GRAPH ARCHITECTS
Tógáil
Tá GRAPH ARCHITECTS ag feidhmiú san earnáil Tógáil. Suíomh: Dublin, Leinster.
Táirgí agus seirbhísí
- Architectural services for buildings
- Architectural services for outdoor areas
- Feasibility study, advisory service, analysis
- Project and design preparation, estimation of costs
- Draft plans (systems and integration)
- Calculation of costs, monitoring of costs
- Approval plans, working drawings and specifications
- Determining and listing of quantities in construction
- Supervision of building work
- Supervision of project and documentation
Tairiscintí Meaitseáilte
●Health Service Executive (HSE)
Appoint a design team through the existing Zone B enabling framework for renovation, refurbishment and fit-out of a light industrial unit. The facility will support decanting non-acute services from the UHG campus.
Suíomh
Galway, Ireland
Tréimhse Seirbhíse
41 months
Luach an chonartha
€25,000,000
Spriocdháta
11.11.2026 • 12:00
22
Laethanta
The Fort Museum and Event Centre, Cultural Quarter, Portlaoise, Co. Laois.
●Laois County Council
●Laois County Council
Appoint an experienced, suitably qualified architectural-led design team for the heritage-led urban regeneration project at the Fort Museum and Event Centre.
Suíomh
Portlaoise, County Laois, Ireland
Tréimhse Seirbhíse
4 years
Luach an chonartha
€300,000
Spriocdháta
30.10.2026 • 12:00
10
Laethanta
Pre-qualification of architect-led integrated design teams for a single-party framework, with the new two-bay fire station on Johnstown Road, Rathdowney, as the initial contract.
Suíomh
Rathdowney, County Laois, Ireland
Tréimhse Seirbhíse
4 years
Luach an chonartha
€800,000
Spriocdháta
11.11.2026 • 12:00
22
Laethanta
Multi Operator Framework for Project Managers with Design/Technical Consultants for Educational Accommodation
●Department of Education and Youth
●Department of Education and Youth
The Project Management Services that are being procured under this competition are for the organising, overseeing and management, procurement and delivery of SEN refurbishing within existing school buildings and/or the provision of modular accommodation for SEN and/or mainstream classroom and ancillary space with associated site works. The services will include both the management and the delivery of the services. The successful Project Management Firm shall receive a brief from the Department of Education and Youth to refurbish existing spaces within a school for a new purpose or to deliver a new accommodation on the grounds of an existing school or a combination of both. The required Project Management service will comprise of three parts A, B and C. Part A will consist of the successful Project management firm and their Multi-Disciplinary Design Team (MDDT) visiting the school to assess the most economically advantageous location to the deliver the brief while identify the capacity of existing services identify risks and preparing an order of magnitude costing. Part B is only applicable to projects where the brief requires refurbishment of existing school spaces by contractors using the “Framework Agreement for Term Maintenance, Refurbishment and Upgrade Construction Works to Educational Facilities” (PW CF-11) which will be referred to as the “Refurbishing Framework” in the remainder of this document. As an Employer led design project the PM and their MDDT will develop the detailed design drawings and supervise the contractor during construction Part C will only be applicable to projects where the project brief requires additional accommodation to be delivered via the Departments of Education and Youth’s “Multi-Operator Framework Agreement for the Provision of MMC Pre-Manufactured Modular 3D Volumetric Educational Accommodation” (PW CF-02) Which will be referred to as the “Modular Framework” in the remainder of this document. As a design build contract the PM’s Multidisciplinary Design Team will become Technical Designers as they develop the preliminary brief design that the contractors will take to complete the detailed design and construct.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
48 Months
Luach an chonartha
€100,000,000
Spriocdháta
02.11.2026 • 16:00
14
Laethanta
Architectural and PSDP Professional Services
●Electricity Supply Board ( ESB )
●Electricity Supply Board ( ESB )
Architectural and PSDP professional services to support appointed design teams in delivering various construction projects across ESB's Dublin region in the Republic of Ireland.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
7 Years
Luach an chonartha
€19,965,000
Spriocdháta
29.10.2026 • 12:00
9
Laethanta
Tairiscintí Gaolmhara in Tógáil
Aimsigh deiseanna eile san earnáil chéanna