Aimsigh an tairiscint fhoirfe duit.
Cuardaigh cuideachtaí nó tairiscintí.
Boyne Electrical
Tógáil
Tá Boyne Electrical ag feidhmiú san earnáil Tógáil.
Tairiscintí do Tógáil
Meaitseálacha ar leibhéal tionscail
Tá na tairiscintí seo meaitseáilte bunaithe ar thionscal agus tír na cuideachta. Is féidir le húsáideoirí a bhfuil cuntas gníomhach FREE acu an chuideachta seo a éileamh agus na sonraí atá in easnamh a chur leis chun meaitseálacha níos cruinne a aimsiú. Féach sonraí na bpleananna
Water testing tender (Legionella)
●Irish Blood Transfusion Service
●Irish Blood Transfusion Service
Deliver a risk-based Legionella sampling and accredited analysis programme across eight IBTS locations, including water-temperature monitoring, outlet and mixing-valve checks, and storage-tank inspections. Provide water-safety reports, annual documented LRA reviews, two full LRA reassessments and incident advice. Capital and remedial construction works are excluded.
Suíomh
Ireland
Tréimhse Seirbhíse
5 years
Spriocdháta
09.12.2026 • 13:30
11
Laethanta
HSE 29798 Dynamic Purchasing System Invitation for Wound Care, Tissue Viability and Associated Products
●Health Service Executive (HSE)
●Health Service Executive (HSE)
Establish a dynamic purchasing system for the supply of wound care, tissue viability and associated products.
Suíomh
Ireland
Luach an chonartha
€245,000,000
Spriocdháta
03.12.2031 • 15:00
1831
Laethanta
●IDA Ireland
Upgrade public lighting with LED luminaires, associated rewiring, columns, mini pillars, cabling and ducting. Plane and resurface the carriageway; construct concrete footpaths and dropped kerbs; install tactile paving, renew road markings and signage, repair gullies, and trim vegetation.
Suíomh
Finisklin, County Sligo, Ireland
Luach an chonartha
€350,000
Spriocdháta
01.12.2026 • 13:00
3
Laethanta
Newbridge Southern Ring Road and Bridge for Kildare County Council
●Kildare County Council_385
●Kildare County Council_385
Construct 790 metres of the Newbridge Southern Ring Road, including a new five-span bridge approximately 170 metres long over the River Liffey. Complete tie-ins to existing roads and utilities, underground utilities, public lighting and associated works in a live environment.
Suíomh
Newbridge, County Kildare, Ireland
Tréimhse Seirbhíse
18 months
Luach an chonartha
€18,000,000
Spriocdháta
30.11.2026 • 16:00
2
Laethanta
Upgrade Works to Wicklow Town Swimming Facility
●Wicklow County Council
●Wicklow County Council
Upgrade the swimming pool and associated changing rooms and reception area at the Coral Leisure facility in Wicklow Town. Works include partial demolition and modifications, alterations and extensions to the existing building.
Suíomh
Wicklow Town, Ireland
Tréimhse Seirbhíse
11 months
Spriocdháta
14.12.2026 • 17:00
16
Laethanta
●Kildare County Council_385
Provide building services consultancy for a 48-unit social housing development on Main Street, Sallins, County Kildare.
Suíomh
Sallins, County Kildare, Ireland
Tréimhse Seirbhíse
30 months
Luach an chonartha
€50,000
Spriocdháta
10.12.2026 • 14:00
12
Laethanta
●Kildare County Council_385
Provide landscape architect consultancy services for a 48-unit social housing development on Main Street, Sallins, County Kildare.
Suíomh
Sallins, County Kildare, Ireland
Tréimhse Seirbhíse
30 months
Luach an chonartha
€40,000
Spriocdháta
10.12.2026 • 14:00
12
Laethanta
●Cork County Council
Supply one 18,000-litre bitumen sprayer and one 13,000-litre bitumen sprayer to Cork County Council.
Suíomh
Cork, Ireland
Tréimhse Seirbhíse
24 months
Luach an chonartha
€750,000
Spriocdháta
04.12.2026 • 16:00
6
Laethanta
●Kildare County Council_385
Provide civil and structural engineering consultancy, Project Supervisor Design Process (PSDP) and Assigned Certifier services for a 48-unit social housing development at Main Street, Sallins, under PW-CF2.
Suíomh
Sallins, County Kildare, Ireland
Tréimhse Seirbhíse
30 months
Luach an chonartha
€70,000
Spriocdháta
07.12.2026 • 14:00
9
Laethanta
TII499 Luas Finglas Main Infrastructure Design and Construction Works
●Transport Infrastructure Ireland (TII)
●Transport Infrastructure Ireland (TII)
Design and build the 4 km Luas Green Line extension from Finglas to Dublin city centre, including track, four stops, stabling works, a 350-space Park and Ride, bridges, roads, utilities, power, signalling and other rail systems. Coordinate interfaces and stakeholders, integrate systems, and complete testing and commissioning.
Suíomh
Dublin, Ireland
Tréimhse Seirbhíse
54 months
Luach an chonartha
€250,000,000
Spriocdháta
14.12.2026 • 11:00
16
Laethanta
Tairiscintí Gaolmhara in Tógáil
Aimsigh deiseanna eile san earnáil chéanna