Aimsigh do chonradh foirfe.
Cuardaigh tairiscintí trí chuideachtaί go láithreach
Greenstone Structures
Tógáil
Tá Greenstone Structures ag feidhmiú san earnáil Tógáil.
Tairiscintí do Tógáil
Meaitseálacha ar leibhéal tionscail
Tá na tairiscintí seo meaitseáilte bunaithe ar thionscal agus tír na cuideachta. Is féidir le húsáideoirí a bhfuil cuntas gníomhach FREE acu an chuideachta seo a éileamh agus na sonraí atá in easnamh a chur leis chun meaitseálacha níos cruinne a aimsiú. See plan details
New tender for an extension to Causeway Comprehensive School Kerry
●Kerry Education and Training Board
●Kerry Education and Training Board
Construct a new 1,753 m², two-storey school extension with classrooms, specialist teaching rooms, ancillary rooms and a Special Needs Unit. Complete associated siteworks and abnormal works, following the architect’s phasing drawing.
Suíomh
County Kerry, Ireland
Tréimhse Seirbhíse
20 months
Luach an chonartha
€9,000,000
Spriocdháta
16.11.2026 • 12:00
4
Laethanta
Baltinglass Town Centre Refurbishment Project Phase 1A
●Wicklow County Council
●Wicklow County Council
Construct a new town-centre public realm with cobbled footpaths, paved areas and strengthened, resurfaced roads. Works include landscaping, stormwater drainage and nature-based sustainable drainage, undergrounding overhead utilities, public lighting, street furniture, bus shelters, signage, road markings and five zebra crossings.
Suíomh
Baltinglass, County Wicklow, Ireland
Tréimhse Seirbhíse
18 months
Spriocdháta
19.11.2026 • 09:00
7
Laethanta
CfT for fitout and renovations of Day Services Hub - Tallaght Cross
●Enable Ireland Disability Services Ltd
●Enable Ireland Disability Services Ltd
Convert and fit out an existing ground-floor retail unit as a Day Care Centre and Day Services Hub. Works include internal alterations, accessible sanitary facilities, finishes, mechanical and electrical services, fire safety, accessibility, signage and associated completion works.
Suíomh
Tallaght Cross, Tallaght, Dublin, Ireland
Tréimhse Seirbhíse
12 months
Luach an chonartha
€480,000
Spriocdháta
24.11.2026 • 16:00
13
Laethanta
Schools Energy Pathfinder 2025 - Biomass Programme - Biomass Package - Bundle 5 (LWETB)
●Longford and Westmeath Education and Training Board
●Longford and Westmeath Education and Training Board
Supply, deliver, install and commission modular containerised biomass cabins and associated plantroom equipment at six schools. Supply and deliver wood pellets, sell heat, and operate, maintain, repair and replace the equipment under a separate 15-year energy supply contract.
Suíomh
County Longford and County Westmeath, Ireland
Tréimhse Seirbhíse
15 years
Luach an chonartha
€3,600,000
Spriocdháta
17.11.2026 • 12:00
5
Laethanta
Multi-Party Framework Agreement for Civil Engineering Works at Dublin Port
●Dublin Port Company_411
●Dublin Port Company_411
Deliver a broad range of civil engineering and associated capital works at Dublin Port and other DPC-controlled lands, including marine and quay works, dredging, roads, bridges, drainage, utilities, remediation, buildings and port electrification. Framework members must be capable of delivering the full range, individually or as a consortium.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
72 months
Luach an chonartha
€250,000,000
Spriocdháta
12.11.2026 • 12:00
20
Uaireanta
2026 - 702 Schools Energy Pathfinder 2025 - Biomass Programme - Biomass Package - Bundle 4 (CMETB)
●Cavan and Monaghan Education and Training Board
●Cavan and Monaghan Education and Training Board
Supply, deliver, install and commission containerised biomass cabins and plant equipment at six schools, then supply wood pellets and sell heat. Provide full operation, maintenance, repair and equipment replacement under a separate 15-year energy supply contract.
Suíomh
County Cavan and County Monaghan, Ireland
Tréimhse Seirbhíse
15 years
Luach an chonartha
€3,920,000
Spriocdháta
18.11.2026 • 12:00
6
Laethanta
The Design and Construction of Stapolin Square Phase 2 Housing Development (Pro421)
●The Land Development Agency
●The Land Development Agency
Design and construct Phase 2 of the Stapolin Square mixed-tenure housing development in Baldoyle, Dublin 13. The procurement may also cover subsequent phases as described in the PQQ.
Suíomh
Baldoyle, Dublin 13, Ireland
Tréimhse Seirbhíse
89 months
Luach an chonartha
€525,000,000
Spriocdháta
16.11.2026 • 16:00
5
Laethanta
Schools Energy Pathfinder 2025 - Biomass Programme - Biomass Package - Bundle 6 (DDLETB)
●Dublin and Dun Laoghaire Education and Training Board
●Dublin and Dun Laoghaire Education and Training Board
Supply, deliver, install and commission containerised biomass cabins and associated plant and equipment at six school sites in County Dublin. Supply and deliver wood pellets, sell heat, and operate, maintain, repair and replace the equipment under a separate energy supply contract.
Suíomh
County Dublin, Ireland
Tréimhse Seirbhíse
15 years
Luach an chonartha
€5,450,000
Spriocdháta
17.11.2026 • 12:00
5
Laethanta
Provision of Equipment Installation Support Works
●National Transport Authority_1149
●National Transport Authority_1149
Provide expert installation, operation and commissioning support for bus ticketing and related equipment, including power and communications cables and mounting poles. Commission buses and conduct acceptance tests, advise third-party providers, manage and implement proofs of concept, and quality-check third-party deliverables.
Suíomh
Ireland
Tréimhse Seirbhíse
60 months
Luach an chonartha
€3,650,000
Spriocdháta
12.11.2026 • 12:00
20
Uaireanta
ET2607 - Provision of an Interactive and Connected Breathalyser Terminal Service
●Road Safety Authority (RSA)
●Road Safety Authority (RSA)
Provide an interactive, connected breathalyser terminal service for the Road Safety Authority, as detailed in the tender requirements.
Suíomh
Ireland
Tréimhse Seirbhíse
84 months
Luach an chonartha
€1,500,000
Spriocdháta
04.12.2026 • 10:00
22
Laethanta
Tairiscintí Gaolmhara in Tógáil
Aimsigh deiseanna eile san earnáil chéanna