Aimsigh do chonradh foirfe.
Cuardaigh tairiscintí trí chuideachtaί go láithreach
Locks & Hardware
Tógáil
Tá Locks & Hardware ag feidhmiú san earnáil Tógáil.
Tairiscintí do Tógáil
Meaitseálacha ar leibhéal tionscail
Tá na tairiscintí seo meaitseáilte bunaithe ar thionscal agus tír na cuideachta. Is féidir le húsáideoirí Premium an chuideachta seo a éileamh agus na sonraí atá in easnamh a chur leis chun meaitseálacha níos cruinne a aimsiú. See plan details
●St James's Hospital
Electrical infrastructure upgrade works at St James's Hospital under a framework agreement, including electrical installation, engineering and maintenance-related works.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
4 years
Luach an chonartha
€6,000,000
Spriocdháta
05.11.2026 • 13:00
1
Lá
●Wicklow County Council
Appointment of a main contractor to construct two two-bay fire stations, including office, training and welfare facilities, at Baltinglass and Dunlavin, County Wicklow.
Suíomh
Baltinglass and Dunlavin, County Wicklow, Ireland
Tréimhse Seirbhíse
18 months
Luach an chonartha
€6,500,000
Spriocdháta
12.11.2026 • 12:00
7
Laethanta
●Central Remedial Clinic
Maintenance, repair, inspection, testing, certification and associated support services for CRC hoisting and care equipment, including overhead and mobile hoists, changing tables, pool hoists, shower trolleys and weighing devices. Supply spare parts and replacement components where required.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
60 months
Luach an chonartha
€96,000
Spriocdháta
12.11.2026 • 12:00
7
Laethanta
Framework for Commercial Services to support the delivery of ESB’s capital programmes
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Multi-supplier framework for commercial services supporting the delivery of ESB’s capital programmes and providing services across ESB Group, including Engineering and Major Projects, ESB Networks, and ESB Generation and Trading. Services are to be delivered in accordance with the RFT scope, framework agreement and associated schedules.
Suíomh
Ireland
Tréimhse Seirbhíse
8 years; five (5) years with an option to extend, at the Contracting Entity’s discretion, for a further period or periods of up to three years, in increments of two plus one year basis (i.e. for a further 2+1 years)
Luach an chonartha
€50,000,000
Spriocdháta
09.11.2026 • 14:00
5
Laethanta
Mechanical and Carpentry Services Contract
●Stewarts Care Ltd.
●Stewarts Care Ltd.
Provision of fully qualified plumber and fully qualified carpenter for 5 days per week/52 weeks per year
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
36 Months
Luach an chonartha
€770,000
Spriocdháta
11.11.2026 • 13:00
7
Laethanta
Integrated Design Team Services for the Delivery of the Letterkenny Transport Hub
●Donegal County Council_1193
●Donegal County Council_1193
The project is required to deliver a Transport Hub capable of meeting the long term needs of Letterkenny. Key interventions include a public building, public realm, bus bays, taxi rank, parking and all associated works.
Suíomh
Letterkenny, Ireland
Tréimhse Seirbhíse
42 Months
Luach an chonartha
€700,000
Spriocdháta
06.11.2026 • 17:00
2
Laethanta
Consultancy Services to prepare a Strategic Assessment and Preliminary Business Case in relation to the provision of Irish-language based early-years (Naíonra) facilities in Dún Gar
Suíomh
Dungarvan, Ireland
Tréimhse Seirbhíse
9 Months
Spriocdháta
05.11.2026 • 13:00
1
Lá
●Tipperary County Council
Technical services for an Engineering Consultancy led, Multi-Disciplinary Design Team for the Clonmel Link Roads
Suíomh
Clonmel, Ireland
Tréimhse Seirbhíse
44 Months
Luach an chonartha
€900,000
Spriocdháta
06.11.2026 • 14:00
2
Laethanta
9843 Design and Build Capacity Enhancement Works at Connolly Station
●Iarnród Eireann-Irish Rail
●Iarnród Eireann-Irish Rail
Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
42 Months
Luach an chonartha
€34,000,000
Spriocdháta
20.11.2026 • 12:00
15
Laethanta
Raheen Group Water Scheme Watermain Replacement
●Raheen Group Water Scheme
●Raheen Group Water Scheme
The project involves the replacement of circa 2.3km of existing watermain, together with installation of new booster pump station and ancillary works
Suíomh
Tuamgraney, Ireland
Tréimhse Seirbhíse
4 Months
Luach an chonartha
€900,000
Spriocdháta
17.11.2026 • 12:00
12
Laethanta
Tairiscintí Gaolmhara in Tógáil
Aimsigh deiseanna eile san earnáil chéanna