectural Services, Civil and Structural Engineering Services, Quantity Surveying Services, Project Management Services, Project Supervisor Design Process (PSDP) Services, Employer’s Representative Services, Public Liaison / Stakeholder Engagement Services, Mechanical and Electrical Engineering Services, Planning Services, Archaeological Services, Fire Engineering Services. The Architect will act as Lead Consultant and will be responsible for coordinating and managing the full multi-disciplinary design team, programme, cost and delivery of the projects. During the construction stage, the Design Team will be required to provide ongoing technical support, respond to queries arising on site and advise on proposed variations and other matters affecting the delivery of the works.
Suíomh
Clonmel, Ireland
Tréimhse Seirbhíse
48 Months
Luach an chonartha
€800,000
Spriocdháta
04.11.2026 • 12:00
4
Laethanta
●Bus Eireann/Irish Bus
Supply, Installation and Annual Maintenance of EV Chargers for Buses. Turnkey solution for the supply and installation of electric vehicle charging infrastructure including complete project management, electrical and civil works, transformers, chargers and charging points, back-office support protocols and training of relevant Bus Éireann staff. Provision of suitable energy storage systems or other sustainable backup systems. Services provided on a novated basis to a lead contractor for larger depot construction projects. Compliance with all relevant Irish and European statutory regulations and international standards. Charging protocols: 150kW IEC 61851 Mode 4 DC (CCS 2.0 Combo 2), 3 phase DC EV Charger 120kW-180kW (CCS 2.0 Combo 2), 3 phase DC EV Charger 30kW-60kW (CCS 2.0 Combo 2), 3 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 22kW (IEC 61851 Mode 3), 1 phase AC EV Charger 7kW (IEC 61851 Mode 3).
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
not less than 5 years
Spriocdháta
29.08.2027 • 15:00
302
Laethanta
Tairiscintí Gaolmhara in Tógáil
Aimsigh deiseanna eile san earnáil chéanna