Aimsigh do chonradh foirfe.

Cuardaigh tairiscintí trí chuideachtaί go láithreach

DE

Des Nally Developments

Tógáil

Tá Des Nally Developments ag feidhmiú san earnáil Tógáil.

Tairiscintí do Tógáil

Meaitseálacha ar leibhéal tionscail

Tá na tairiscintí seo meaitseáilte bunaithe ar thionscal agus tír na cuideachta. Is féidir le húsáideoirí Premium an chuideachta seo a éileamh agus na sonraí atá in easnamh a chur leis chun meaitseálacha níos cruinne a aimsiú. See plan details

●An Post_391

Supply, installation and commissioning of solar photovoltaic systems at An Post properties throughout the Republic of Ireland, with maintenance during the applicable warranty period. The system may also be used for later call-offs for support, maintenance and/or ongoing enhancements, without guaranteed volume.

Solar PV systemssolar panelsinstallation

Suíomh

Republic of Ireland

Tréimhse Seirbhíse

04/11/2026 -; 10 years; An Post reserves the right to extend or close the panel early in line with Operational Requirements; maintenance during the applicable warranty period

Spriocdháta

30.11.2031 • 23:59

1851

Laethanta

●Office of the Revenue Commissioners_366

Provide a maritime data analysis system that captures, collects, stores, searches, queries, visualises and updates maritime big data; analyses maritime risks and identifies or categorises high-risk threats; and produces risk alerts or profiles, periodic strategic overviews and maritime area analyses for border, coast guard and law enforcement authorities.

Maritime data analysis systemmaritime big datamaritime risk analysis

Suíomh

Ireland

Tréimhse Seirbhíse

84 months

Luach an chonartha

€1,800,000

Spriocdháta

06.11.2026 • 12:00

15

Uaireanta

Supply and fit a new gas central heating system at Scoil Úna Naofa Primary School, including mechanical and engineering works. The existing 30-year-old system is at end of life; works are to be completed in the school basement.

gas central heatingmechanical servicesengineering services

Suíomh

Crumlin, Dublin 12, Ireland

Tréimhse Seirbhíse

9 months

Luach an chonartha

€365,000

Spriocdháta

06.11.2026 • 17:00

20

Uaireanta

Appointment of a main contractor to construct two two-bay fire stations, including office, training and welfare facilities, at Baltinglass and Dunlavin, County Wicklow.

fire stationsconstructionmain contractor

Suíomh

Baltinglass and Dunlavin, County Wicklow, Ireland

Tréimhse Seirbhíse

18 months

Luach an chonartha

€6,500,000

Spriocdháta

12.11.2026 • 12:00

6

Laethanta

Maintenance, repair, inspection, testing, certification and associated support services for CRC hoisting and care equipment, including overhead and mobile hoists, changing tables, pool hoists, shower trolleys and weighing devices. Supply spare parts and replacement components where required.

maintenancerepairinspection

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

60 months

Luach an chonartha

€96,000

Spriocdháta

12.11.2026 • 12:00

6

Laethanta

●Electricity Supply Board ( ESB )

Multi-supplier framework for commercial services supporting the delivery of ESB’s capital programmes and providing services across ESB Group, including Engineering and Major Projects, ESB Networks, and ESB Generation and Trading. Services are to be delivered in accordance with the RFT scope, framework agreement and associated schedules.

commercial servicescapital programmesframework agreement

Suíomh

Ireland

Tréimhse Seirbhíse

8 years; five (5) years with an option to extend, at the Contracting Entity’s discretion, for a further period or periods of up to three years, in increments of two plus one year basis (i.e. for a further 2+1 years)

Luach an chonartha

€50,000,000

Spriocdháta

09.11.2026 • 14:00

3

Laethanta

●Stewarts Care Ltd.

