Aimsigh do chonradh foirfe.
Cuardaigh tairiscintí trí chuideachtaί go láithreach
Prochem Engineering
Seirbhísí Gnó
Tairiscintí Meaitseáilte
Multi-Party Framework Agreement for Energy Efficient Design Services as part of an Architect Led Design Team to deliver multiple Enabling Works Projects at University Hospital Galway
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Multi-Party Framework agreement for Energy Efficient Design (EED) on an established design team framework for services awarded on a cascade or mini competitions at sole discretion of the Client for Enabling Works projects an indicative value of typically €1.5m to €20m at University Hospital Galway and off campus.
Suíomh
Galway, Irland
Tréimhse Seirbhíse
4 Monate
Uasluach
15.000.000 €
Spriocdháta
21.08.2026 • 15:00
23
Laethanta
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in Dublin region in the Republic of Ireland.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
84 Months
Uasluach
1.200.000 €
Spriocdháta
24.08.2026 • 10:00
25
Laethanta
HSE Estates SW: Regional Design Team Major Framework (€50M - €400M) 2025 for HSE South West Region
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Regionales Rahmenabkommen für HSE Design Team Services 2025 für Hauptkapitalmaßnahmen mit Projektwerten zwischen 50 Mio. und 400 Mio. EUR (exkl. MwSt.). Rahmen für Architektenleistungen (einschließlich Planer und BIM-Information Manager), Mengenverwalter, Gebäudeingenieur, Bauingenieur für zivil- und strukturelle Arbeiten, Brandschutzberater, Projektüberwachungs-Design-Prozess (PSDP), Auftraggebervertreter, energieeffizientes Design-Facilitator und Zuweisender Zertifikatgeber.
Suíomh
Irland
Tréimhse Seirbhíse
48 Monate
Uasluach
800.000.000 €
Spriocdháta
31.08.2026 • 10:00
32
Laethanta
The provision of Regulatory services for Phase 2 of BnM’s Peatland Rehabilitation Scheme
●Department of Climate Energy and the Environment
●Department of Climate Energy and the Environment
The Services comprise the necessary regulatory services to underpin Phase 2 of BnM's Peatland Rehabilitation Scheme, which will consist of the rehabilitation of up to circa 8,300 hectares (ha) and associated decommissioning works on BnM peatlands. This includes, at a minimum, the continuation of services for Phase 2 in relation to: ecology, hydrology, GIS, remote sensing and associated administration.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
54 Months
Uasluach
2.025.000 €
Spriocdháta
22.08.2026 • 10:00
23
Laethanta
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Suíomh
Ireland
Tréimhse Seirbhíse
39 Months
Uasluach
300.000 €
Spriocdháta
25.08.2026 • 14:00
27
Laethanta
TR5679 - Mechanical and Electrical Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Mechanical and Electrical Professional Services to support the delivery of capital and minor works projects in the Dublin Region.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
7 Months
Uasluach
1.200.000 €
Spriocdháta
17.08.2026 • 10:00
18
Laethanta
Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service
●Roscommon County Council_424
●Roscommon County Council_424
Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. Roscommon
Suíomh
Roscommon, Ireland
Tréimhse Seirbhíse
3 Years
Spriocdháta
07.08.2026 • 14:00
9
Laethanta
Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works
●Tipperary County Council
●Tipperary County Council
The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.
Suíomh
Mid-West, Ireland
Tréimhse Seirbhíse
18 Months
Spriocdháta
20.08.2026 • 10:00
21
Laethanta
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Suíomh
Ireland
Tréimhse Seirbhíse
60 Months
Uasluach
2.000.000 €
Spriocdháta
14.08.2026 • 14:00
16
Laethanta
Civil and Structural Engineering Consultancy Services (Design) and PSDP Consultancy for Monaghan Blackwater Sluices Access Design
●Office of Public Works (OPW)
●Office of Public Works (OPW)
To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. Monaghan.
Suíomh
Border, Ireland
Tréimhse Seirbhíse
18 Months
Uasluach
145.000 €
Spriocdháta
17.08.2026 • 13:00
19
Laethanta
Tairiscintí Gaolmhara in Seirbhísí Gnó
Aimsigh deiseanna eile san earnáil chéanna