Aimsigh do chonradh foirfe.

Cuardaigh tairiscintí trí chuideachtaί go láithreach

RY

Ryan & Associates

Tógáil

Galway, Galway, Éire
fire safetyaccessibilityassigned certification

Tairiscintí Meaitseáilte

Emergency Works (Co. Wicklow Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services projects comprising of * Improving Disability Access to the Main Entrance in Glenart College, Arklow, Co. Wicklow. * Roof repair works on the main school building and sports hall in Avondale Community College, Rathdrum, Co. Wicklow.

ArchitekturNotfallmaßnahmenSchulen

Suíomh

Dublin, Irland

Tréimhse Seirbhíse

18 Monate

Uasluach

85.000 €

Spriocdháta

23.08.202621:45

25

Laethanta

Emergency Works (Co. Kildare Schools)

Kildare and Wicklow Education and Training Board

Architectural Consultancy Services for emergency works including: repair of defective render at Athy Community College, replacement and automation of doors at Ard Scoil Rath Iomghain, and roof repair works to prefabricated buildings and the PE hall at Ard Scoil Rath Iomghain.

Architectural servicesEmergency worksSchools

Suíomh

Ireland

Tréimhse Seirbhíse

18 Months

Uasluach

47.000 €

Spriocdháta

23.08.202621:45

25

Laethanta

Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)

Kildare County Council_385

Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.

Civil EngineeringHighways ConsultancyBridge Design

Suíomh

Ireland

Tréimhse Seirbhíse

39 Months

Uasluach

300.000 €

Spriocdháta

25.08.202614:00

27

Laethanta

Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works

Tipperary County Council

The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.

Architectural DesignEngineering ConsultancyConstruction Supervision

Suíomh

Mid-West, Ireland

Tréimhse Seirbhíse

18 Months

Spriocdháta

20.08.202610:00

22

Laethanta

Professional Services for the preparation of a Masterplan for Castletown Estate and Donaghcumper Estate and their historic landscapes

Office of Public Works (OPW)

Professionelle Dienstleistungen zur Erstellung eines Masterplans für Castletown House und Donaghcumper House sowie ihre historischen Landschaften durch ein interdisziplinäres Design-Team.

MasterplanLandschaftsarchitekturDesignberatung

Suíomh

Dublin, Irland

Tréimhse Seirbhíse

6 Monate

Spriocdháta

03.09.202610:00

36

Laethanta

Development of a New NPWS Visitor Park Centre for The Burren National Park

Department of Housing Local Government and Heritage

Provision of Architect or Engineer led Design Team Consultancy Services for development at 1-2 Riverview, Church Street, Newtown, Corofin, Co Clare V95 ANP8. The development will consist of: The demolition of 1-2 Riverview buildings and associated outbuildings and boundary wall and the development of a single storey NPWS Visitor Centre for The Burren National Park, 3 storey NPWS office building, car parking facilities with associated vehicle access points and ramp and all associated site development, boundary and landscaping works.

ArchitekturBauentwurfPlanung

Suíomh

Corofin, Irland

Tréimhse Seirbhíse

50 Monate

Spriocdháta

21.08.202610:00

23

Laethanta

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly

Offaly County Council_448

Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)

Bridge rehabilitationStructural engineeringDesign consultancy

Suíomh

Ireland

Tréimhse Seirbhíse

60 Months

Uasluach

2.000.000 €

Spriocdháta

14.08.202614:00

16

Laethanta

Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport

Shannon Airport Authority DAC

Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.

ArchitekturIngenieurwesenInfrastruktur

Suíomh

Shannon, Ireland

Tréimhse Seirbhíse

28 Months

Spriocdháta

24.08.202611:00

26

Laethanta

Establishment of a Single Party Framework for a Single Point Design Team for Nicholas Street Public Realm Project

Limerick City and County Council_103432

Establishment of a Single Point Design Team to progress the approved scheme initially through detailed design and tender procurement with potential to include the services for the construction, handover and close-out phases. The project seeks to improve the quality, accessibility, functionality and appearance of the public realm while respecting and enhancing the area's historic character.