Provision of fully qualified plumber and fully qualified carpenter for 5 days per week/52 weeks per year

plumbingcarpentrymaintenance

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

36 Months

Luach an chonartha

€770,000

Spriocdháta

11.11.2026 • 13:00

5

Laethanta

●Donegal County Council_1193

The project is required to deliver a Transport Hub capable of meeting the long term needs of Letterkenny. Key interventions include a public building, public realm, bus bays, taxi rank, parking and all associated works.

Landscape architectural servicesTransport HubArchitectural services

Suíomh

Letterkenny, Ireland

Tréimhse Seirbhíse

42 Months

Luach an chonartha

€700,000

Spriocdháta

06.11.2026 • 17:00

20

Uaireanta

Technical services for an Engineering Consultancy led, Multi-Disciplinary Design Team for the Clonmel Link Roads

Engineering ConsultancyMulti-Disciplinary Design TeamClonmel Link Roads

Suíomh

Clonmel, Ireland

Tréimhse Seirbhíse

44 Months

Luach an chonartha

€900,000

Spriocdháta

06.11.2026 • 14:00

17

Uaireanta

●Iarnród Eireann-Irish Rail

Design and Build Contractor to complete the design and deliver capacity enhancement and transformation works at Connolly Station. The project will create a new entrance from Preston Street and a passenger concourse within the historic Victorian undercroft, together with new lifts, escalators and staircases providing improved access to Platforms 5, 6 and 7. The works will also include additional emergency escape routes, public-realm improvements, retail, operational and back-of-house spaces, heritage refurbishment, structural alterations and the installation or modification of station and railway systems. The successful Contractor will be required to review and develop the reference design through detailed design to Approved for Construction status and subsequently construct, test and commission the works. The Contractor will also be responsible for providing complete as-built and handover information. The project will be delivered within a constrained, live operational railway environment. The Contractor will be required to manage passenger circulation, railway access, construction phasing, safety assurance, stakeholder engagement, heritage requirements and interfaces with other DART+ contracts. The appointed Contractor will undertake the role of Project Supervisor for the Construction Stage.

ConstructionRailway StationDesign and Build

Suíomh

Dublin, Ireland

Tréimhse Seirbhíse

42 Months

Luach an chonartha

€34,000,000

Spriocdháta

20.11.2026 • 12:00

14

Laethanta

Tairiscintí Gaolmhara in Tógáil

Aimsigh deiseanna eile san earnáil chéanna

Ardsallagh More Access Road

Roscommon, Ireland

Spriocdháta

02.12.2026

26

Laethanta

Mechanical Works to Salesian College Celbridge, Co. Kildare (Heating Upgrade)

Celbridge, County Kildare, Ireland

space heatingheating centerheating upgrade

Spriocdháta

24.11.2026

18

Laethanta

Dunsallagh/Killernan GWS Civil Engineering works to upgrade infrastructure

County Clare, Ireland

Spriocdháta

16.11.2026

10

Laethanta

1300m of 2.4m Height Palisade fencing at Ard Gaoithe Clonmel

Clonmel, County Tipperary, Ireland

Spriocdháta

07.12.2026

31

Laethanta

14 Tullyglass Hill

Shannon, County Clare, Ireland

Spriocdháta

03.12.2026

27

Laethanta

EWS 2no. Boiler Plant Replacement

Cork, Ireland

boiler replacementboiler plantpipework

Spriocdháta

24.11.2026

18

Laethanta

Lisnamult Access Road

Lisnamult, County Roscommon, Ireland

Spriocdháta

02.12.2026

26

Laethanta

Bunscoil Ris, Castlemoyle, New Ross - Special Education Needs Unit Works

New Ross, County Wexford, Ireland

Spriocdháta

03.12.2026

27

Laethanta

Request for Expressions of Interest for Purpose-Built Student Accommodation ("PBSA") - Potential On-Campus and Off-Campus Development Opportunities

Ireland

Purpose-Built Student AccommodationOn-Campus DevelopmentsHigher Education Institutions

Spriocdháta

27.11.2026

21

Laethanta