Aimsigh do chonradh foirfe.

Cuardaigh tairiscintí trí chuideachtaί go láithreach

MA

Matrix Exploration

Miotail agus Mianadóireacht

An Mhacadóin Thuaidh

Tá Matrix Exploration ag feidhmiú san earnáil Miotail agus Mianadóireacht.

Tairiscintí do Miotail agus Mianadóireacht

Meaitseálacha ar leibhéal tionscail

Tá na tairiscintí seo meaitseáilte bunaithe ar thionscal agus tír na cuideachta. Is féidir le húsáideoirí Premium an chuideachta seo a éileamh agus na sonraí atá in easnamh a chur leis chun meaitseálacha níos cruinne a aimsiú. See plan details

Supply of industrial salt for winter road maintenance for a period of two years

●Public Enterprise for Maintenance and Protection of Main and Regional Roads - Skopje

Supply industrial road salt for winter road maintenance under a 24-month, single-supplier framework agreement without reopening competition. Deliver to the contracting authority’s winter maintenance depots throughout North Macedonia through individual contracts.

Suíomh

Throughout North Macedonia

Tréimhse Seirbhíse

24 months

Spriocdháta

27.10.2026 • 10:00

6

Laethanta

Supply of stone aggregate for winter road maintenance for the Skopje, Avtopat, Veles, Shtip and Bitola branches

●Public Enterprise for Maintenance and Protection of Main and Regional Roads - Skopje

Supply 2,505 m³ of crushed limestone aggregate, 2-5 mm: 1,295 m³ to Avtopat, 310 m³ to Shtip and 900 m³ to Bitola. Maximum quarry-to-branch distance is 100 km. Provide a declaration of performance demonstrating the specified particle-size, density, water absorption and freeze-thaw properties.

crushed limestone aggregatewinter road maintenance2-5 mm

Suíomh

Petrovec, Shtip and Bitola, North Macedonia

Tréimhse Seirbhíse

12 months

Spriocdháta

02.11.2026 • 10:00

12

Laethanta

Tairiscintí Gaolmhara in Miotail agus Mianadóireacht

Aimsigh deiseanna eile san earnáil chéanna

Supply of stone aggregate for winter road maintenance for the Skopje, Avtopat, Veles, Shtip and Bitola branches

Petrovec, Shtip and Bitola, North Macedonia

crushed limestone aggregatewinter road maintenance2-5 mm

Spriocdháta

02.11.2026

12

Laethanta