Architectural servicesUrban planningDesign team

Suíomh

Limerick, Ireland

Tréimhse Seirbhíse

42 Months

Uasluach

1.300.000 €

Spriocdháta

14.08.202612:00

16

Laethanta

FIN-21 - Architectural and Project Management Services

Health Information and Quality Authority (HIQA)

Architectural and Project Management Services. As a result of modern and changing work practices as well as significant growth of the organisation, the Health Information and Quality Authority (HIQA) has a requirement to explore and scope the redesign of its offices in Cork and in Dublin.

ArchitekturProjektmanagementBüroumbau

Suíomh

Dublin, Irland

Tréimhse Seirbhíse

5 Years

Spriocdháta

07.08.202613:00

9

Laethanta

1 / 2

Tairiscintí Gaolmhara in Tógáil

Aimsigh deiseanna eile san earnáil chéanna

Integrated Design Team Services for New Municipal Cemetery at Letterkenny, County Donegal

Ireland

Architectural ServicesCemetery ConstructionDesign Team

Spriocdháta

23.08.2026

25

Laethanta

St. Ciaran's Community School Kells

Kells, Irland

Elektrische InstallationNotbeleuchtungFeueralarm

Spriocdháta

13.08.2026

15

Laethanta

Construction of extensions at Mooncoin Junior and Senior Schools Scoil Mhuire NS Mooncoin Co. Waterford

Mooncoin, Irland

SchulbauErweiterungBauarbeiten

Spriocdháta

21.08.2026

23

Laethanta

Refurbishment and Extension of New Ross Library

Ireland

BauarbeitenSanierungErweiterung

Spriocdháta

17.08.2026

19

Laethanta

Carrick on Shannon Parks Project (Transformation of 4 Urban Green Areas) in Carrick on Shannon, Co Leitrim

Carrick on Shannon, Irland

ArchitekturLandschaftsplanungStadtentwicklung

Spriocdháta

07.09.2026

40

Laethanta

TEN2600141 - CfT for Construction of 44 Units at Lios na Ri, Cootehill, Co. Cavan for Cavan County Council

Cavan, Irland

WohnbauMehrfamilienhausBauarbeiten

Spriocdháta

31.08.2026

33

Laethanta

Fit-Out, Landscaping and Equipment Supply

Inis Meáin, Irland

KüchengeräteLieferungGastronomie

Spriocdháta

21.08.2026

23

Laethanta

9840 Design and Build Enabling Works at the DART+ and MetroLink Interface at Glasnevin

Dublin, Ireland

ConstructionRailwayDesign and Build

Spriocdháta

25.08.2026

27

Laethanta

Employers representative, technical advisory and assigned certifier services for the Project Barrow Social Housing Design and Build Contract

Dublin, Irland

ArchitekturBauberatungÜberwachung

Spriocdháta

27.08.2026

29

Laethanta

Cassan Sound Pier/Breakwater Structural Repairs 2026 - Donegal County Council

Ireland

Pier constructionStructural repairsConcrete works

Spriocdháta

14.08.2026

16

Laethanta

Refurbishments and Extension at Cape Clear Heritage Centre at Oileán Chléire, Co. Corcaigh

Cape Clear, Ireland

RefurbishmentExtensionConstruction

Spriocdháta

28.08.2026

30

Laethanta

26-108 St. Mary's Primary School Dungarvan - Climate Action and Fabric Defects Works

Dungarvan, Ireland

BauarbeitenSanierungDämmung

Spriocdháta

12.08.2026

14

Laethanta

Deer fencing of 1.7 Ha yew woodland, Killarney National Park.

Killarney, Irland

ZaunbauEibenwaldNaturschutz

Spriocdháta

12.08.2026

14

Laethanta

HSE Estates SW: Regional Design Team Major Framework (€50M - €400M) 2025 for HSE South West Region

Irland

ArchitekturBauingenieurwesenRahmenabkommen

Spriocdháta

31.08.2026

33

Laethanta

Alterations of an existing building to form new handball alley with associated development works at Lavey GAA grounds

Cavan, Irland

HandballbahnUmbauBauarbeiten

Spriocdháta

12.08.2026

14

Laethanta