Aimsigh do chonradh foirfe.
Cuardaigh tairiscintí trí chuideachtaί go láithreach
Cogent Associates Ireland
Seirbhísí Gnó
Tairiscintí Meaitseáilte
The Provision of Training Services for Local Enterprise Office Longford
●Longford County Council
●Longford County Council
Lieferung von Schulungsprogrammen, Workshops, Seminaren, Mentoring und Business-Entwicklungsunterstützung für kleine Unternehmen und Unternehmer, einschließlich Start-up-Unterstützung, Unternehmenswachstum, Managemententwicklung, Digitalisierung, Nachhaltigkeit, Vertrieb und Marketing, Finanzmanagement, Innovation und andere relevante Themen.
Suíomh
Longford, Irland
Tréimhse Seirbhíse
24 Monate (01.01.2027–31.12.2028)
Uasluach
210.000 €
Spriocdháta
02.10.2026 • 10:00
62
Laethanta
Bremore Ireland Port
●Bremore Ireland Port DAC
●Bremore Ireland Port DAC
Strategische Master-Planungsberatung während der Planungs- und Genehmigungsphase des Bremore Ireland Port-Projekts, County Meath. Das Projekt umfasst einen neuen Hafen am Strand sowie ergänzende landside-Infrastruktur für Hafenspeicherung, Logistik, saubere industrielle Entwicklung, Innovation/Forschung und Gemeinschaftsanlagen, die über mehrere Phasen hinweg umgesetzt werden.
Suíomh
Bremore, Irland
Tréimhse Seirbhíse
3 Jahre
Spriocdháta
06.08.2026 • 15:00
5
Laethanta
The provision of Regulatory services for Phase 2 of BnM’s Peatland Rehabilitation Scheme
●Department of Climate Energy and the Environment
●Department of Climate Energy and the Environment
The Services comprise the necessary regulatory services to underpin Phase 2 of BnM's Peatland Rehabilitation Scheme, which will consist of the rehabilitation of up to circa 8,300 hectares (ha) and associated decommissioning works on BnM peatlands. This includes, at a minimum, the continuation of services for Phase 2 in relation to: ecology, hydrology, GIS, remote sensing and associated administration.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
54 Months
Uasluach
2.025.000 €
Spriocdháta
22.08.2026 • 10:00
21
Laethanta
Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
●Kildare County Council_385
●Kildare County Council_385
Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application.
Suíomh
Ireland
Tréimhse Seirbhíse
39 Months
Uasluach
300.000 €
Spriocdháta
25.08.2026 • 14:00
24
Laethanta
Architect or Engineer Led Integrated Multidisciplinary Design Team Consultancy services for the National Biorefinery Pilot Project (NBPP) Infrastructure Upgrade and Expansion Works
●Tipperary County Council
●Tipperary County Council
The Project comprises the upgrade and expansion of the NBPP building, including all associated design, coordination, statutory approvals, and construction supervision services. The works will be carried out within an operational (live) facility and shall include the integration of new and existing building elements, services, and systems. The Consultant's Services shall address all relevant site constraints, including continuity of operations, health and safety requirements, phasing of works, and coordination with stakeholders. The scope includes multidisciplinary design services to deliver a compliant, functional, and cost-effective solution in accordance with the Client's requirements and applicable statutory standards.
Suíomh
Mid-West, Ireland
Tréimhse Seirbhíse
18 Months
Spriocdháta
20.08.2026 • 10:00
19
Laethanta
Professional Services for the preparation of a Masterplan for Castletown Estate and Donaghcumper Estate and their historic landscapes
●Office of Public Works (OPW)
●Office of Public Works (OPW)
Professionelle Dienstleistungen zur Erstellung eines Masterplans für Castletown House und Donaghcumper House sowie ihre historischen Landschaften durch ein interdisziplinäres Design-Team.
Suíomh
Dublin, Irland
Tréimhse Seirbhíse
6 Monate
Spriocdháta
03.09.2026 • 10:00
33
Laethanta
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly
●Offaly County Council_448
●Offaly County Council_448
Multi-Party Framework for Bridge Rehabilitation Consultancy Services, Assessment, Design and Inspection for Offaly County Council - Initial Contract - Boyne Bridge and Raheenakeeran Bridge Co. Offaly. Design Consultancy Services (Stages ii to v)
Suíomh
Ireland
Tréimhse Seirbhíse
60 Months
Uasluach
2.000.000 €
Spriocdháta
14.08.2026 • 14:00
13
Laethanta
Request for Tender for Architect Led Multi-Disciplinary Design and Cost Management Team for New Airfield Vehicle Entry Screening Post, Associated Infrastructure and Ancillary Works at Shannon Airport
●Shannon Airport Authority DAC
●Shannon Airport Authority DAC
Architectural and related services, engineering design, cost management for new airfield vehicle entry screening post, associated infrastructure and ancillary works at Shannon Airport.
Suíomh
Shannon, Ireland
Tréimhse Seirbhíse
28 Months
Spriocdháta
24.08.2026 • 11:00
23
Laethanta
RFT for the Establishment of a Single Party Framework Agreement for Architectural Design Services, including Specialist Skills, for project values of less than €1m for ATU Donegal
●Atlantic Technological University
●Atlantic Technological University
Architectural Design Consultancy Services including Specialist Skills for minor works, maintenance, upgrades and refurbishment projects at its Donegal Campuses.
Suíomh
Donegal, Irland
Tréimhse Seirbhíse
48 Monate
Uasluach
350.000 €
Spriocdháta
05.08.2026 • 10:00
4
Laethanta
Procurement of an Integrated Design Team for New DV Refuge at Tailteann Drive, Navan, Co Meath for Meath Women's Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
●Meath Women’s Aid Housing Association CLG
Beschaffung eines integrierten Design-Teams bestehend aus Projektmanager, Architekt mit Landschaftsdesign-Dienstleistungen, Vertretung des Auftraggebers, Projektüberwacher für den Designprozess, Brandschutz- und DAC-Ingenieur, Design- und Zertifizierungsbeauftragte, Bauingenieur für Zivil- und Tragwerksbau, Gebäudeanlagentechniker und Kostenplaner für ein neues DV-Refugium an der Tailteann Drive, Navan, Co Meath.
Suíomh
Navan, Irland
Tréimhse Seirbhíse
42 Monate
Uasluach
750.000 €
Spriocdháta
14.08.2026 • 10:00
13
Laethanta
Tairiscintí Gaolmhara in Seirbhísí Gnó
Aimsigh deiseanna eile san earnáil chéanna