Aimsigh do chonradh foirfe.
Cuardaigh tairiscintí trí chuideachtaί go láithreach
Tá Mulcon. ag feidhmiú san earnáil Tógáil. Suíomh: Dublin, Leinster.
Táirgí agus seirbhísí
- Construction work for multi-dwelling buildings and individual houses
- Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
- Construction work for buildings relating to education and research
- Construction work for buildings relating to health and social services, for crematoriums and public conveniences
- Construction work for buildings relating to law and order or emergency services and for military buildings
- Inflatable buildings construction work
- Construction work for bridges and tunnels, shafts and subways
- Construction work for engineering works except bridges, tunnels, shafts and subways
- Construction, foundation and surface works for highways, roads
- Electrical wiring and fitting work
Tairiscintí Meaitseáilte
The Design and Construction of Stapolin Square Phase 2 Housing Development (Pro421)
●The Land Development Agency
●The Land Development Agency
Design and construct Phase 2 of the Stapolin Square mixed-tenure housing development in Baldoyle, Dublin 13. The procurement may also cover subsequent phases as described in the PQQ.
Suíomh
Baldoyle, Dublin 13, Ireland
Tréimhse Seirbhíse
89 months
Luach an chonartha
€525,000,000
Spriocdháta
16.11.2026 • 16:00
28
Laethanta
Multi-Party Framework Agreement for Civil Engineering Works at Dublin Port
●Dublin Port Company_411
●Dublin Port Company_411
Deliver a broad range of civil engineering and associated capital works at Dublin Port and other DPC-controlled lands, including marine and quay works, dredging, roads, bridges, drainage, utilities, remediation, buildings and port electrification. Framework members must be capable of delivering the full range, individually or as a consortium.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
72 months
Luach an chonartha
€250,000,000
Spriocdháta
12.11.2026 • 12:00
24
Laethanta
●Office of Public Works (OPW)
Provide works contractor services, including the role of PSCS, for conservation and adaptation of 14–17 Moore Street and construction of a new visitor facility at 8–9 Moore Lane, Dublin 1.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
14 months
Luach an chonartha
€14,400,000
Spriocdháta
12.11.2026 • 12:00
24
Laethanta
●Tipperary Education and Training Board_1284
Provide mechanical and electrical contracting services, inclusive of PSCS, for gas upgrade works at Coláiste Mhuire Co-Ed, Castlemeadows, Thurles, Co. Tipperary.
Suíomh
Thurles, County Tipperary, Ireland
Tréimhse Seirbhíse
15 months
Luach an chonartha
€67,000
Spriocdháta
30.10.2026 • 12:00
11
Laethanta
TII499 Luas Finglas Main Infrastructure Design and Construction Works
●Transport Infrastructure Ireland (TII)
●Transport Infrastructure Ireland (TII)
Design and construction of the 4 km Luas Green Line extension infrastructure, including track, four stops, Broombridge stabling works, a 350-space Park and Ride, bridges, utilities, road and active-travel works, overhead catenary, power and rail systems, and associated urban realm and ancillary works. Includes systems integration, coordination with other works packages and stakeholders, testing and commissioning.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
54 months
Luach an chonartha
€250,000,000
Spriocdháta
14.12.2026 • 11:00
56
Laethanta
Baltinglass Town Centre Refurbishment Project Phase 1A
●Wicklow County Council
●Wicklow County Council
Construct a new town-centre public realm, including cobblestone footpaths and paved areas; strengthened and resurfaced road carriageways; landscaping and street trees; stormwater drainage and nature-based sustainable urban drainage; undergrounding overhead utilities; standalone public lighting; street furniture; bus stops with shelters; signage and road markings; and five zebra crossings (three Type A and two Type B).
Suíomh
Baltinglass, County Wicklow, Ireland
Tréimhse Seirbhíse
18 months
Luach an chonartha
€3,100,000
Spriocdháta
19.11.2026 • 09:00
31
Laethanta
Construct a new pedestrian and cyclist gateway connection to the Sport Ireland Campus via the Tolka Gateway route, including pathway upgrades, underground utilities, drainage, public lighting, CCTV, retaining structures, site access and associated civil and electrical engineering works.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
4 months
Luach an chonartha
€1,500,000
Spriocdháta
28.10.2026 • 12:00
9
Laethanta
●Dublin City Council
Public Realm and road works over approx. 0.5ha and building construction and refurbishment works over approximately 600sqm. The project involves the realignment of Irishtown Road and the reconstruction and repaving of Library Square and Fitzwilliam Street with significant public realm (including high quality stone paving), landscaping and SUDs improvements, along with miscellaneous utility realignment and improvement works. The project also includes the refurbishment and extension of Ringsend Library. The Contractor will be responsible for all construction works as well as the management of traffic and safety on site.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
27 Months
Luach an chonartha
€15,000,000
Spriocdháta
30.10.2026 • 17:00
11
Laethanta
9843 Design and Build Capacity Enhancement Works at Connolly Station
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
42 Months
Luach an chonartha
€34,000,000
Spriocdháta
20.11.2026 • 12:00
32
Laethanta
●IDA Ireland
General description of the Works. Road upgrade works as denoted in the drawings. Drainage works as identified in the drawings. Relining of pipes as per drawings. Installation of new line marking and signage as per drawings. Upgrade works to the lighting within the park as identified in the lighting review. Installation of new attenuation tank and associated pipe work as designed. All associated site works.
Suíomh
IDA Business Park, Dublin Road, Killygarry, Cavan, Ireland
Tréimhse Seirbhíse
2 Months
Luach an chonartha
€900,000
Spriocdháta
20.10.2026 • 13:00
1
Lá
Tairiscintí Gaolmhara in Tógáil
Aimsigh deiseanna eile san earnáil chéanna